Abstract

Production replacement in mature high-water-cut oilfields requires decisions about how long existing units can continue operating and when replacement stages should enter production. This study examined these decisions in the Xingbei Development Area of the Daqing Oilfield. Economic screening used a 120-month forecast of water cut and oil production for X7 Central 3. Annual waterflood and tertiary oil production forecasts were used to compare four development scenarios for 30 candidate blocks over 2026–2066. The baseline economic water-cut limit was 98.0151%, and cumulative operating contribution reached its maximum at month 120, the last month evaluated. A simultaneous 20% decrease in effective net oil revenue and 20% increase in produced-liquid cost moved this maximum to month 68. The staged upward-transfer scenario (S3) had the highest cumulative total oil production and the smallest mean absolute annual production change. The technology-maturity-guided scenario (S4) produced 3.07% more oil per year on average than S3 during 2051–2066 and had the highest production in 2066. An alternative harmonic decline reference reversed the cumulative shortfall ranking of S3 and S4. These results support selecting a development sequence according to the production objective, assessment period, and benchmark.

1. Introduction

Against the backdrop of the global transition toward a low-carbon energy system, the petroleum industry faces the dual challenge of maintaining reliable energy supplies while improving resource utilization and reducing the environmental burden of hydrocarbon production [1,2,3]. For mature oilfields that have undergone prolonged development, sustaining economically viable production increasingly depends on the effective mobilization of remaining recoverable reserves, the adjustment of existing development systems, and the coordinated deployment of subsequent recovery technologies. These requirements are particularly pronounced in high water-cut reservoirs, where declining oil production, increasing water handling requirements, and progressively deteriorating operating economics constrain the effectiveness of conventional development strategies [4,5,6].
Prolonged waterflooding in heterogeneous reservoirs commonly induces preferential water flow along high-permeability pathways, uneven displacement-front advancement, and pronounced differences in remaining oil distribution among reservoir intervals [7,8]. Considerable recoverable oil may remain in poorly swept zones, low-permeability intervals, and regions affected by inefficient injection-production configurations. To improve recovery performance, enhanced oil recovery (EOR) technologies have been extensively developed and applied to mature reservoirs. Polymer flooding improves the oil–water mobility ratio and volumetric sweep efficiency, while surfactant–polymer (SP) and alkaline–surfactant–polymer (ASP) flooding enhance microscopic displacement efficiency through interfacial-tension reduction, emulsification, and improved mobility control [9,10,11]. Well-pattern adjustment, layer-system subdivision, profile modification, and coordinated injection-production management further improve the utilization of remaining oil resources. These technologies provide important technical support for extending reservoir development and maintaining oil production under high water-cut conditions [12,13,14].
Current development strategies for mature high water-cut oilfields involve chemical enhanced oil recovery (EOR), well-pattern reconfiguration, zonal production adjustment, injection-production optimization, and integrated production-system management. Advances in polymer flooding and alkaline–surfactant–polymer (ASP) flooding have improved mobility control and oil displacement efficiency, while reservoir characterization and dynamic surveillance have facilitated the identification and exploitation of remaining oil [15,16,17,18]. Production decline analysis, technical–economic evaluation, and reservoir simulation are increasingly employed to support development-plan adjustment and production forecasting. Nevertheless, prolonged development progressively intensifies reservoir heterogeneity, high-permeability water channeling, and ineffective water circulation, resulting in declining oil productivity and increasing fluid-handling costs. Differences in remaining recoverable reserves, reservoir development potential, economic operating limits, and engineering implementation conditions further complicate the adjustment of multiple production blocks. The determination of economically viable production boundaries, appropriate replacement timing, and coordinated development sequences has consequently become a critical engineering requirement for maintaining long-term oil production in mature high water-cut oilfields [19,20].
To improve the long-term production efficiency of mature high water-cut oilfields, Yang and Cao [21] proposed a comprehensive management approach for chemical flooding in mature high water-cut oilfields, integrating recovery-process transition timing, specialized technologies, and coordinated engineering implementation. Yu et al. [22] developed an integrated reservoir–wellbore–surface simulation framework incorporating historical matching, system diagnostics, production optimization, and dynamic forecasting. Tao et al. [23] combined physical experiments and numerical simulation to investigate composite surfactant–polymer (SP) flooding and streamline redistribution, identifying suitable infill-well locations and activation timing in strongly heterogeneous reservoirs. Chakraborty et al. [24] performed 250 reservoir-simulation sensitivity runs to evaluate the effects of ASP formulation, injection rate, and injection duration on oil recovery performance. Although these studies have addressed recovery-process transition, integrated reservoir–wellbore–surface system optimization, well-pattern adjustment, and chemical-flooding parameter optimization, they have not evaluated the combined implications of producing-unit economic operating limits and alternative replacement-block commissioning sequences for long-term field-scale oil production.
To address these challenges, this study evaluates production replacement in the Xingbei Development Area by combining production-unit-level economic operating-limit assessment with field-scale evaluation of alternative block-development sequences. Historical annual oil-production records are analyzed to characterize field-wide production behavior, while reservoir properties, reported recovery factors, and projected recoverable oil quantities for individual targets are used to characterize the development potential of the 30 candidate blocks. For the X7 Central 3 block, the project-reported 120-month forecast response, comprising paired monthly water-cut and oil-production data, is evaluated using the specified oil-revenue and produced-liquid-cost parameters to determine the unit-specific economic water-cut limit and contribution-based operating endpoint. Arps decline-curve analysis [25] is used to compare five decline configurations with historical annual oil production over 2013–2024, whereas the supplied common Arps reference trajectory is used as the benchmark for evaluating the four development scenarios over 2026–2066. The four scenarios—Sequential development, High-potential-first development, Mixed-potential development (staged upward transfer), and Mixed-potential development (technology-maturity-guided)—are defined by the block priorities, target-layer succession, and engineering implementation conditions specified for the 30 candidate blocks. For each scenario, annual waterflood oil production and tertiary oil production (EOR) are accounted for separately and summed to obtain annual total oil production. Scenario performance is evaluated using cumulative total and EOR oil production, mean absolute annual production change, cumulative production shortfall relative to the common Arps reference, and terminal-year total and EOR oil production.
This study contributes a field-specific framework for evaluating production replacement in a mature high-water-cut oilfield. At the production-unit scale, operating-contribution screening identifies how changes in oil revenue and produced-liquid cost affect the operating window of X7 Central 3. At the field scale, four prescribed development scenarios are evaluated using annual waterflood and tertiary oil production forecasts for 30 candidate blocks. The comparison separates the two production components and tests whether the choice of decline reference affects the ranking of cumulative shortfalls. Together, these analyses characterize the operating window for continued production and the trade-offs among cumulative output, year-to-year variation, and late-period supply.

