Abstract
This study investigates plausible causes of damage to Shaidham Dam, a concrete-face random-fill dam in southern Jordan. The dam, owned by the Ministry of Water and Irrigation/Jordan Valley Authority, was commissioned on 3 March 2012. Significant damage to its concrete facing was reported after high reservoir levels during March 2020. Field photographs and observations document opened joints, displaced slabs and sediment-bearing seepage. The available evidence associates the damage mainly with concentrated infiltration along the right and left abutments and high hydraulic gradients through the dam body, reflecting insufficient characterization of the site geology, deficiencies in planning, engineering design and maintenance, and the absence of monitoring and dam-safety inspection during eight years of operation. Three idealized steady-state seepage scenarios were examined using three-dimensional finite element method (FEM) analyses to investigate possible flow routes and associated hydraulic and mechanical responses. The computed outputs include steady-state pore-water pressures, deviatoric stresses, deformation of the dam body, and uplift of the downstream concrete cover. The results are interpreted alongside geological and geophysical evidence as a forensic assessment; they do not establish a unique initiation sequence or provide a calibrated transient reconstruction of the failure. The reported filter gradation raises concerns regarding drainage compatibility, while the actual hydraulic effect of the filter was not explicitly simulated.
1. Introduction
Shaidham Dam is a concrete-face random-fill dam (CFRFD) located in Tafileh Governorate, 6 km east of Tafileh city, on Wadi Shaidham. The dam was built to regulate flood flows in the wadi and to provide water for irrigation and groundwater recharge. It is approximately 18 m high, with a crest elevation of 1113 m above sea level (a.s.l.). The crest length is approximately 75 m, and both the upstream and downstream faces are covered with 40 cm thick concrete slabs. The total storage capacity is approximately 0.3 MCM at an elevation of 1113 m a.s.l. The volume of the random fill (Zone 1) is approximately 29,695 m3, and that of the drain filter (Zone 3F) is approximately 2303 m3. Protection walls along the sides of the downstream face direct the flow towards the flip bucket (Figure 1 and Figure 2). The intake structure is located 40 m upstream of the dam axis, with intakes at three levels: 1102, 1107.5, and 1110.5 m a.s.l.
Figure 1.
Typical cross-section of the dam.
Figure 2.
Longitudinal section of the dam.
During the eight years of operation, the reservoir reached its maximum storage level (1113 m a.s.l.) on 31 January and 1 February 2013 (Figure 3) without any reported damage, according to communications with people who observed these events. From 2014 to 2019, no major flood entered the reservoir, and the dam was only partially filled on a few occasions.
Figure 3.
Reservoir floods of 31 January 2013 and 14 March 2020.
On 14 March 2020, the reservoir reached the spillway level, and spilling occurred during the flood (Figure 3). On the morning of the following day (15 March 2020), defects appeared in the downstream concrete slabs, leading to structural damage to the slabs and the displacement of fine materials from the dam body, including filter material and fines believed to have been carried into the dam body by the flood. No significant damage was reported in previous rainy seasons, i.e., before 14 March 2020.
Seepage under dams is an important consideration in dam design and construction. Seepage can generate high uplift pressures downstream, which may lead to instability and potential failure of the dam. In addition, uncontrolled seepage may cause catastrophic collapse of the dam structure through piping, internal erosion, sliding, or sloughing. Cut-off walls are therefore used to minimize seepage and uplift pressure. As passive anti-seepage elements, cut-off walls are constructed by excavating and removing unsuitable material down to an impermeable layer. They should be constructed of materials capable of withstanding the deformations caused by dam settlement and by the height of the wall. If a cut-off wall does not reach an impermeable layer (i.e., it is only partially penetrating), it will be inefficient at reducing uplift pressure and controlling seepage, which may lead to dam failure. For instance, the Bouzey Dam, a masonry gravity dam on the L’Aviere River near Epinal in the Vosges department, France, experienced several episodes of tilting and horizontal cracking, together with internal hydrostatic uplift and sliding failure of the masonry dam and its foundation; subsequent analyses indicated that a crack extended through the cut-off wall. The sandstone foundation of the dam was found to be cracked, and the cut-off wall at the heel of the dam did not reach the bedrock, allowing water to seep beneath the dam structure.
In general, increasing the depth of a cut-off wall reduces seepage through an earth dam and its foundation, as the cut-off depth plays a vital role in controlling seepage (Mansuri & Salmasi, 2013) [1]. Shakouri and Mohammadi [2] evaluated the penetration depth of cut-off walls in the cores of earth dams and showed that it significantly affects the flow rate, hydraulic gradient, stress, and displacement of the wall and the union area. The location of the cut-off wall is also critical, as an optimal location helps to reduce seepage rates. Kafle et al. [3] investigated the combined effects of rainfall and reservoir water-level fluctuations on slope stability. Bao et al. [4] developed a theoretical model for the progressive hydraulic failure of loess check dams and showed that the hydraulic gradient and pore-water pressure are the key factors affecting dam stability. Wu et al. [5] investigated the stability of high core rockfill dams under different drawdown rates, emphasizing that effective control of the drawdown rate and continuous monitoring of seepage pressure are key to dam safety.
Recent studies demonstrate that hydraulic response and deformation are strongly dependent on the evolution of pore-water pressure, wetting fronts, suction, and moisture-related changes in soil properties. For example, Ijaz et al. [6] analyzed the hydro-mechanical stability of unsaturated expansive-soil slopes; Ijaz et al. [7] investigated the cyclic wetting–drying response of compacted clay; and Ijaz et al. [8] experimentally examined moisture-dependent strength and compressibility of stabilized expansive soil. Although those studies concern different geomaterials and improvement treatments, they underscore the importance of moisture-dependent hydro-mechanical processes. The present work differs by reconstructing plausible seepage-related damage pathways in an existing concrete-face random-fill dam through a combined assessment of field damage, geological and geophysical evidence, and three-dimensional scenario-based analysis.
