Liu, R.; Jia, Q.; Yu, H.; Gao, K.; Fu, Y.; Yin, L.
Bi-Objective Integrated Scheduling of Job Shop Problems and Material Handling Robots with Setup Time. Mathematics 2025, 13, 447.
https://doi.org/10.3390/math13030447
AMA Style
Liu R, Jia Q, Yu H, Gao K, Fu Y, Yin L.
Bi-Objective Integrated Scheduling of Job Shop Problems and Material Handling Robots with Setup Time. Mathematics. 2025; 13(3):447.
https://doi.org/10.3390/math13030447
Chicago/Turabian Style
Liu, Runze, Qi Jia, Hui Yu, Kaizhou Gao, Yaping Fu, and Li Yin.
2025. "Bi-Objective Integrated Scheduling of Job Shop Problems and Material Handling Robots with Setup Time" Mathematics 13, no. 3: 447.
https://doi.org/10.3390/math13030447
APA Style
Liu, R., Jia, Q., Yu, H., Gao, K., Fu, Y., & Yin, L.
(2025). Bi-Objective Integrated Scheduling of Job Shop Problems and Material Handling Robots with Setup Time. Mathematics, 13(3), 447.
https://doi.org/10.3390/math13030447