2. Field Data and Integrated Technical–Economic Evaluation

2.1. Development History and Stratigraphic Replacement Targets

The Xingbei Development Area of the Daqing Oilfield has undergone prolonged waterflooding, polymer flooding, and alkaline–surfactant–polymer (ASP) flooding. The 30 candidate blocks form the planning subset retained from the broader project inventory on the basis of target-interval eligibility and inclusion in the development schedules.
Historical annual oil production and well-pattern contributions are presented in Figure 1. Annual oil production increased from 4.40 × 104 t in 1966 to a peak of 844.42 × 104 t in 1993 and decreased to 298.59 × 104 t in 2024, a reduction of 64.64% from the peak. Production from polymer-ASP well patterns provided partial compensation for declining waterflood well-pattern production.
Figure 1. Historical annual oil production and production contributions from waterflood and polymer/ASP flood patterns in the Xingbei Development Area.
The contributions from the two development systems changed markedly during 2001–2004. Annual waterflood-pattern oil production decreased from 658.90 × 104 t to 440.47 × 104 t, a reduction of 218.43 × 104 t. Over the same period, annual production from polymer/ASP flood patterns increased from 16.14 × 104 t to 132.58 × 104 t, an increase of 116.44 × 104 t. This increase partly compensated for the decline in waterflood-pattern production, with total annual output decreasing from 675.04 × 104 t to 573.05 × 104 t, a reduction of 101.99 × 104 t. The subsequent development-sequencing assessment therefore considers the magnitude and timing of contributions from the different production sources.
Four replacement options are represented in the candidate-block schedules: post-polymer-flooding enhanced oil recovery (EOR), upward transfer to layers 1–2 of Putaohua 1 (Pu I1-2), Saertu 3 (Sa III) capacity development, and Saertu 2 (Sa II) capacity development. Post-polymer-flooding EOR concerns further recovery from existing polymer-flooded intervals; the remaining options concern transitions to subsequent stratigraphic targets and the establishment of replacement production capacity. Production start-up is recorded as an additional schedule state. Table 1 defines the stage codes and their corresponding targets.
Table 1. Development stages and stratigraphic targets used in the candidate-block schedules.
The 30 candidate blocks are the development units specified in the four scenario schedules and constitute the candidate set evaluated in this study. Their development stages are defined by the block-specific schedules, while their field-scale production performance is evaluated using the corresponding annual waterflood and EOR production forecasts.
Across the target intervals associated with the 30 candidate blocks, permeability ranges from 75.9 to 575 mD, net thickness from 2.17 to 10.50 m, and reported recovery factors from 39.50% to 69.97%, with REI values ranging from 0.361 to 0.719. Projected recoverable oil quantities for individual Saertu targets range from 13.87 to 153.56 × 104 t, while predicted peak annual oil production for six representative development-stage profiles ranges from 5.88 to 28.20 × 104 t yr−1.
Block identifiers link each development unit to its applicable stages and scheduled development periods. These definitions provide the block and stratigraphic references for the development-sequence comparison and field-scale accounting of annual waterflood and EOR production.

2.2. Data Basis and Production Accounting

Historical production and well-pattern information were extracted from publicly available PetroChina Daqing Oilfield well-history DBF datasets, including oil-well and water-well records, using the corresponding query statements. Annual production records through 2024 represent measured field-production data, whereas the 2026–2066 scenario production trajectories are forecasts based on historical production records and the specified development schedules. The 120-pair relative-month series represents the project-reported forecast response for X7 Central 3, a block designated for post-polymer-flooding enhanced oil recovery (EOR), and is used for unit-level economic assessment. The production datasets and scenario inputs for the Xingbei Development Area are summarized in Table 2.
Table 2. Production datasets and development-scenario inputs for the Xingbei Development Area.
The historical field-production series and the recent waterflood/EOR component series are retained as separate datasets because they originate from different sources and follow different accounting bases. The decline-rate series is retained with its corresponding categories and reporting period. Relative-month indices describe the paired water-cut and oil-production responses, whereas calendar years define the historical production series and development schedules. The paired monthly response represents the project-reported forecast response for the X7 Central 3 block. This case is treated separately from the field-wide historical production records and the annual production forecasts for the 30 candidate blocks.
Oil production is expressed as the mass produced within the specified reporting period. Annual and monthly quantities are reported in 104 t, with the temporal basis identified for each dataset. Water cut and decline rates are expressed as percentages; water cut is converted to a dimensionless fraction when required by the operating-limit equations. EOR oil production denotes the quantity assigned to the EOR production category. Quantifying incremental oil production requires an explicitly defined comparison scenario and a consistent evaluation period.
For each development scenario, annual total oil production is calculated as the sum of waterflood and EOR oil production in the same calendar year. The accounting relation shown in Figure 2 is Q s , y   =   Q s , y WF     +   Q s , y EOR , where Qs,y denotes total annual oil production expressed in 104 t. The superscripts WF and EOR denote waterflood and enhanced oil recovery, respectively. The subscript s ∈ {1,2,3,4} identifies development scenarios S1–S4, and y denotes the calendar year within the 2026–2066 evaluation period. Cumulative production is obtained by summing the annual quantities over the selected evaluation period. All four scenarios share the same 2026–2066 evaluation horizon and Arps reference trajectory. Waterflood and EOR contributions are retained separately to identify the sources of differences in total production.
Figure 2. Technical–economic evaluation and development-sequencing workflow for the Xingbei Development Area.
The common 2026 waterflood baseline of 182.924 × 104 t was obtained by applying the recorded 2.7% decline factor to the source value of 188.0 × 104 t. The same annual decline factor was applied to the subsequent baseline years. Scenario-specific waterflood forecasts combined direct planning entries with recorded decline factors applied to the preceding year’s scenario value.
Figure 2 summarizes the overall workflow of the assessment. After the Xingbei field data and assessment inputs are organized by production category, time basis, and unit, three analytical branches are carried out in parallel. The first branch analyzes historical production contributions and decline behavior and provides a common Arps reference for the 2026–2066 evaluation period. The second branch assesses the production response of the evaluated unit together with the economic inputs to determine the economic operating limits and the associated transition-timing conditions. The third branch constructs and evaluates four alternative development scenarios for the candidate blocks on the basis of block priority, stage order, and implementation feasibility. These results are then integrated through annual production accounting and multi-criterion production evaluation to identify the production-replacement trade-offs among the alternative development sequences.
The monthly economic screening informs the assessment of transition feasibility for X7 Central 3, while the scheduled annual forecasts provide the basis for comparing field production.

2.3. Production-Response Representation and Reference Decline

The monthly production response and annual decline series serve complementary roles in the integrated assessment. The relative-month series characterizes the joint evolution of water cut and oil production for economic-limit assessment. The annual series supports historical decline-curve comparison and provides a common reference for evaluating development-scenario production trajectories.

2.3.1. Relative-Month Production Response

To characterize the production response over successive monthly intervals, the paired series is indexed by m = 1,…,120, where m = 1 denotes the first populated interval. The unpopulated month-zero entry is excluded. Water cut is expressed as the volumetric proportion of water in the produced liquids:
f w , m = V w , m V o , m + V w , m
where fw,m is the dimensionless water cut, and Vw,m and Vo,m are the produced water and oil volumes, respectively, expressed on the same volumetric measurement basis. Reported water-cut percentages are divided by 100 for numerical calculations.
The monthly response is represented by the pair (fw,m,Mm), where Mm denotes monthly oil production in 104 t. This notation preserves the distinction between monthly production quantities and the annual quantities already defined. Fluid densities provide the conversion between the volumetric water-cut basis and the oil-mass basis required for economic assessment.
To describe response timing, the maximum monthly oil quantity and minimum water cut are identified directly from the tabulated pairs, together with their corresponding month indices. Their joint evolution characterizes the production response throughout the available interval. Operating cash-flow criteria subsequently relate these production conditions to economic boundaries and transition timing. All 120 paired values are retained in the response plots. Connecting lines provide visual continuity between successive records, and numerical descriptors are calculated from the original monthly values. A response-start date is required to align the relative-month series with calendar-based development schedules.