Experimental studies show that internal instability in granular soils depends on grading, soil fabric and hydraulic loading, and that some broadly graded sandy gravels may lose fines at hydraulic gradients below classical bulk critical-gradient estimates [9]. Criteria for evaluating internal stability and its relationship to particle gradation have been examined by Chapuis [10], Moffat and Fannin [11], and Kokusho and Fujikura [12]. Studies of piping initiation and critical head conditions emphasize the role of soil characteristics and seepage pathways [13,14]. The loss of fine particles can also change the hydraulic and mechanical behavior of granular materials [15]. Three-dimensional concentrations of hydraulic gradient have been investigated in other geotechnical systems, including sheeted excavations [16]. These works provide a mechanistic framework for the present forensic interpretation, but their laboratory or system-specific thresholds cannot be directly applied to Shaidham Dam without site-specific testing.
Periodic monitoring plays a vital role in dam safety and provides engineers and stakeholders with the data required to evaluate dam performance throughout the design life. The International Commission on Large Dams (ICOLD) has reported that several dams failed because of inadequate monitoring systems and procedures. According to a study by the Bureau of Reclamation on internal erosion failure modes, approximately two-thirds of all failures and one-half of all dam incidents occur during first filling or within the first 5 years of reservoir operation [17]. Dams should therefore be monitored and inspected frequently to check their performance. Regular maintenance is also essential, including the removal of trees, plants, grass, and any debris transported during floods. Soil erosion on the left and right abutments of the upstream slope should be checked, and any plants or trees growing on the abutments should be removed. The concrete cover must be inspected for cracks or displacements caused by settlement, foundation failure, or uncontrolled seepage (Figure 4).
Figure 4.
Trees, plants, and grasses growing on the left and right abutments.
The observed evidence includes cracks and opened joints in the concrete slabs, muddy discharge and loss of fine material, damaged areas near the right abutment, and geophysical indications consistent with localized subsurface voids. On the basis of these observations and the scenario-based three-dimensional analyses, we infer that infiltration through vulnerable abutment and concrete–rock interfaces may have increased pore-water pressure beneath the downstream cover and contributed to local uplift and internal erosion. The simulations support the hydraulic plausibility of this mechanism but do not establish its exact initiation time or uniquely prove its sequence. The scientific contribution lies in integrating complementary forensic evidence to evaluate competing damage pathways in a small concrete-face random-fill dam.
2. Geology of the Site
Multiple boreholes, 15–50 m deep, were drilled to investigate the geology of the study area. Boreholes on the right and left sides of the dam showed that the site is dominated by chalk, marlstone, and chert. Borehole BS2, drilled in the middle of the dam, shows friable sandstone in the upper 10 m, underlain by a marlstone and chert formation that extends to greater depth (Figure 5). Friable sandstone is characterized by high porosity and relatively low dry density [18]. Marlstone is generally characterized by low shear strength and high sensitivity to water, resulting in large volume changes (shrinkage and swelling) and a dramatic loss of strength when saturated. These properties affect structures constructed on such formations.
Figure 5.
Geological cross-section along the dam axis.
3. Internal Erosion
Case histories of dam failures worldwide provide crucial lessons for practitioners. Embankments without filters are at risk of failure by internal erosion, whereas failure is not expected in a dam with a well-designed and well-located filter, provided that the dam body and foundation are sufficiently watertight. In most failed dams, internal erosion of the dam material was initiated by concentrated leaks passing through defects, which is the first of the four internal erosion mechanisms shown in Figure 6. In earth embankments, such defects include openings along adjoining structures; cracks in the dam body at the crest caused by post-construction differential settlement; poorly compacted material in the dam body; and geologically continuous voids, joints, and cavities in the foundation or abutments. If the foundation and dam body are not watertight, the filter could be bypassed or hydraulically fractured by the reservoir head.
Figure 6.
The four mechanisms of internal erosion (original illustration, based on the description in [19]).
Backward erosion, the second mechanism, involves the detachment of soil particles where seepage exits at a free, unfiltered surface, such as karst features in the foundation, the downstream face of a homogeneous embankment, or a coarse rockfill zone. The third mechanism, contact erosion, involves the erosion of fine particles at the contact with a coarser layer, caused by flow through the coarser layer. Finally, suffusion involves the selective erosion of fine particles from the matrix of coarser particles, leaving a very coarse soil skeleton. These four mechanisms are illustrated in Figure 6.
In concrete-face random-fill dams (CFRFDs), if fractures develop in the face slab, the reservoir water pressure acts directly on the random fill, and fine particles may be washed out under high hydraulic gradients. The resulting increase in porosity and permeability allows higher flow velocities and hydraulic gradients, leading to further loss of fines. Internal erosion is therefore a progressively deteriorating process. At the same time, the modulus of the soil may decrease because of the loss of fines, allowing more deformation near the eroded zone and worsening the damage to the concrete face. Damage to the face slab and internal erosion can therefore form a self-reinforcing cycle.
Most design codes for CFRFDs do not consider the internal stability of the soils used in dam construction, and the soil gradations recommended in these codes can be internally unstable when assessed by commonly used criteria. Consequently, once the concrete face slab cracks, fine particles may be washed out by seepage flow. The soil gradation should therefore be evaluated and, where necessary, modified before construction to prevent internal erosion.
4. Differential Settlement of the Dam Body
Embankment dams undergo deformations such as compression, extension, and shear distortion during and after construction. These deformations may lead to cracks or “soft zones” where internal erosion can be initiated. The greatest deformation occurs during construction. Longitudinal displacements tend to be directed towards the center of the valley bottom, implying that horizontal compressive stresses increase in the central region and decrease towards the abutments, where extension and transverse differential settlement cracks may occur (Figure 7a). Abrupt changes in abutment slope increase the risk of tensile stress and cracking above the points where these changes occur (Figure 7b). Although most settlement occurs during construction, settlement continues for many years after completion. Transverse differential settlement cracks act as defects, and internal erosion can be initiated if water enters them.
Figure 7.
Transverse differential settlement cracks (original illustration, based on the description in [20]).
5. Filter Design
It is widely accepted that the safety of large embankment dams depends mainly on the reliable performance of their critical filters. Filters have two basic functions: to prevent erosion of particles from the soil they protect (the base soil) and to allow drainage of water from the dam body. Filter design criteria (Table 1) have evolved over the years, but the criteria published by Terzaghi [21] and by Sherard and Dunnigan [22] remain widely applied and appropriate.
