Wang, J.; Li, Y.; Zhang, Z.; Wu, Z.; Wu, L.; Jia, S.; Peng, T.
Dynamic Integrated Scheduling of Production Equipment and Automated Guided Vehicles in a Flexible Job Shop Based on Deep Reinforcement Learning. Processes 2024, 12, 2423.
https://doi.org/10.3390/pr12112423
AMA Style
Wang J, Li Y, Zhang Z, Wu Z, Wu L, Jia S, Peng T.
Dynamic Integrated Scheduling of Production Equipment and Automated Guided Vehicles in a Flexible Job Shop Based on Deep Reinforcement Learning. Processes. 2024; 12(11):2423.
https://doi.org/10.3390/pr12112423
Chicago/Turabian Style
Wang, Jingrui, Yi Li, Zhongwei Zhang, Zhaoyun Wu, Lihui Wu, Shun Jia, and Tao Peng.
2024. "Dynamic Integrated Scheduling of Production Equipment and Automated Guided Vehicles in a Flexible Job Shop Based on Deep Reinforcement Learning" Processes 12, no. 11: 2423.
https://doi.org/10.3390/pr12112423
APA Style
Wang, J., Li, Y., Zhang, Z., Wu, Z., Wu, L., Jia, S., & Peng, T.
(2024). Dynamic Integrated Scheduling of Production Equipment and Automated Guided Vehicles in a Flexible Job Shop Based on Deep Reinforcement Learning. Processes, 12(11), 2423.
https://doi.org/10.3390/pr12112423