2.3.2. Reference Decline and Assessment Protocol

The exponential, hyperbolic, and harmonic Arps functions provide the decline shapes used to describe the annual production curves. For annual-quantity comparison, the dimensionless decline function is written as
g j ( τ ) = exp ( − D 0 , j τ ) , n j = 0 , ( 1 + n j D 0 , j τ ) − 1 / n j , 0 < n j < 1 , ( 1 + D 0 , j τ ) − 1 , n j = 1
where gj(τ) is the dimensionless decline function for configuration j, D0,j is the initial nominal decline parameter expressed in year−1, nj is the dimensionless decline exponent, and τ is elapsed time expressed in years. The exponent nj corresponds to the symbol n used in the curve legends.
The annual oil-production quantity associated with each configuration is
Q y ( j ) = Q 0 , j g j y − 2013
where Q y ( j ) is the curve-based annual oil-production quantity in year y, and Q0,j is the initial annual quantity for that configuration, both expressed in 104 t. The historical comparison comprises exponential decline, harmonic decline, and three hyperbolic configurations with n = 0.45, 0.55 and 0.65.
The historical comparison used 12 annual oil production observations from 2013 to 2024, with elapsed time measured from 2013. Preliminary fits to the historical field production data indicated that the preferred hyperbolic exponent varied between approximately 0.4 and 0.7. Three fixed values, n = 0.45, 0.55, and 0.65, were therefore selected to sample the lower, central, and upper portions of this range. For each fixed exponent, ordinary least squares was applied to Q y hist − n as a function of elapsed time. If a and b denote the fitted intercept and slope, respectively, the initial annual oil production and nominal decline parameter were obtained as Q0 = a−1/n and D0 = b/(na). The parameter pairs for the exponential (n = 0) and harmonic (n = 1) configurations were retained from the project fitting records, which used log-linear and reciprocal-linear formulations, respectively. The corresponding curves were generated by substituting these parameter pairs into Equations (2) and (3) and evaluating the curves at one-year intervals. The three hyperbolic configurations used the parameter estimates obtained from the fixed-exponent regressions described above. All five configurations were evaluated against the same observations on the original annual oil production scale using the error measures defined in Equation (4). The reported errors thus describe the historical agreement of the five configurations obtained using their respective estimation procedures.
For each configuration, the historical residual is defined as e j , y   =   Q y ( j )   −   Q y hist , where Q y hist denotes the historical annual oil-production quantity. Historical agreement is quantified using four error measures:
RMSE j = 1 N h ∑ y ∈ Y h e j , y 2 MAE j = 1 N h ∑ y ∈ Y h | e j , y | MAPE j = 100 N h ∑ y ∈ Y h e j , y Q y hist RMSPE j = 100 1 N h ∑ y ∈ Y h e j , y Q y hist 2
where Yh = {2013,…,2024} and Nh = 12. Root Mean Squared Error (RMSE) and Mean Absolute Error (MAE) are expressed in 104 t, while Mean Absolute Percentage Error (MAPE) and Root Mean Square Percentage Error (RMSPE) are expressed as percentages. Positive residuals indicate curve values above the historical observations, and negative residuals indicate values below them. Annual contributions to total squared error are calculated by dividing each squared residual by the sum of squared residuals.
The four scenarios were evaluated against the same annual planning reference, Q y ref , over 2026–2066. The adopted value for 2026 was 281.663 × 104 t. From 2027 onward, the reported values are reproduced by a hyperbolic decline curve with n = 0.55, an initial nominal decline parameter of 0.025075a−1, and a curve scale of 283.663 × 104 t at the 2026 time origin. Annual production shortfalls were calculated against the adopted reference values for the corresponding calendar years.

2.4. Economic Operating Limits and Feasible Transition Timing

Monthly operating contribution and the corresponding water-cut boundary are used to screen continued production. Engineering preparation, stage precedence, and commissioning requirements define the transition conditions.

2.4.1. Operating Cash Flow and Economic Limits

The assessment adopts a common production-unit boundary for reported oil production, associated water production, and produced-liquid expenditure. A mass-based cost coefficient represents the aggregate throughput-dependent allowance used in the screening calculation. Produced-water mass is obtained from the volumetric water cut and the oil-to-water density conversion. The monthly operating contribution is therefore expressed as
B m = 1 0 4 M m p m − c l mass 1 + ρ w f w , m ρ o ( 1 − f w , m )
where Bm is the monthly operating contribution after the specified produced-liquid cost allowance, expressed in CNY; pm is the effective net oil revenue, expressed in CNY t−1 of oil; c l mass is the composite produced-liquid cost coefficient, expressed in CNY t−1 of produced liquid; and ρo and ρw are the oil and water densities adopted for mass-volume conversion, respectively, expressed in t m−3.
The factor 104 converts the reported monthly oil quantity to tonnes. The density ratio reconciles the volumetric water-cut measurement with the mass-based expenditure coefficient.
The reference oil revenue is calculated based on PetroChina’s average realized crude oil price for the first half of 2026, the exchange rate on 15 October 2026, and an assumed net-revenue retention factor of 0.90. Conversion from barrels to oil mass uses 1 bbl = 0.158987 m3 and the adopted oil density. The resulting revenue is rounded to 3420 CNY t−1. Prices and cost coefficients are held constant over the 120-month response period to provide a common comparison basis. The numerical inputs and their provenance are summarized in Table 3.
Table 3. Reference parameters for operating contribution assessment.
The composite produced-liquid cost coefficient of 58.00 CNY t−1 was adopted from a published Daqing analogue as a representative throughput-dependent cost allowance. The net-revenue retention factor of 0.90 accounts for aggregate sales deductions and production-related charges, preventing the benchmark crude price from being treated as fully realizable net revenue.
For Mm > 0, setting Bm = 0 in Equation (5) and cancelling 104 Mm gives the following relation after multiplying by ρ o 1   −   f w , m var .
ρ o ( p m − c l mass ) ( 1 − f w , m var ) = ρ w c l mass f w , m var
To determine the economic water-cut limit, the expression is solved for f w , m var :
f w , m var = ρ o ( p m −   c l mass ) ρ o ( p m −   c l mass )   +   ρ w c l mass
where the superscript var identifies the break-even boundary under the specified throughput-dependent cost allowance.
For positive oil production and p m   >   c l mass , the operating contribution is nonnegative when the observed water cut is at or below this boundary. Monthly oil production determines the magnitude of the contribution, while water cut and the revenue-cost relationship determine its sign.
Sensitivity is assessed by varying effective net oil revenue and the produced-liquid cost coefficient individually to 80% and 120% of their reference values, together with combined cases involving a 20% revenue reduction and 20% cost increase or a 20% revenue increase and 20% cost reduction. All other parameters are held constant. The economic water-cut limit represents a production-unit-level screening boundary based on oil revenue and throughput-dependent produced-liquid costs, rather than a comprehensive project-level economic limit. Fixed operating charges, stage-specific injection and chemical costs, capital expenditures, and other project-specific expenses are not included in the calculation.

2.4.2. Operating Endpoint and Transition Timing

Cumulative operating contribution is obtained by summing the monthly operating contributions over each candidate operating duration. A contribution-based endpoint is identified as the earliest month attaining the maximum cumulative operating contribution over the available response. The candidate operating durations include zero months, for which the cumulative contribution is zero. This treatment accommodates temporary negative contributions followed by sufficient recovery. A maximum at month 120 indicates that the endpoint remains constrained by the available response horizon.
For independently prepared replacement blocks, preparation begins sufficiently early to allow the required engineering lead time before commissioning. Commissioning by the withdrawal date of the existing stage supports production continuity. Transfers through existing wells require a shut-in period for zonal isolation, recompletion, and start-up.
Feasible transition dates satisfy stage precedence and well, injection-system, and surface-facility readiness. The start of the X7 Central 3 response is identified by its relative-month index in the dataset used for economic screening. The commissioning and withdrawal years for the four scenarios were prescribed independently of the economic endpoints calculated for X7 Central 3.