5.1. Terzaghi Criteria
The quantity D15F (the particle size of the filter material for which 15% by weight is finer) reflects the particle-capture ability of the filter material (particle retention or piping criterion). The basic idea is to design the particle-size distribution of the filter so that its voids are sufficiently small to prevent erosion of the base soil; the void size of the filter is controlled by its finer particles, for which D15F is a measure [23]. In most filter design methods, the quantity D85B (the particle size of the base material for which 85% by weight is finer) represents the particle size and erodibility of the base soil. To satisfy this criterion, the Terzaghi filter criterion specifies that D15F must be less than or equal to 4 × D85B.
The filter should also be permeable enough to allow seepage to pass without building up high pore-water pressures (permeability criterion). This is normally achieved by prescribing a minimum value for the ratio D15F/D15B. The Terzaghi criterion specifies that D15F/D15B ≥ 4 or 5 and restricts the fines content of the filter to a maximum of 5% to ensure that the filter is much more permeable than the base soil. Using the Allen Hazen equation, which relates permeability (k) to the effective grain size of the soil (De), k = 100 (De)2, and assuming De = D15, it can be concluded that the Terzaghi requirement of a minimum D15F of 4 to 5 × D15B yields a filter permeability at least 16 to 25 times that of the base soil.
The gradation curve of the filter should be nearly parallel to the gradation curve of the base material.
An illustration of the Terzaghi criteria is given in Figure 8. The left-hand shaded area encloses all the grain-size curves of the base material, and the right-hand shaded area indicates the range within which the curves of the filter material must lie.
Figure 8.
Illustration of filter design criterion (original illustration with example gradations; criteria from [24]).
5.2. Sherard and Dunnigan (1989) Criteria
- -
- Particle retention criteria
Table 1.
Particle retention criteria of Sherard and Dunnigan [22].
To ensure adequate drainage (permeability criterion):
D15F/D15B > 5
The percentage of filter particles passing the 0.075 mm sieve shall be less than 5%.
Segregation during placement of the filter material should be prevented. Segregation is the separation of a graded soil into finer and coarser zones; it may occur when material is discharged downslope during dumping and spreading, with the larger particles tending to accumulate at the bottom of the slope. Broadly graded materials without sufficient fines to provide some cohesion are difficult to place without segregation. If a sufficiently coarse segregated zone develops in the filter, fines may be lost from the protected soil by internal erosion. Because the largest particles are the most sensitive to segregation, the maximum particle size of a filter should be restricted. The maximum particle size of filter material is therefore usually limited to 75 mm, and the uniformity coefficient Cu = D60F/D10F should be less than 20 to limit the potential for segregation.
5.3. Existing Filter Design for Shaidham Dam
The Dam Design Report [18] did not specify gradation envelopes for the random fill or filter materials, except for the filter material in the toe drain; the gradation envelopes for the random fill and filter materials were presented in the Dam Conditions of Contract, Specifications, and Bills of Quantity [25]. Figure 9 shows the coarse, fine, and average gradation envelopes of the filter and random-fill (base soil) materials used in Shaidham Dam. Based on the average gradation curve, D15F = 0.17 mm. From the gradation curve of the base material, D15B = 1.0 mm and D85B = 60 mm. This gives:
and
Figure 9.
Gradation envelopes of (a) the filter material (Zone 3F) and (b) the random fill (Zone 1).
This indicates that the existing filter does not satisfy the requirements of the Terzaghi [21], Terzaghi et al. [24], and Sherard and Dunnigan [22] criteria.
If the base soil is re-graded (as was suggested by some references) by omitting the material coarser than sieve #4 and setting the percent passing sieve #4 to 100%, the resulting D15B and D85B are 0.5 mm and 2.0 mm, respectively [26]. This gives:
and
This again indicates that the existing filter does not meet the requirements of either the Terzaghi [21] or the Sherard and Dunnigan [22] criteria.
The filter material in Shaidham Dam does not satisfy the permeability criterion. The filter must be sufficiently permeable to allow water to flow through it without inducing high seepage forces that could endanger its stability. The filter is subject to the same piping requirements as the protected base soil and should be permeable enough to drain both the base soil and itself under low seepage forces. The seepage force in the filter is inversely proportional to the permeability of the filter:
where Fsf is the seepage force per unit volume in the filter and kf is the permeability of the filter. Using the Hazen equation, which relates permeability to the effective grain size of the filter (taken here as D15F), it can be shown that the seepage force in a well-designed filter meeting the Terzaghi permeability criterion is 1/25 to 1/16 of that in the protected base soil, which is not the case for Shaidham Dam. During the flood of 14 March 2020, the filter system of Shaidham Dam, including the drainpipe running along the wadi on the downstream side, was not functioning. The 200 mm diameter drainpipe was partially plugged with fine materials during the flood and remained partially plugged at the time of writing. Had the drainpipe been functioning during the flood, the partial plug would have been washed out by the flow in the pipe under the large difference in total head between the upstream and downstream sides of the dam.
The filter assessment is based on the design gradation envelopes shown in Figure 9, not on direct permeability or internal-erosion tests of the as-built materials. For the average reported curves, D15F ≈ 0.17 mm and D15B ≈ 1.0 mm, yielding D15F/D15B ≈ 0.17, which is below the conventional drainage criterion discussed above. This suggests potential drainage incompatibility under the assumptions of the comparison; it does not demonstrate actual filter failure or quantify suffusion. The filter was not included as an independent material zone in the finite-element model, so its effect on the simulated pore-pressure distribution and discharge was not evaluated. The conductivity contrast between the assumed random-fill value (2500 m/day) and the filter estimate (<25 m/day) exceeds a factor of 100, not 100 orders of magnitude. The internal stability of the broadly graded fill and the effects of construction segregation remain unresolved.
6. Initial Water Infiltration into the Dam Body (Hypotheses)
On 14 March 2020, the reservoir was filled to its maximum capacity (Figure 10), and spilling occurred in Wadi Shaidham for the first or second time since the dam was constructed and put into operation in 2011. The dam then showed a sudden increase in seepage through the dam body due to the high hydraulic gradient. The downstream and upstream concrete face slabs experienced excessive deformation, resulting in cracking and fracturing of the concrete. The seepage rate from the opened expansion joints and concrete cracks on the downstream side was very high: approximately 100 L/s, as estimated by observers on 15 March 2020 (the FEA predicted approximately 340 L/s). Such a seepage rate is very high for an 18 m high dam and indicated that the dam was in danger. The owner therefore decided to empty the reservoir for safety reasons.
Figure 10.
