Abstract
Drainage infrastructure can enable urban expansion, which may later increase flood risk. This study assessed whether the drainage capacity of the Valley of Mexico kept pace with urban stormwater from 1910 to 2020 in a preventive (planned ahead) or a responsive (already overloaded) manner. Runoff was simulated with the TELEMAC-2D hydrodynamic model for six urban extents. Curve Numbers were adjusted for land-cover change, and the storm was based on the mean annual maximum daily precipitation. The urban area grew from 13.70 to 2265.02 km2, and the simulated runoff peak rose from 316.23 to 537.05 m3/s (+69.83%). Adding sewage (residuals from water imported or pumped for supply; 50 m3/s in 2020), the simulated peak-flow demand reached 587.05 m3/s. The official nominal drainage capacity, including the “Túnel Emisor Oriente” (TEO), was 395 m3/s, leaving a capacity gap of 192.05 m3/s. Drainage was preventive before 1910 and in 1975, when the “Túnel Emisor Central” (TEC) was installed, and responsive in 1955, 1932–1964 and 1980–2010, when the drainage capacity was overloaded. The TEO, although planned to add redundancy, entered operation when the demand had long exceeded capacity, which is consistent with the safe development paradox. These results suggest that planning should therefore control impervious area, consider storage, and consider green infrastructure and conveyance burden on vulnerable cities downstream of the Tula River.