2.5. Development Sequences and Block-to-Field Production Accounting

Four development sequences were evaluated for the 30 candidate blocks over 2026–2066. The replacement stages available to each block depended on target-interval eligibility and included post-polymer-flooding EOR, upward transfer to Pu I1-2, and capacity development in Sa III and Sa II.
Development potential was assessed using the reservoir evaluation index (REI), calculated as REI i   =   ∑ j w j z ij , where i denotes a block-target-flooding-method combination, j denotes an evaluation indicator, wj is its weight, and zij is its normalized value. Each indicator was normalized as zij = (xij − Lj)/(Uj − Lj) for increasing indicators and zij = (Uj − xij)/(Uj − Lj) for decreasing indicators. Here, Lj and Uj are the reference bounds adopted in the project evaluation. The decreasing transformation was applied to injector-producer spacing in both reservoir classes and to the coefficient of variation of permeability in Class I. The increasing transformation was applied to the other indicators. The weights varied by reservoir class and flooding method, as listed in Table 4 and Table 5, and summed to one for each configuration.
Table 4. REI indicator weights for Class I reservoirs.
Table 5. REI indicator weights for Class III reservoirs.
For the Saertu targets, potential was classified as high (REI ≥ 0.60), intermediate (0.50 ≤ REI < 0.60), or low (REI < 0.50). Applying these cutoffs to the reported REI scores for the 80 target records yielded 19 high-, 45 intermediate-, and 16 low-potential records under polymer flooding. The corresponding counts under ASP flooding were 25, 44, and 11. Table 6 summarizes how the four development sequences use potential rankings and stage-order constraints to prioritize eligible blocks.
Table 6. Development-sequence rules for the candidate blocks.
The REI priorities and stage-order rules in Table 6 were applied within the project’s annual and five-year production plans to assign commissioning years. Engineering readiness was assessed qualitatively in terms of feasible zonal isolation and recompletion, availability of injection-production systems, and surface fluid-handling capacity. Under S4, earlier development of Sa II assumed effective zonal isolation and feasible subsequent re-entry into deeper target intervals.
At the block-stage scale, production is associated with the recorded target interval, development stage, and active production years. The stage inventory distinguishes production already under way at the beginning of 2026 from subsequent replacement stages. These records describe target succession and the overlap of producing stages within each development sequence. The first forecast value of a new stage was assigned to its scheduled commissioning year, and subsequent values followed the stage profile over its active years. A stage scheduled to end within the evaluation period contributed through its final active year, with withdrawal taking effect in the following year. Active tertiary-stage contributions were summed by calendar year. Conversion downtime was not parameterized as a separate duration or additional production-loss deduction in this annual accounting.
Annual oil production for each chemical-flooding stage was represented by the peak-normalized power-exponential model q(t) = qp(t/tp)bexp[b(1 − t/tp)], where t is the time after stage entry (yr), tp is the time to peak production (yr), q(t) and qp are the annual and peak annual oil-production quantities, respectively (104 t yr−1), and b is dimensionless. The parameters were calculated in Microsoft Excel from peak timing, peak output, and cumulative production, using permeability, net thickness, pre-stage water cut, polymer dosage, injection rate, and, for ASP cases, surfactant dosage and well-pattern density. The resulting project-derived profiles were used as the annual stage inputs in the scenario accounting.
Field-scale evaluation uses the annual waterflood and EOR forecasts for each sequence. Total field oil production is obtained by summing the two components for the same calendar year. Each sequence retains its corresponding waterflood and EOR trajectories throughout the comparison.
Production differences between sequences are resolved into waterflood and EOR components by comparing the respective annual quantities in matching calendar years. The same partition is retained over a common comparison period, identifying the contribution of each recovery category to the difference in total field production.

2.6. Performance Metrics and Scenario Comparison

The four development sequences are evaluated over 2026–2066 using cumulative oil production, interannual production variation, production shortfall relative to the decline reference, and terminal-year production. Cumulative total and EOR oil production are calculated as
N s = ∑ y = 2026 2066 Q s , y ,   N s EOR = ∑ y = 2026 2066 Q s , y EOR
where Ns and N s EOR are cumulative total and EOR oil production, respectively, expressed in 104 t. Cumulative waterflood oil production is calculated using the same component-wise summation. Running cumulative production is obtained by summing from 2026 through each comparison year.
Interannual production variation is quantified by
A s = 1 40 ∑ y = 2027 2066 Q s , y − Q s , y − 1
where As is the mean absolute annual production change, expressed in 104 t, calculated from the 40 adjacent-year differences. Signed annual production changes are calculated by subtracting the preceding-year total from the current-year total.
Cumulative production shortfall relative to the common decline reference is calculated as
G s = ∑ y = 2026 2066 max Q y ref − Q s , y , 0
where Gs is cumulative production shortfall, expressed in 104 t. Annual production above the reference contributes zero to this measure. Terminal-year total and EOR production are represented by Qs,2066 and Q s , 2066 EOR , respectively.
Period dependence is examined over 2026–2040, 2041–2050, and 2051–2066. Each period is characterized by mean annual total production, mean annual EOR production, mean absolute annual production change, mean annual production shortfall, and total production in its final year. Production and shortfall means use the number of years in the respective period, and annual variation uses only adjacent-year pairs within that period.
Higher production quantities are preferred for cumulative, mean annual, and terminal production; lower values are preferred for annual variation and reference shortfall. Scenario rankings are reported separately for each criterion and assessment period.

3. Operating Limits and Development-Sequencing Performance

3.1. Historical Production Contributions and Decline Characteristics

The recent production history of the Xingbei Development Area shows an overall decline interrupted by periods of growth in tertiary recovery. Figure 3 compares the annual oil production of waterflood and tertiary recovery and their decline rates. During 2011–2024, the annual oil production of waterflood decreased from 267.5 × 104 t to 188.0 × 104 t, a reduction of 29.72%. Waterflood accounted for 79.42% of the reduction in annual total oil production, identifying its declining contribution as the principal influence on the overall downward trend.
Figure 3. Historical production contributions and annual decline rates in the Xingbei Development Area, 2011–2024. (a) Annual waterflood and EOR oil production. (b) Annual waterflood, total and EOR production-decline rates. Negative decline rates denote production growth.
During 2011–2014, the annual oil production of tertiary recovery increased by 22.1 × 104 t, offsetting a waterflood reduction of 20.7 × 104 t and maintaining annual total oil production within 403.2–406.1 × 104 t. The annual oil production of tertiary recovery reached its maximum of 158.5 × 104 t in 2015. Both components subsequently declined annually during 2016–2021, with tertiary recovery accounting for 49.19% of the combined reduction. This turning point marks the transition from production compensation to concurrent decline.
The total decline rate remained within 5.50–6.06% during 2017–2019. The tertiary recovery decline rate exceeded 8% in both 2017 and 2019, while the waterflood decline rate peaked at 7.09% in 2018. These offset peaks sustained elevated total decline across the three-year interval. Production recovered temporarily in 2022, when the total decline rate decreased to −1.40%. Decline resumed in 2023 and moderated to 0.15% in 2024, indicating near-stable production at the end of the record. The early production compensation is consistent with improved mobility control and expanded reservoir sweep during chemical flooding. As development progresses, preferential flow paths and barriers within sand bodies can restrict further contact with remaining oil. These constraints may weaken the production response of mature tertiary recovery units and reduce their capacity to compensate for continuing waterflood losses.

3.2. Reference Decline Assessment

The annual production series used for decline assessment contains local recoveries superimposed on an overall downward trend. Figure 4 compares the production record with five Arps decline curves over 2013–2024 and presents their residuals. Harmonic decline and the three hyperbolic decline curves remain closely grouped, while exponential decline gives lower late-period production estimates. The local recoveries in 2014, 2016, and 2022 introduce departures from the smooth decline trajectories.
Figure 4. Arps decline curves and historical-sample residuals. (a) Annual oil production and the five decline curves. (b) Residuals relative to the same historical observations.
All five curves underestimate production during 2014–2017, overestimate production during 2018–2021, and return to underestimation during 2022–2024. For harmonic decline, the largest negative and positive residuals reach −22.72 × 104 t in 2016 and 17.09 × 104 t in 2019, respectively. In Xingbei, layer and well-pattern adjustments can improve access to unevenly swept remaining oil. Additional production from these adjustments may sustain output above a smooth decline curve, generating negative residuals even during continuing total production decline. As chemical-flooding responses weaken, preferential water circulation may limit effective oil displacement and reduce production support, providing a plausible explanation for intervals in which production falls below the decline curves.
Table 7 reports the parameter pairs used to generate the five decline curves in Figure 4 and the corresponding values of the four historical error measures. Only point estimates are reported for the decline parameters because comparable regression diagnostics were unavailable for the retained exponential and harmonic parameter sets. Among the five configurations evaluated, the harmonic configuration yielded the lowest historical RMSE (10.87 × 104 t) and MAPE (2.61%). The lowest RMSE among the three hyperbolic configurations was 10.89 × 104 t at n = 0.65, only 0.02 × 104 t above that of the harmonic configuration. The two configurations therefore showed nearly identical historical agreement by this metric.
Table 7. Arps decline-curve parameters and historical-sample errors.
The consistent ranking of absolute and percentage errors indicates that the harmonic advantage is retained after normalization by annual production. For this curve, the residuals in 2016 and 2019 account for 57.1% of the total squared error. These larger annual departures receive greater weight in RMSE and RMSPE, explaining their separation from MAE and MAPE. The limited error differences among harmonic and hyperbolic configurations indicate similar descriptions of the smooth decline trend, with the largest remaining departures concentrated around production turning points.
Harmonic decline gave the lowest error within the 2013–2024 sample. At the field scale, changes in recovery methods, well patterns, and the timing of replacement stages can alter the production trajectory over a multi-decade horizon, limiting the predictive value of historical fit alone. To test the effect of the reference shape, we anchored the harmonic curve to the same 2026 reference value and recalculated shortfalls using the original scenario forecasts. The cumulative shortfalls for S3 and S4 were 117.00 and 107.96 × 104 t, respectively. S3 had the smaller shortfall under the adopted planning reference, whereas S4 had the smaller shortfall under the harmonic reference. Rankings based on cumulative production, year-to-year variation, and terminal production were unaffected.