Shaidham Dam reservoir: (a) at full impoundment, showing water whirlpools near the right abutment; (b) after the reservoir was emptied, showing the depression at the whirlpool location.
Based on the available data for Shaidham Dam, observations made during site visits, and the investigations and analyses presented in this paper, the following hypotheses regarding the origin and trajectory of the high seepage were formulated:
The rock in the right and left abutments of the reservoir close to the dam body is weathered and characterized by discontinuities, including joints, bedding planes, cracks, voids, and caves (Figure 11). Apart from the cut-off wall, no treatment was carried out in this zone during construction to reduce seepage. The cut-off wall has a variable penetration depth and extends only 16 m into the right and left abutments, terminating at penetration depths of 7 m on the right wing and 3.7 m on the left wing. Hydro-jacking and washout of the infilling material of the discontinuities in this zone, caused by limited water movement between the reservoir and the dam body, probably initiated water infiltration into the dam body. The defects in the rock in contact with the right and left abutments provided continuity and hydraulic connection between the reservoir and the dam material.
Figure 11.
Discontinuities, voids, and caves in the right abutment of the reservoir.
Once water enters the dam material through these defects, the dam body is subjected to high pressure without drainage because the drainage system of the dam was reported to be largely non-functional. When the dam base material becomes saturated, the downstream concrete face slab is subjected to high pressure, causing slab uplift, opening of expansion joints, and cracking of the face slab, which results in a high seepage rate through the downstream slab cracks and open expansion joints (Figure 12). Internal erosion of the soil, especially the filter material, is initiated, as indicated by the washed-out material and the muddy seepage from the opened expansion joints. Internal erosion of the base soil and filter material increases the void ratio and compressibility of the random fill, causing further excessive deformation and cracking of the upstream concrete face slab and further water infiltration into the dam. At certain locations (downstream side, right abutment), backward erosion (Figure 6) may progress until it reaches the bottom slab on the upstream side at the right abutment. At this stage, washout of the soil beneath this slab causes loss of support from the backfill, leading to opened joints and slab damage (Figure 13 and Figure 14). Alternatively, the loss of support and damage to the bottom upstream slab at the right abutment may result from infiltration of water through the open expansion joints (Figure 15) and washout of fine materials from beneath the slab. The external water-stop system may fail to function if a small gap exists between the water stop and the supporting fill and a high water pressure, similar to that acting on the upstream side (bottom slab), is applied. Water entering the dam material through defects in the upstream slab would then reinforce the pressure build-up and downstream seepage described above.
Figure 12.
Seepage from the open expansion joints on the downstream face.
Figure 13.
After the water level dropped approximately 3–4 m below the crest, seepage stopped except at the right abutment, indicating the formation of a flow path between the upstream and downstream sides of the dam at this location.
Figure 14.
Damaged concrete slab with an open expansion joint on the upstream face at the right abutment, indicating the formation of a flow path between the upstream and downstream sides.
Figure 15.
Open expansion joint and width of the gap between adjacent upstream slabs after movement.
As shown in Figure 10, a sinkhole appears to have formed after full impoundment. Water whirlpools (Figure 10) marked its position near the right abutment, close to the toe of the upstream face slab. After the reservoir was emptied, the concrete face slab at the toe of the upstream side at the right abutment was found to be severely damaged, with openings (Figure 14 and Figure 15).
During filling, under the applied hydrostatic pressure, the random fill, especially on the upstream side, undergoes excessive deformation, leading to movement of the upstream face slab, opening of the upstream expansion joints, local failure of the external water-stop system, and cracking and fracturing of the concrete due to high compressive and tensile stresses in the upstream face slab. The critical location is the bottom slab on the upstream side, where the opening and damaged concrete were observed. These defects in the upstream concrete face slab are points of weakness through which water begins to infiltrate the dam body.
Infiltration into the dam body may also be initiated through defects in the dam within the upper 3–4 m of the reservoir. Such defects may include voids between the face slab and the supporting random fill due to post-construction differential settlement of the crest, transverse cracks in the random fill, and poor compaction of the dam material in the upper 3–4 m of the random fill, in addition to defects in the upstream face slab and water-stop system. Water infiltration into the dam body is considered to have been initiated by at least one of the three hypotheses described above.
7. Geophysical Investigation
The main conclusions of the geophysical survey conducted at the site are summarized below; further details are given in the geophysical investigation report.
Based on the VS30 result (482 m/s), the site can be classified as Class C (very dense soil and soft rock) according to the National Earthquake Hazards Reduction Program (NEHRP).
The estimated P-wave and S-wave velocities are typical of the lithologies encountered in the study area, which is dominated by chalky and marly limestone, chert, sandstone, and weathered rock of the Wadi Umm Ghudran Formation.
The MASW-1D results indicated a low-shear-wave-velocity layer approximately 7–10 m below the dam crest, with a shear-wave velocity of 400–500 m/s, corresponding to local fill material used during construction.
The GPR data indicated several air-filled cavities below the concrete slab. Such cavities are strongly associated with subsidence features formed by washout or piping on the right side of the dam structure (Figure 13 of the geophysical investigation report).
The GPR data showed no clear evidence of large cavities, suggesting possible forced seepage along a network of small channels or pipes within the fill material. This zone was interpreted from the MASW-1D data as soft, low-rigidity material approximately 7–10 m below the dam crest (Figure 16 of the geophysical investigation report). Water entering the dam structure from the right side may have eroded a pathway through this weak, soft fill material, causing deformation of the overlying upstream and downstream concrete facing slabs. However, recent repair works, such as concrete grouting, may have filled open cavities, preventing their detection.
Figure 16.
Overview of the 3D FEM model showing the wadi, dam, reservoir water, concrete cover, and cut-off wall.
8. Finite Element Analysis: Conceptual Infiltration Model
The overall performance of the dam, including water infiltration and soil–water–structure interaction, was evaluated using a three-dimensional (3D) finite element method (FEM) analysis. The model includes the dam, the wadi, and the construction sequence (Figure 16). Seepage through unsaturated–saturated soils, as in saturated soils, is governed by Darcy’s law and the continuity equation; the governing equation for water flow through unsaturated–saturated soils is obtained by substituting Darcy’s law into the continuity equation.