3.3. Economic Operating Boundaries and Transition Timing

3.3.1. Economic Operating Boundaries

The monthly response of the assessed production unit in the Xingbei Development Area comprises production build-up followed by declining oil production and increasing water cut. Figure 5 presents the monthly water-cut and oil-production responses classified relative to the economic water-cut limit, together with the corresponding monthly and cumulative operating contributions. Water cut decreases from 96.6469% in month 1 to its minimum of 86.3234% in month 16, while monthly oil production increases from 0.5747 × 104 t to its maximum of 2.2198 × 104 t. Monthly operating contribution reaches its maximum of 65.09 × 106 CNY in the same month.
Figure 5. Monthly production response and operating-contribution screening. (a) Water cut relative to the economic water-cut limit. (b) Monthly oil production classified by the same economic water-cut limit. (c) Monthly operating contribution. (d) Cumulative operating contribution over the assessment period.
After month 16, water cut increases as monthly oil production declines, reaching 98.0066% and 0.0464 × 104 t, respectively, in month 120. The baseline economic water-cut limit is 98.0151%, so the entire water-cut response remains within the Below Economic Water-Cut Limit category. The corresponding oil-production response remains within the Pre-Limit Production Stage. The late production tail therefore continues to generate a positive operating contribution despite its low oil output. No monthly water-cut value exceeded 98.0151% during the baseline assessment period.
The declining response is consistent with increasingly water-dominated flow through established displacement pathways. Sand-body connectivity and mudstone interbeds in Xingbei constrain sweep, allowing remaining oil to persist outside effectively connected flow regions. Preferential water circulation through extensively swept zones provides a plausible explanation for the simultaneous increase in water cut and decline in oil production. The increasing water fraction raises produced-liquid expenditure per tonne of oil, progressively reducing the contribution associated with continued production. By month 120, monthly operating contribution decreases to approximately 6.80 × 103 CNY, indicating a narrow operating margin near the economic water-cut limit.

3.3.2. Transition-Timing Implications

Under baseline conditions, cumulative operating contribution continues to increase through month 120, reaching 2022.91 × 106 CNY. The contribution-based endpoint consequently remains at the assessment horizon. By month 60, 98.03% of the final cumulative contribution has already accumulated. The extended Pre-Limit Production Stage thus includes a prolonged interval of declining oil output and limited additional contribution. Continued operation during this interval can accompany replacement preparation, while its capacity to compensate for declining field production progressively weakens.
The economic classification changes under adverse revenue-cost conditions. A 20% reduction in effective net oil revenue lowers the economic water-cut limit to 97.5207%. The response changes from Below Economic Water-Cut Limit to Above Economic Water-Cut Limit between months 79 and 80, with the corresponding oil-production response entering the Post-Limit Production Stage in month 80. Cumulative operating contribution reaches its maximum in month 79. A 20% increase in produced-liquid cost lowers the limit to 97.6195%, advances entry into the Post-Limit Production Stage to month 83, and places the cumulative-contribution maximum in month 82. These earlier transitions shorten the period available for continued production with a positive operating contribution. A 20% increase in net oil revenue or a 20% reduction in produced-liquid cost retains the endpoint at month 120. A simultaneous 20% reduction in effective net oil revenue and 20% increase in produced-liquid cost lowered the economic water-cut limit to 97.0270%, and cumulative operating contribution peaked at month 68. A simultaneous 20% increase in revenue and 20% reduction in cost raised the limit to 98.6754%, with cumulative operating contribution reaching its maximum at the end of the available response, month 120.
For independently prepared replacement blocks, commissioning during the declining incumbent response can provide overlapping oil supply and reduce production losses during withdrawal. Upward transfer through existing wells introduces a shut-in interval for zonal isolation, recompletion and start-up, increasing the importance of production support from other active blocks during conversion. The earlier endpoints under adverse conditions indicate a shorter operating window for X7 Central 3. These endpoints are reported in relative months, and the commissioning and withdrawal years in Figure 6 remain unchanged across the sensitivity cases.
Figure 6. Block-stage schedules under the four development sequences.

3.4. Scenario Schedules and Production Trajectories

3.4.1. Block-Level Schedule Organization

Figure 6 compares the prescribed development schedules of the 30 candidate blocks under scenarios S1–S4 over 2026–2066. Each horizontal row represents a block, and the colors identify its successive development stages. Light grey-blue denotes production start-up; dark blue represents post-polymer-flooding EOR; orange indicates upward transfer to Putaohua 1, layers 1–2; medium blue represents Saertu 3 capacity development; and turquoise represents Saertu 2 capacity development. Each colored bar delineates the scheduled interval of the corresponding stage within the evaluation period.
The beginning of a bar identifies scheduled stage entry, while a change of color indicates the planned transition from the preceding stage to the subsequent recovery stage or target interval. Uncolored intervals indicate the planned separation between the displayed stages. Where successive stages reuse existing wells, the transition involves withdrawal of the preceding stage, temporary shut-in of the affected wells, zonal isolation, and recompletion, followed by production restart in the replacement interval. Where replacement capacity is prepared independently, engineering preparation can proceed alongside production from the incumbent stage. Staggered commissioning across blocks coordinates these transitions with continued production from other active blocks. Figure 6 presents the schedules for the 30 candidate blocks over 2026–2066. Common production start-up entries provide a shared initial scheduling basis, while subsequent stage arrangements determine the distribution of replacement activity.
Under sequential development (S1), X1-3 West 1 and X1-3 West 2 follow identical stage schedules: post-polymer-flooding EOR during 2030–2037, Sa III capacity development during 2038–2046, and Sa II capacity development during 2047–2055. For both blocks, 2037 was the last year of forecast production from post-polymer-flooding EOR, and the first annual production contribution from Sa III capacity development was assigned to its scheduled commissioning year, 2038. These matching schedules synchronize the withdrawal of the preceding stages and the entry of replacement stages in the two blocks, concentrating the corresponding conversion and commissioning activities at the same calendar boundaries.
High-potential-first development (S2) selectively advances block deployment while redistributing subsequent stage entries. Post-polymer-flooding EOR begins in X5 West 2 in 2036, ten years earlier than under S1. The schedule also contains extended intervals between candidate stages. In X6 West, Post-polymer-flooding EOR ends in 2036, whereas Sa III capacity development begins in 2057. Sustaining field production across such intervals consequently places greater importance on the continued contribution of existing production and replacement activity in other blocks.
For X1-3 West 1, Sa III capacity development begins in 2038 under S1 and in 2044 under S2 (Figure 6a,b).
Mixed-potential development (staged upward transfer), S3, separates transitions that occur simultaneously under S1. Following their common post-polymer-flooding EOR schedules, X1-3 West 1 and X1-3 West 2 enter Sa III capacity development in 2050 and 2042, respectively. Their entries into Sa II capacity development subsequently occur in 2058 and 2051. The resulting overlap places the two blocks in different development stages during the same years. Such staggering can distribute preparation and commissioning across time and provide opportunities for production from one block to support the transition of another. Its contribution to field continuity depends on the production response and duration of support supplied by the concurrently active blocks.
Mixed-potential development (technology-maturity-guided), S4, changes the target-layer order as well as the timing of deployment. Sa II capacity development is scheduled in all 30 blocks. In X6 East 1, Upward transfer to Pu I1-2 is followed by Sa II capacity development in 2034, with Sa III capacity development introduced in 2049. Post-polymer-flooding EOR is concentrated in four blocks, with the earliest entry in 2056. The comparison of S4 with the other scenarios reflects simultaneous changes in commissioning timing, target-layer order, and the coverage of Sa II development and post-polymer-flooding EOR. Its implementation depends on matching target availability with the readiness of interval isolation, well-pattern adjustment and recovery techniques.

3.4.2. Tertiary Recovery Contributions and Total-Oil Trajectories

Figure 7 compares the planning-stage forecasts of annual tertiary oil production under the four development sequences over 2026–2066.
Figure 7. Planning-stage forecasts of annual tertiary oil production under the four development sequences, 2026–2066.
The planning trajectories show more pronounced peaks and declines under S1, while S3 and S4 retain greater tertiary production support toward the end of the planning period. The timing and persistence of this support affect how much of the decline in waterflood oil production can be offset. The quantitative field-scale comparison uses the annual waterflood and tertiary forecasts presented in Figure 8.
Figure 8. Waterflood and tertiary recovery contributions to annual field oil production. (a) S1, sequential development. (b) S2, high-potential-first development. (c) S3, mixed-potential development (staged upward transfer). (d) S4, mixed-potential development (technology-maturity-guided).
The effect on field production depends on the combined changes in both production components. Figure 8 presents waterflood oil production and tertiary oil production under each development sequence, with Arps Decline Oil Production providing the common reference.
Under S2, the Sa III stage in X1-3 West 1 contributes 10.84 × 104 t to the 2047 field-wide tertiary oil production forecast of 113.26 × 104 t. Adding the waterflood oil production forecast of 91.416 × 104 t gives a total oil production forecast of 204.676 × 104 t for that year (Figure 8b).
Waterflood oil production decreases over the assessment period in all four sequences, progressively reducing its contribution to field output. Local recoveries in total production occur when increasing tertiary oil production offsets these losses. Under S1, the increase of 76.04 × 104 t in tertiary oil production between 2030 and 2031 exceeds the simultaneous waterflood reduction of 5.83 × 104 t, producing a net increase of 70.21 × 104 t in annual total oil production. The resulting production peak therefore depends on the timing and magnitude of replacement support.
The later recovery under S4 illustrates the contribution of renewed tertiary production during continuing waterflood decline. In 2054, waterflood oil production is approximately 80.0 × 104 t under both S3 and S4, while tertiary oil production reaches 78.89 × 104 t and 107.44 × 104 t, respectively. Annual total oil production under S4 consequently exceeds S3 by 28.56 × 104 t, with almost the entire difference arising from tertiary oil production. By 2066, total production under both sequences remains close to Arps Decline Oil Production, and Tertiary Oil Production accounts for 53.53% and 53.78% of the respective totals. Maintaining this contribution provides late-period production support as waterflood oil production continues to decline.
Over 2026–2066, the mean absolute annual production change is 15.532 × 104 t under S1 and 7.692 × 104 t under S2, compared with 4.889 × 104 t under S3 and 5.272 × 104 t under S4. S1 also exhibits the largest annual production decrease, at 44.966 × 104 t in 2032, of which 41.290 × 104 t originates from declining tertiary oil production. The weakening tertiary contribution therefore accounts for most of this abrupt contraction. Such concentrated reductions increase the replacement production required between adjacent years and emphasize the importance of commissioning subsequent development units before support from earlier responses deteriorates.
S1 and S2 remain below Arps Decline Oil Production throughout 2051–2066. Their cumulative production shortfalls reach 665.700 × 104 t and 547.645 × 104 t, respectively, with 74.69% and 96.98% accumulating during this late period. By 2066, their annual shortfalls remain at 46.722 × 104 t and 63.971 × 104 t. The lower annual variation under S2 consequently accompanies a prolonged decline below the reference trajectory. Its production continuity is constrained primarily by the persistence of insufficient late-period support, as declining tertiary oil production provides progressively less compensation for continuing waterflood oil production losses.
S3 and S4 record cumulative production shortfalls of 19.762 × 104 t and 23.087 × 104 t, respectively. Their maximum annual shortfalls are 3.773 × 104 t and 4.054 × 104 t, indicating that departures below the reference remain limited in magnitude across the assessment period. S3 combines the lowest mean absolute annual production change with the smallest cumulative production shortfall among the four development sequences. Both mixed-potential sequences maintain relatively small annual changes while limiting shortfall accumulation, consistent with replacement responses remaining available as earlier development units mature. This overlap provides more persistent support during the continuing decline in waterflood oil production.

3.5. Multi-Criterion Comparison of Development Sequences

The four development sequences exhibit different balances between cumulative oil production, production continuity and terminal output. Table 8 summarizes their performance over 2026–2066 using six criteria, allowing the cumulative production benefit to be evaluated alongside annual production changes, production shortfalls and the production support retained at the end of the assessment horizon.
Table 8. Production performance of the four development sequences over 2026–2066.
Both S3 and S4 achieve higher cumulative and terminal production, smaller mean absolute annual production changes and lower cumulative production shortfalls than S1 and S2. S3 delivered the highest cumulative total oil production, exceeding S4 by 60.115 × 104 t (0.74%). It also had the smallest mean absolute annual production change and the lowest cumulative shortfall against the adopted Arps reference. The first measure captures year-to-year variation, and the second measures the volume below the planning reference. Assessing whether a scenario meets an operational production target requires a separate, explicitly defined target.
S4 achieves the highest cumulative tertiary oil production, exceeding S3 by 59.050 × 104 t, or 1.62%, and retains higher terminal production in both production measures. The terminal total oil production difference is relatively small, at 0.829 × 104 t, or 0.65%. The opposite rankings of cumulative total oil production and cumulative tertiary oil production indicate that waterflood oil production also influences the aggregate benefit of a development sequence. Under the adopted forecast assumptions, S3 is the preferred option when full-period cumulative field production is the priority, while S4 is preferred when late-period supply or terminal output takes precedence.

4. Production Trade-Offs and Conditions for Field Implementation

4.1. Recovery-Mode Contributions and the Timing of Production Replacement

Production replacement in the Xingbei Development Area depends on the combined contributions of waterflood oil production and tertiary oil production. Greater production from one component can coincide with a reduction in the other, making the cumulative field benefit dependent on their joint trajectories. Table 9 decomposes the cumulative production difference between S3 and S4 to identify the contribution of each component to the net field response.
Table 9. Decomposition of cumulative oil-production differences between the S3 and S4 mixed-potential sequences.
The higher cumulative tertiary oil production under S4 offsets 49.55% of the waterflood oil production advantage under S3. The remaining balance accounts for the greater cumulative total oil production under S3, demonstrating the contribution of waterflood production to the overall sequencing benefit. Yang and Cao [21] identified chemical-flooding intervention timing as an important decision in mature high-water-cut fields, and Yu et al. [22] showed how reservoir, wellbore, and surface constraints can be evaluated jointly. The Xingbei comparison adds a field-scale planning perspective by showing how gains from tertiary recovery can be partly offset by changes in waterflood production. For implementation, the timing of replacement stages therefore needs to be assessed alongside the production that can be sustained from intervals already on stream.
With both development schedules, S4’s waterflood oil production forecast, and S3’s total oil production forecast held fixed, S4 would require an additional 60.115 × 104 t of tertiary oil production over 2026–2066 to match S3’s cumulative total oil production. This increment represents 1.624% of S4’s baseline cumulative tertiary oil production. Under the baseline forecasts, S4 already exceeds S3 in cumulative tertiary oil production by 59.050 × 104 t, equivalent to 1.62% of S3’s cumulative tertiary oil production. The 1.624% threshold is deterministic, and the probability of achieving the required increase remains unquantified.
Figure 9 shows how waterflood and tertiary contributions, year-to-year production changes, and shortfalls relative to the adopted reference evolve across the four development sequences.
Figure 9. Recovery-mode contributions and production-replacement continuity analysis.
The cumulative trajectories in Figure 9a,b reveal different temporal contributions from the two production components. By 2050, S3 has accumulated the largest waterflood oil production, while both S1 and S2 retain higher cumulative tertiary oil production than the mixed-potential sequences. During the subsequent development years, S4 overtakes S2 in cumulative tertiary oil production in 2062 and S1 in 2063. This late crossover associates the mixed-potential sequences with production support that persists after earlier responses have weakened. At the reservoir scale, interlayer differences in permeability and remaining-oil saturation can redistribute injected water and modify production following layer regrouping, providing a physical rationale for evaluating existing waterflood support alongside successive replacement responses.
The signed decomposition in Figure 9c explains the changing balance between these contributions. The cumulative total oil production difference reaches 132.687 × 104 t in 2051. The cumulative tertiary oil production difference remains positive during 2045–2052 and becomes negative from 2053 onward. The continuing positive waterflood oil production difference then combines with an opposing tertiary contribution, narrowing the cumulative field-production advantage. Consequently, the total oil production difference falls below the waterflood oil production difference during the later years. This behavior quantifies the partial compensation provided by the stronger tertiary contribution under S4.
The annual changes in Figure 9d identify how production gains and losses are distributed through time. S1 exhibits the widest variation, changing from an increase of 70.206 × 104 t in 2031 to a decrease of 44.966 × 104 t in 2032. Such closely spaced gains and losses indicate concentrated production support followed by a rapid contraction. The other sequences occupy narrower ranges of annual change, with S3 and S4 showing more moderate alternating responses. This pattern is consistent with more distributed stage entry and overlap between production growth in incoming units and decline in incumbent units. Such overlap can moderate field-level changes as individual development responses mature.
The cumulative shortfalls in Figure 9e distinguish moderate annual changes from persistent production support. Under S2, 96.98% of the full-horizon shortfall accumulates during 2051–2066, showing that a comparatively smooth trajectory can still leave a sustained production deficit. The limited shortfall accumulation under S3 and S4 indicates more persistent support relative to Arps Decline Oil Production. Figure 9f further shows that the between-sequence range in terminal tertiary oil production is 61.1006 × 104 t, compared with 3.7296 × 104 t for waterflood oil production. Terminal field-production differences therefore arise primarily from the persistence of the tertiary component. Maintaining this support depends on the readiness of replacement intervals and coordination of well conversion with ongoing production.