Three-dimensional finite element analysis was performed using PLAXIS 3D CONNECT to simulate the soil–structure interaction and evaluate the geotechnical response under the applied loading conditions. A graded 3D tetrahedral mesh was used, with a medium global coarseness and local refinement around the dam body, concrete cover, and cut-off wall to capture high stress gradients. Coarser elements were used in the far-field wadi soil.
Although the random-fill material may have been initially unsaturated, site-specific soil-water retention curves, unsaturated hydraulic conductivity functions, and initial matric-suction measurements were not available in the source dataset. Accordingly, the presented results are interpreted as steady-state hydraulic scenarios rather than a calibrated prediction of transient unsaturated infiltration or suction loss. The influence of the antecedent saturation state on infiltration rate, pore-pressure development, and deformation remains outside the validated scope of this study.
Water infiltration was simulated using steady-state seepage analyses. The reservoir reached the spillway elevation of approximately 1113 m a.s.l. on 14 March 2020, and damage was reported the following morning. However, the available evidence does not establish the hourly reservoir-stage history, rate of filling, or duration for which the maximum hydraulic head was sustained. The steady-state models therefore represent hypothetical sustained-head conditions and should not be interpreted as time-resolved simulations of the March 2020 filling event. The development of pore-water pressure and saturation during the actual flood may have differed, and transient seepage analyses would be required to resolve the effect of filling rate and duration. The initial groundwater table was set at the base of the dam, and the wadi bed was submerged.
Three three-dimensional steady-state seepage scenarios were evaluated at a nominal reservoir elevation of 1113 m a.s.l. These simulations compare alternative idealized ingress conditions and do not represent the time-dependent filling of the reservoir. The available event history indicates that the reservoir reached the spillway level on 14 March 2020, and visible damage was reported on 15 March 2020; however, a time-resolved stage record and unsaturated hydraulic functions for the dam fill are not reported. Thus, the simulations cannot resolve initial suction, wetting-front migration, the time required to reach a given pressure, or the chronology of slab damage. The results should be interpreted as steady-state scenario responses rather than a calibrated transient reconstruction of the 2020 flood. The three scenarios are defined as follows:
Scenario 1: This scenario represents the design condition, in which the cut-off wall and the concrete cover function as designed. The reservoir level was raised to 1113 m a.s.l. The concrete cover and cut-off wall were modeled as impermeable layers that prevent seepage through the dam; water must therefore pass through the rock, according to its permeability, or beneath the cut-off wall. Note that the cut-off wall was not constructed along the entire upstream side.
Scenario 2: This scenario represents the condition in which water from Scenario 1 seeps through the upstream concrete cover and flows downstream through the concrete cover. It assumes that some joints between the upstream cut-off wall and the concrete have opened and that part of the downstream concrete cover is cracked.
Scenario 3: This hypothetical scenario assumes the Scenario 2 damage only on the downstream side, with the upstream concrete cover functioning as designed.
The three numerical scenarios prescribe alternative hydraulic-integrity conditions of the concrete and associated interfaces. They do not independently predict crack initiation, opening, or propagation. Scenario 1 assumes nominally intact concrete cover; Scenario 2 considers impaired upstream and downstream hydraulic barriers; and Scenario 3 considers an intact upstream cover with downstream impairment. The exact seepage boundary and/or interface permeability assigned to each impaired zone must be specified in the numerical model description. The resulting analyses evaluate consequences of postulated defects, rather than directly reproducing fracture development.
In addition to the steady-state flow analyses, a global stability analysis of the saturated embankment was performed. As described in Section 9, direct shear tests show a significant reduction in the shear strength of the random fill upon saturation. This analysis provides the factor of safety against global stability failure.
A mesh-convergence assessment is required to establish the numerical stability of the highly localized hydraulic-gradient and displacement predictions. In particular, peak gradients at abrupt interface transitions may be sensitive to element size. The present results should be interpreted as indicative patterns until local mesh refinement demonstrates that seepage discharge, spatially averaged hydraulic gradients, and displacement measures are sufficiently stable.
9. Material Properties
Because the model focuses mainly on seepage, the native ground was modeled as an elastic material, whereas the dam fill was modeled using the Mohr–Coulomb constitutive model. The parameters were obtained from the design report [18], which gives a friction angle of 37.2° and an effective cohesion of 47.9 kPa; after soaking, these strength parameters decrease to 21.2° and 23.4 kPa, according to the same report. The concrete cover and cut-off wall were modeled as plate elements with interfaces.
The most important parameter for the flow analyses is the permeability of the different materials. The permeability of the rock was obtained from Lugeon tests performed in three boreholes (BS1, BS2, and BS3). The interpretation of Lugeon values is summarized in Table 2, the test results are listed in Table 3, and the resulting permeability profiles are plotted against elevation in Figure 17. The permeability varies from 0.01 to 1 m/day with no distinct variation between strata; therefore, an average value of 0.1 m/day was assumed for the rock.
Table 2.
Rock-mass conditions typically associated with different Lugeon values [27].
Table 3.
Results of the Lugeon (water-pressure) tests in boreholes BS1, BS2 and BS3 [18].
Figure 17.
Permeability profiles derived from the Lugeon tests in boreholes BS1, BS2 and BS3, plotted against elevation.
Borehole data indicate a heterogeneous foundation composed of chalk, marlstone, chert, friable sandstone, and weathered or fractured rock. For the present three-dimensional seepage idealization, these units were not modeled as separately calibrated hydraulic zones. Instead, a representative effective permeability of 0.1 m/day was applied to the rock domain, based on Lugeon-derived values of approximately 0.01–1 m/day. Therefore, abutment-specific flow through joints, bedding planes, and fractures is represented only indirectly and remains an important source of uncertainty in predictions of preferential infiltration.
No permeability tests were performed on the random fill. However, its permeability can be estimated from the gradation curve (Figure 9) using the characteristic grain sizes (D10 and D20) and the fines content. For material sizes between 0.8 mm and 80 mm, the typical permeability according to Hough [28] (Table 4) is 3–10 cm/s (2600–8600 m/day). For an average D20 of 1.5 mm, a permeability of 2500 m/day was assumed for the random fill.
Table 4.
Typical permeability coefficients for different soil types (after Hough [28]).