4.2. Engineering Applicability and Assessment-Period Dependence

The production support provided by staggered replacement depends on coordination between ongoing production and engineering preparation. For successive stages using the same wells, zonal isolation and recompletion introduce a well conversion interval, during which production continuity depends on other active blocks. Independently prepared replacement blocks allow preparation to proceed alongside incumbent production, with commissioning governed by the readiness of injection-production systems and surface facilities. Reservoir deliverability, well performance, and surface-system capacity jointly constrain the production profile that can be realized. Earlier development of Sa II under S4 requires effective zonal isolation and, where later stages target deeper intervals, the ability to re-enter those intervals. The applicability of this sequence to other mature oilfields depends on the availability of replacement intervals, the feasibility of well conversion, and sufficient capacity for injection and produced-fluid handling.
The assessment period also influences sequence preference because commissioning dates and response persistence distribute production support unevenly through time. Table 10 compares the preferred development sequences across three development periods and the full assessment period.
Table 10. Preferred development sequences under different assessment periods and performance criteria.
During 2026–2040, the mean annual total oil production under S2 exceeds S3 by 0.37%, while S3 has the smallest mean annual production shortfall. The volume advantage associated with prioritizing higher-potential blocks therefore needs to be considered alongside replacement continuity and commissioning readiness. S1 provides the highest mean annual tertiary oil production and terminal Total Oil Production during this period, further distinguishing the objectives served by the early development arrangements. During 2041–2050, S2 leads both mean production criteria and shares zero mean annual production shortfall with S3. S4 produces the smallest mean absolute annual production change, showing that smoother production delivery can accompany a lower mean production level.
Preference shifts toward S4 during 2051–2066. Its mean annual total oil production reaches 151.803 × 104 t, exceeding S3 by 3.07%, and it also provides the highest mean annual tertiary oil production and terminal total oil production. S3 retains the smallest annual production variation and production shortfall during this period, together with the highest mean annual total oil production over 2026–2066. Staged upward transfer under S3 consequently favors production delivery and continuity across the full assessment period. The stronger late-period production under S4 makes technology-maturity-guided development more favorable when sustained late-period supply and terminal production receive greater priority.
Changes in effective net oil revenue and produced-liquid cost affect the estimated operating window of X7 Central 3. The field-scale rankings depend on the adopted production forecasts, commissioning schedules, assessment period, and performance criterion. The alternative harmonic reference reverses the shortfall ranking of S3 and S4. The capability to quantify the effects of uncertainty in production forecasts and commissioning dates on scenario rankings is limited.

5. Conclusions

(1)
Operating-contribution screening for the assessed production unit gave an Economic Water-Cut Limit of 98.0151%. The baseline contribution-based endpoint was month 120, the end of the assessment window, with 98.03% of cumulative operating contribution generated by month 60. A 20% reduction in effective net oil revenue and a 20% increase in the composite produced-liquid cost coefficient shortened the endpoint to months 79 and 82, respectively.
(2)
For the 30 candidate blocks over 2026–2066, S3, mixed-potential development (staged upward transfer), yielded the highest cumulative total oil production among the four sequences, reaching 8138.376 × 104 t. It also produced the lowest mean absolute annual production change of 4.889 × 104 t and the lowest cumulative production shortfall relative to Arps Decline Oil Production of 19.762 × 104 t. Assessing operational target attainment requires a separate comparison with a specified production target. Under the adopted forecasts, S3 is favored when cumulative total oil production over the full assessment period is the primary objective. Its projected advantage over S4 is 0.74%, and the effect of forecast uncertainty on this difference remains unevaluated.
(3)
Harmonic decline had the lowest RMSE over 2013–2024, at 10.87 × 104 t, compared with 10.89 × 104 t for hyperbolic decline with n = 0.65. This small difference provides limited evidence for selecting a long-term production reference. When an alternative harmonic reference was anchored to the same 2026 value, S4 had a smaller cumulative shortfall than S3, reversing their order under the adopted planning reference.
(4)
Sequence preference varied with the assessment period. S2 provided the highest mean annual total oil production during 2026–2040 and 2041–2050. S4, Mixed-potential development (technology-maturity-guided), led during 2051–2066, with mean annual total oil production of 151.803 × 104 t, exceeding S3 by 3.07%. S4 also retained the highest total oil production in 2066, at 127.754 × 104 t. This later production advantage supports considering S4 when sustained replacement production during the later years receives priority, subject to zonal isolation, well conversion, and readiness of the injection-production and surface systems.

Supplementary Materials

The following supporting information can be downloaded at: https://www.mdpi.com/article/10.3390/pr14233827/s1, Table S1: Development status of the historical Class I chemical-flooding blocks; Table S2: Historical REI assessment and associated chemical-flooding performance; Table S3: Reservoir characteristics and REI values of post-polymer EOR targets; Table S4: Reservoir characteristics and REI values of Pu I1-2 upward-transfer targets; Table S5: Reservoir characteristics and REI values of Saertu development targets; Table S6: Oil in place and projected recoverable oil quantities by target interval; Table S7: Predicted production characteristics of six representative development stages.

Author Contributions

D.W. and Y.G.: Writing—Original Draft, Writing—Review & Editing, Data Curation, Formal Analysis, and Validation; F.M. and D.Y.: Formal Analysis, Validation, and Supervision; J.W.: Formal Analysis, Review and Editing; All authors have read and agreed to the published version of the manuscript.

Funding

This study is supported by National Natural Science Foundation of China (Project No.52604045).

Data Availability Statement

Due to confidentiality restrictions, selected data are presented in the article/Supplementary Materials. All data supporting the findings of this study are available from the corresponding author upon reasonable request.

Acknowledgments

This study is supported by the National Natural Science Foundation of China, “Synergistic EOR Technology via Confined Phase-Change and Adaptive Emulsification in Ultra-Low-Permeability Reservoirs” (52604045).

Conflicts of Interest

The authors declare no conflict of interest.

References

  1. Liang, X.; Liu, P.P.; Zhang, Y. Status and prospect of improved oil recovery technology of high water cut reservoirs. Water 2023, 15, 1342. [Google Scholar] [CrossRef] [Scilit]
  2. Yu, H.M.; Wang, Y.Q.; Zhang, L.; Zhang, Q.X.; Guo, Z.H.; Wang, B.Z.; Sun, T. Remaining oil distribution characteristics in an oil reservoir with ultra-high water-cut. Energy Geosci. 2024, 5, 100116. [Google Scholar] [CrossRef] [Scilit]
  3. Dakuang, H. On concepts, strategies and techniques to the secondary development of China’s high water-cut oilfields. Pet. Explor. Dev. 2010, 37, 583–591. [Google Scholar] [CrossRef] [Scilit]
  4. Alisheva, Z.; Nadirov, K.; Al-Dujaili, A.N.; Bimbetova, G.; Nadirova, Z.; Zhantasov, M.; Tileuberdi, N.; Dauletuly, A. Integrated Strategies for Controlling Water Cut in Mature Oil Fields in Kazakhstan. Polymers 2025, 17, 829. [Google Scholar] [CrossRef] [Scilit] [PubMed]
  5. Zhao, L.; Wang, J.C.; Fu, L.B.; Chen, L.; Jia, Z.H. Improve Oil Recovery Mechanism of Multi-Layer Cyclic Alternate Injection and Production for Mature Oilfield at Extra-High Water Cut Stage Using Visual Physical Simulation Experiment. Energies 2023, 16, 1546. [Google Scholar] [CrossRef] [Scilit]
  6. Zhou, Z.L.; Cai, M.J.; Zhang, F.L.; Yang, Y. Residual oil occurrence state and time-shift characteristics of multi-media displacement of high water-cut reservoirs. Fault-Block Oil Gas Field 2020, 27, 608–612. [Google Scholar]
  7. Madalimov, M.; Li, D., Jr.; Haynes, B.; Dair, Y.; Ehighebolo, T.; Ionescu, L. Heterogeneity modeling and heterogeneity-based upscaling for reservoir characterization and simulation. SPE J. 2025, 30, 942–956. [Google Scholar] [CrossRef] [Scilit]
  8. Zou, L.H.; Su, Y.N.; Xu, X.S.; Li, W.; Zhao, H.; Zhang, M.X.; Jiao, S.J. Study on the propagation law of hydraulic fractures in heterogeneous permeability reservoirs. PLoS ONE 2025, 20, e0328689. [Google Scholar] [CrossRef] [Scilit] [PubMed]
  9. Song, K.P.; Wang, D.G.; Zhang, F.Y.; Fu, H.; Bai, M.X.; Mebodi, H.E. A Novel Method for Enhancing Oil Recovery by Thickened Supercritical CO2 Flooding in high water-cut Mature Reservoirs. Engineering 2025, 48, 59–69. [Google Scholar] [CrossRef] [Scilit]
  10. Li, W.R.; Wei, X.; Wang, Z.B.; Liu, W.D.; Ding, B.; Dong, Z.Z.; Pan, X.; Lin, K.Z.; Yi, H.L. Numerical Investigation on Alkaline-Surfactant-Polymer Alternating CO2 Flooding. Processes 2024, 12, 916. [Google Scholar] [CrossRef] [Scilit]
  11. Li, G.Q.; Zhou, Z.H.; Fan, J.; Zhang, F.; Zhao, J.Y.; Zhang, Z.Q.; Ding, W.; Zhang, L.; Zhang, L. Study on Microscopic Oil Displacement Mechanism of Alkaline-Surfactant-Polymer Ternary Flooding. Materials 2024, 17, 4457. [Google Scholar] [CrossRef] [Scilit] [PubMed]
  12. Yadua, A.U.; Lawal, K.A.; Okoh, O.W.; Ovuru, M.D.; Eyitayo, S.I.; Saka, E.T.; Obi, M.C. Stability and stable production limit of an oil production well. J. Pet. Explor. Prod. Technol. 2020, 10, 3673–3687. [Google Scholar] [CrossRef] [Scilit]
  13. He, S.J.; Li, X.Z.; Lin, Y.Q.; Wan, Y.J.; Luo, R.L.; Qi, N.J. Evaluation of shale gas reserve recoverability and three-dimensional development potential: A case study of the Weiyuan Block, Sichuan basin. Sci. Rep. 2026, 16, 7625. [Google Scholar] [CrossRef] [Scilit] [PubMed]
  14. Zou, C.N.; Zhao, Q.; Dong, D.Z.; Yang, Z.; Qiu, Z.; Liang, F.; Wang, N.; Huang, Y.; Duan, A.X.; Zhang, Q.; et al. Geological characteristics, main challenges and future prospect of shale gas. J. Nat. Gas Geosci. 2017, 2, 273–288. [Google Scholar] [CrossRef] [Scilit]
  15. Huang, B.; Chen, H.; Huang, K.; Zhang, W.; Fu, C. Study on the coalescence characteristics of oil droplets and molecular mechanism of oil film drainage in alkali-surfactant-polymer flooding produced water. Process Saf. Environ. Prot. 2025, 203, 107772. [Google Scholar] [CrossRef] [Scilit]
  16. Clemens, T.; Mikulic, S.; Stanciu, B.; Scheurer, C.; Kienberger, G.; Vidlak, M.; Schnoller, J.; Dardalic, M.; Hincapie, R.; Tahir, M.; et al. Alkali-Polymer Flooding after Polymer Flooding: Field Test Results. SPE J. 2026, 31, 3440–3456. [Google Scholar] [CrossRef] [Scilit]
  17. Li, X.; Yu, J.N.; He, H.F.; Peng, Z.M.; Pu, J.Y.; Zheng, L.M.; Chen, A.S.; Qian, J.L.; Huang, F.F.; Gu, X.Y. A thermo-stable polymeric surfactant for enhanced heavy oil recovery via hot water chemical flooding. Langmuir 2025, 41, 29180–29195. [Google Scholar] [CrossRef] [Scilit] [PubMed]
  18. Podoprigora, D.; Rogachev, M.; Byazrov, R. Surfactant-Polymer Formulation for Chemical Flooding in Oil Reservoirs. Energies 2025, 18, 1814. [Google Scholar] [CrossRef] [Scilit]
  19. Saha, R.; Phukan, R. Enhanced oil recovery using chemical and nanoparticles for heavy oil sandstone reservoirs: Chemical vs nanofluid flooding. J. Mol. Liq. 2025, 431, 127707. [Google Scholar] [CrossRef] [Scilit]
  20. Song, F.; Tian, L.; Li, H. Research on Modifying the Development Plan to Enhanced Oil Recovery in the Middle and Late Stages of Water Flooding in Deep Clastic Rock Reservoirs. Processes 2025, 13, 177. [Google Scholar] [CrossRef] [Scilit]
  21. Yang, Y.; Cao, X.L. New comprehensive management method and engineering practice path for mature oilfields with high water cut. Pet. Geol. Recovery Effic. 2024, 31, 54–62. [Google Scholar] [CrossRef]
  22. Yu, H.M.; Wang, P.; Wang, Y.Q.; Tang, L.; Wang, J.Y.; Shu, Q.L.; Yang, S.X.; Zhu, Y.W.; Wu, Y.Y.; Li, X.J.; et al. Integrated Simulation and Optimization of Reservoir-Wellbore-Surface Systems in Ultrahigh Water Cut Oil Fields. Energy Sci. Eng. 2025, 13, 3503–3514. [Google Scholar] [CrossRef] [Scilit]
  23. Tao, L.; Wu, M.J.; Zhang, N.; Shi, W.Y.; Bai, J.J.; Xu, Z.X.; Zhu, Q.J.; Song, Y.; Cao, L.L. Investigation on EOR by composite surfactant-polymer (SP) flooding and streamline adjustment through well pattern encryption: A case study of Shengli’s strong heterogeneous reservoir. Fuel 2025, 385, 134189, Correction in Fuel 2025, 385, 134295. [Google Scholar] [CrossRef] [Scilit]
  24. Chakraborty, R.; Dutta, R.; Bajpai, P.; Kumar, S.; Kundu, G.; Yomdo, S.; Borgohain, T.; Mandal, A. Optimization of control parameters in alkaline-surfactant-polymer (ASP) flooding for enhanced oil recovery: A simulation approach. J. Pet. Explor. Prod. Technol. 2025, 15, 92. [Google Scholar] [CrossRef] [Scilit]
  25. Yang, N.; Jiang, G.P.; Sui, H.R.; Fu, B.; Wang, J.Y.; Jiang, T.T. Analysis of the Suitability of the Improved ARPS Yield Model During Extremely High Water Content Periods. J. Phys. Conf. Ser. 2026, 3290, 012194. [Google Scholar] [CrossRef] [Scilit]
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content.

Article Metrics

Citations

Article Access Statistics

Multiple requests from the same IP address are counted as one view.