For the filter material, a permeability of less than 25 m/day was estimated from the gradation curve (Figure 9) using Hough [28] for a D10 of 0.15 mm. For the assumed random-fill permeability of approximately 2500 m/day and estimated filter permeability of less than 25 m/day, the filter is at least about 100 times less permeable (approximately two orders of magnitude). Such a contrast may impair drainage and promote local head losses; it does not establish that flow through the filter is absent. The filter was not represented explicitly in the present numerical model, which is a limitation when interpreting the internal hydraulic response.
The hydraulic conductivity values adopted in this study should be interpreted as uncertain model inputs. The foundation-rock value of 0.1 m/day represents a simplified value selected from Lugeon-derived estimates of approximately 0.01–1 m/day at individual test intervals; it does not capture all lateral variations or preferential pathways. Conductivities of 2500 m/day for the random fill and less than 25 m/day for the filter were inferred from particle-size correlations rather than measured on as-built material. A quantitative sensitivity or mesh-convergence study was not available, and the dependence of predicted pressures, gradients and discharge on these assumptions remains unquantified. The modeled leakage of approximately 29,000 m3/day (336 L/s) is about 3.4 times the observer-based estimate of 100 L/s (8640 m3/day). Consequently, the numerical discharge is not presented as a field-validated prediction of the March 2020 event.
10. Finite Element Results
Scenario 1 represents nominally intact concrete covers and cutoff elements; Scenario 2 assumes impaired upstream and downstream hydraulic barriers; and Scenario 3 retains the upstream barrier while considering downstream damage. The three configurations are evaluated independently under the specified reservoir-head condition. Unless otherwise stated, the figures present scenario-specific model results and not measured field quantities.
According to the analysis, a perched water table formed in the dam when reservoir water infiltrated into the random fill through the rock–concrete interface above elevation 1100 m a.s.l., where no cut-off wall was installed (Figure 18). The perched water spread through the random fill and exited from the downstream slope once the water pressure exceeded the weight of the concrete cover and the strength of the joints. The analyses indicate that cracking may have occurred in the upstream concrete cover, creating an additional source of infiltration into the random fill and thereby increasing the flow and discharge. Each scenario is discussed in more detail below.
Figure 18.
Location of the cut-off wall.
The steady-state flow and hydraulic gradients for all scenarios are shown in Figure 19 and Figure 20. For Scenario 1, the simulations indicate a possible infiltration pathway through the dam between the rock and the concrete cover at the end of the cut-off wall. The flow velocity in Scenario 1 was relatively low (11 m/day); however, once the upstream concrete cover was assumed to be cracked, the flow velocity exceeded 2340 m/day through the dam body, which could erode and wash away fine material along its path.
Figure 19.
Steady-state flow contours for Scenarios 1–3 (model results).
Figure 20.
Hydraulic gradient contours for Scenarios 1–3 (model results).
The computed maximum hydraulic gradients were approximately 35.04, 10.44, and 16.77 for Scenarios 1, 2, and 3, respectively. The greater peak in Scenario 1 does not imply the greatest overall seepage flux: hydraulic head may be dissipated over a relatively short, restricted interface pathway, producing a high local gradient. In the impaired-cover scenarios, alternative flow paths can redistribute the head loss. The positions of the maximum-gradient elements and the materials across which the gradients act should be confirmed from the model output. Localized high gradients may indicate conditions favorable to internal erosion only where they coincide with erodible material and a viable transport pathway.
Figure 21 shows the steady-state water pressure for all scenarios. In Scenario 1, in which the infiltrating water is held behind the concrete cover, the water pressure exceeded 100 kPa. This pressure decreased to 50 kPa when the water found a path through the concrete joints, with a model-predicted discharge of more than 29,000 m3/day. The deviatoric stresses shown in Figure 22, which reach almost 100 kPa, indicate the damage that may have been caused to the dam in Scenarios 1–3.
Figure 21.
Steady-state pore-water pressure for Scenarios 1–3 (model results).
Figure 22.
Deviatoric stress contours for Scenarios 1–3 (model results).
Figure 23 shows the deformation of the dam materials due to groundwater infiltration and changes in hydrostatic pressure. The independent scenario calculations predicted downstream heave of approximately 9 mm in Scenario 1 and 6 mm in Scenario 2; these values are not cumulative and should not be summed. Scenario 3 separately indicated upstream settlement of approximately 13 mm; this value does not include additional movement due to the loss of material by piping, which could increase depending on the amount of fines washed away. Figure 23 and Figure 24 present deformed configurations with graphical amplification to make the displacement pattern visible. The plotted deformation scale factors are visualization settings and do not change the reported physical displacements. Restraint of such movement by the concrete cover could damage its structural integrity, as reflected in the deformation of the concrete cover shown in Figure 24. Figure 25 shows the bending moments computed in the upstream concrete cover. Figure 26 shows the flow through the concrete cover for Scenario 3. Figure 27 presents the stability analysis of the saturated dam, which gives a factor of safety greater than 2.0, considered acceptable for global stability.
Figure 23.
Deformation of the dam body for Scenarios 1–3 (model results); deformed shapes are visually magnified and not drawn to displacement scale.
Figure 24.
Uplift movement of the downstream concrete cover for Scenarios 1–3 (model results); deformed shapes are visually magnified and not drawn to displacement scale.
Figure 25.
Bending moments in the concrete cover for Scenarios 1–3 (model results).
Figure 26.
Flow through the concrete cover for Scenario 3 (model results).
Figure 27.
Deformation and pore pressure from the stability analysis (FS = 2.1).
10.1. Evidence Comparison and Competing Mechanisms
The proposed failure process is a forensic interpretation rather than a uniquely demonstrated initiation sequence. Observed evidence includes cracking and displacement of the concrete facing, open joints, sediment-bearing seepage, and localized damage near the upstream right abutment (Figure 10, Figure 11, Figure 12, Figure 13, Figure 14 and Figure 15). Geophysical anomalies are compatible with subsurface voiding or preferential flow but are not, by themselves, proof of a particular path or time of formation. The steady-state scenarios indicate that infiltration along vulnerable abutment/concrete interfaces can produce hydraulic pressure and differential movement consistent with aspects of the observed damage. Other plausible initiation routes, including upstream slab defects, water-stop discontinuities and settlement-related openings, cannot be excluded. The relative contribution and chronological order of these processes cannot be determined from the available information.
Table 5 compares the observed indicators, modeled responses, and alternative explanations using only the existing record.
Table 5.
Qualitative comparison of the existing evidence and candidate failure mechanisms. “Compatible” means that an observation is consistent with a mechanism, not that the mechanism has been uniquely verified.
10.2. Limitations and Implications for Interpretation
This investigation has several limitations. Hydraulic properties were not comprehensively measured in situ, and spatial variations among foundation lithologies, fractures, and the two abutments were simplified. The finite-element analyses represent idealized steady-state reservoir conditions without a measured flood hydrograph or calibrated unsaturated hydraulic functions. The numerical formulation does not reproduce the progressive detachment and transport of fines or evolving crack apertures and seepage pathways. Direct measurements of seepage discharge, pore pressure, deformation, and internal erosion during the 2020 event are unavailable; the reported field flow is an approximate observation rather than an instrumented validation dataset. Accordingly, the numerical results are best interpreted as a plausibility assessment of failure pathways, and the specific chronology and magnitudes remain uncertain. Further transient, heterogeneous, erosion-coupled analysis and instrumented monitoring would be needed for quantitative validation.
Under the prescribed scenario conditions, the numerical model produced downstream upward movements of approximately 9 mm (Scenario 1) and 6 mm (Scenario 2) and an upstream settlement of approximately 13 mm (Scenario 3). These are independent scenario results and should not be added to obtain a total deformation. The plotted deformed configurations are visually magnified and are not drawn to displacement scale. The corresponding pore pressures and plate responses suggest possible bending and joint distress; however, the predicted moments, stresses and uplift forces have not been checked against documented concrete-slab and joint capacities. The Mohr–Coulomb model does not capture progressive internal erosion, particle migration, or erosion-induced material degradation. The analyses therefore provide indicative hydraulic and mechanical responses, not a demonstrated coupled fracture or piping progression.
11. Conclusions
The following conclusions are drawn from the finite element analysis (FEA), the geophysical investigation, field observations, and as-built drawings.
The available field observations and steady-state scenarios indicate that infiltration through vulnerable abutment and facing interfaces is a plausible contributor to the Shaidham Dam damage. The precise initiating pathway, the effect of uncertain conductivities, and the progression of internal erosion remain unverified.
On 31 January and 1 February 2013, the reservoir reached its maximum storage level (1113 m a.s.l.) without damage (Figure 3).
The cut-off wall extended only 16 m into each abutment and reached an elevation of only 1100 m a.s.l. Rock with relatively high permeability was identified between elevations 1100 and 1113 m a.s.l. and could also have been cut off.
The analyses indicate that a perched water table formed in the dam when reservoir water infiltrated into the random fill through the rock–concrete interface where no cut-off wall was installed.
When the uplift pressure exceeded the weight of the concrete cover and the strength of the joints, the perched water exited from the downstream slope.
In the model, seepage forces and unbalanced pressures caused settlement on the upstream side and heave on the downstream side of the dam. Restraint of such movements by the concrete cover could damage its structural integrity.
When damage to the upstream concrete cover was assumed in the model, consistent with the field observations, infiltration through the random fill exceeded 2340 m/day (Figure 19), which could erode and wash away fine material. The model predicted a discharge of more than 29,000 m3/day (Figure 26) during the infiltration process; this value is not field-validated.
Even without damage to the upstream concrete cover (Scenario 3), infiltration through the interface between the concrete cover and the rock at both abutments can damage the downstream concrete cover.
The stability analysis gives a factor of safety greater than 2.0 against global stability failure, which is considered acceptable; this result does not address localized piping, abutment leakage, or concrete-slab distress.
The reported design gradation of the filter may not satisfy the drainage criterion under the stated assumptions.
Because of the high permeability of the random-fill material, such a dam can function properly only if little or no infiltration into the dam is allowed. Given the relatively high permeability of the rock at both abutments, this could have been achieved by extending the cut-off wall along the entire upstream side and down to elevation 1084 m a.s.l. Because the cut-off wall was not extended in this way, a filter coarser than the random fill could have been installed to intercept infiltration to some extent and divert the water away from the concrete cover.
The GPR data showed no clear evidence of large cavities inside the dam body, suggesting possible forced seepage along a network of small channels or pipes (piping/internal erosion) within the fill material.
Periodic maintenance of the dam was lacking.
12. Recommendations
Regular maintenance should be performed to ensure dam safety throughout the service life of the dam; many dams worldwide have failed because of a lack of timely maintenance.
Full rehabilitation of the dam would be difficult and costly. It may require extending the cut-off wall at both abutments up to the dam crest and/or grouting all weak formations in contact with the dam abutments.
The internal drainage system of the dam was reported to be largely non-functional. Possible remedial actions include investigation and rehabilitation of the drains, targeted treatment of abutment seepage pathways, joint and slab repairs, cut-off extension where technically feasible, and reduced storage; none of these options is favored here without an engineering and economic assessment.
Limiting storage to elevation 1107.5 m a.s.l. (second intake) would retain up to approximately 40% of the original reservoir capacity (Figure 28). The suggested reservoir elevation of 1107.5 m is an illustrative reduced-storage option, not an established safe operating limit. Any decision on continued operation or rehabilitation should be made by the responsible authority following a dam-safety assessment that considers local seepage and uplift, concrete-slab and joint integrity, drainage performance, flood response, and alternative rehabilitation measures. The present study is a forensic case analysis and does not provide a quantitative operating-level risk assessment.
Figure 28.
Elevation–area–capacity curves of the Shaidham reservoir.
Author Contributions
D.A.H.M.—Conceptualization; data curation; formal analysis; investigation; methodology; project administration; resources; software; validation; visualization; writing—original draft; writing—review & editing. A.I.H.M.—Conceptualization; formal analysis; investigation; methodology; supervision; validation; visualization; writing—original draft; writing—review & editing. All authors have read and agreed to the published version of the manuscript.
Funding
This research received no external funding.
Data Availability Statement
The data presented in this study are available on request from the corresponding author due to confidentiality restrictions.
Conflicts of Interest
The authors declare no conflict of interest.
References
- Mansuri, B.; Salmasi, F. Effect of horizontal drain length and cutoff wall on seepage and uplift pressure in heterogeneous earth dam with numerical simulation. J. Civ. Eng. Urban. 2013, 3, 114–121. [Google Scholar]
- Shakouri, B.; Mohammadi, M. Evaluation of penetration depth for cutoff walls in the core of earth dams. Geotech. Geol. Eng. 2020, 38, 151–167. [Google Scholar] [CrossRef] [Scilit]
- Kafle, L.; Xu, W.J.; Zeng, S.Y.; Nagel, T. A numerical investigation of slope stability influenced by the combined effects of reservoir water level fluctuations and precipitation: A case study of the Bianjiazhai landslide in China. Eng. Geol. 2022, 297, 106508. [Google Scholar] [CrossRef] [Scilit]
- Bao, H.; Liu, L.; Lan, H.; Peng, J.; Yan, C.; Xu, J.; Wang, J.; Zhang, K.; Wei, W. Progressive hydraulic failure mechanism and multi-stage instability risk early warning for loess check dams. J. Hydrol. 2025, 663, 134226. [Google Scholar] [CrossRef] [Scilit]
- Wu, Z.; Chen, C.; Zheng, Y.; Chen, J.; Bian, K.; Li, J. Analysis of seepage failure probability for high core rockfill dams during rapid drawdown of reservoir water level. J. Hydrol. 2024, 633, 131046. [Google Scholar] [CrossRef] [Scilit]
- Ijaz, N.; Ye, W.; Rehman, Z.U.; Dai, F.; Ijaz, Z. Numerical study on stability of lignosulphonate-based stabilized surficial layer of unsaturated expansive soil slope considering hydro-mechanical effect. Transp. Geotech. 2022, 32, 100697. [Google Scholar] [CrossRef] [Scilit]
- Ijaz, N.; Ye, W.; Wang, Q.; Chen, Y.; Rehman, Z.U.; Ijaz, Z.; Khalid, U. A hydraulic binder for compacted clay under wet-dry cycles: Low carbon limestone calcined clay cement. J. Rock Mech. Geotech. Eng. 2025, 17, 5970–5988. [Google Scholar] [CrossRef] [Scilit]
- Ijaz, N.; Rehman, Z.U.; Ijaz, Z. Recycling of paper/wood industry waste for hydromechanical stability of expansive soils: A novel approach. J. Clean. Prod. 2022, 348, 131345. [Google Scholar] [CrossRef] [Scilit]
- Skempton, A.W.; Brogan, J.M. Experiments on piping in sandy gravels. Géotechnique 1994, 44, 449–460. [Google Scholar] [CrossRef] [Scilit]
- Chapuis, R.P. Similarity of internal stability criteria for granular soils. Can. Geotech. J. 1992, 29, 711–713. [Google Scholar] [CrossRef] [Scilit]
- Moffat, R.A.; Fannin, R.J. A large permeameter for study of internal stability in cohesionless soils. Geotech. Test. J. 2006, 29, 273–279. [Google Scholar] [CrossRef] [Scilit]
- Kokusho, T.; Fujikura, Y. Effect of particle gradation on seepage failure in granular soils. In Proceedings of the Fourth International Conference on Scour and Erosion, Tokyo, Japan, 5–7 November 2008. [Google Scholar]
- Ojha, C.S.P.; Singh, V.P.; Adrian, D.D. Determination of critical head in soil piping. J. Hydraul. Eng. 2003, 129, 511–518. [Google Scholar] [CrossRef] [Scilit]
- Richards, K.S.; Reddy, K.R. Experimental investigation of initiation of backward erosion piping in soils. Géotechnique 2012, 62, 933–942. [Google Scholar] [CrossRef] [Scilit]
- Ke, L.; Takahashi, A. Strength reduction of cohesionless soil due to internal erosion induced by one-dimensional upward seepage flow. Soils Found. 2012, 52, 698–711. [Google Scholar] [CrossRef] [Scilit]
- Koltuk, S.; Azzam, R. Use of quicksand condition to assess the base stabilities of sheeted excavation pits against seepage failure in cohesionless soils. Arab. J. Sci. Eng. 2019, 44, 8515–8526. [Google Scholar] [CrossRef] [Scilit]
- USBR; USACE. Internal Erosion Risks; Best Practices in Dam and Levee Safety Risk Analysis Presentation Series; U.S. Department of Interior, Bureau of Reclamation: Denver, CO, USA, 2012.
- Dam Design Report—Final “Tender No. (100/2006) Study, Design and Preparation of Tender Documents for the Construction of Dam/Tafileh Governorate and Dlagha Dam/Ma’an Governorate”; Engicon: Amman, Jordan, 2008.
- Fell, R.; Fry, J. Internal Erosion of Dams and their Foundations; Taylor & Francis: Abingdon, UK, 2007. [Google Scholar]
- Sherard, J.L. Hydraulic fracturing in embankment dams. J. Geotech. Eng. 1986, 112, 905–927. [Google Scholar] [CrossRef] [Scilit]
- Von Terzaghi, K. Theoretical Soil Mechanics; Chapman & Hall: Oxfordshire, UK, 1948. [Google Scholar]
- Sherard, J.L.; Dunnigan, L.P. Critical filters for impervious soils. J. Geotech. Eng. 1989, 115, 927–947. [Google Scholar] [CrossRef] [Scilit]
- Sherard, J.L.; Dunnigan, L.P.; Talbot, J.R. Basic properties of sand and gravel filters. J. Geotech. Eng. 1984, 110, 684–700. [Google Scholar] [CrossRef] [Scilit]
- Terzaghi, K.; Peck, R.B.; Mesri, G. Soil Mechanics in Engineering Practice; John Wiley & Sons: Hoboken, NJ, USA, 1996. [Google Scholar]
- Dam Conditions of Contract, Specifications and Bills of Quantity “Tender No. (100/2006) Study, Design and Preparation of Tender Documents for the Construction of Dam/Tafileh Governorate and Dlagha Dam/Ma’an Governorate”; Engicon: Amman, Jordan, 2008.
- United States, Bureau of Reclamation. Design of Small Dams; US Department of the Interior, Bureau of Reclamation: Washington, DC, USA, 1987.
- Quiñones-Rozo, C. Lugeon test interpretation, revisited. In Collaborative Management of Integrated Watersheds, Proceedings of the 30th Annual United States Society on Dams Conference, Sacramento, CA, USA, 12–16 April 2010; USSD: Denver, CO, USA, 2010; pp. 405–414. [Google Scholar]
- Hough, B.K. Basic Soil Engineerin; Ronald Press Company: New York, NY, USA, 1957. [Google Scholar]
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content. |