Next Article in Journal
Water Recovery from Floor Cleaning Operations of Industrial or Public Areas: The Results of a Field Test
Previous Article in Journal
Cousins, Siblings and Twins: A Review of the Geological Model’s Place in the Digital Mine
 
 
Font Type:
Arial Georgia Verdana
Font Size:
Aa Aa Aa
Line Spacing:
Column Width:
Background:
Erratum

Erratum: Mohr et al. Global Projection of Lead-Zinc Supply from Known Resources. Resources, 2018, 7, 17

1
Institute for Sustainable Futures, University of Technology Sydney, 235 Jones St, Ultimo, NSW 2007, Australia
2
Independent Scholar, Sitka, AK 99835, USA
3
Environmental Engineering, School of Engineering, RMIT University, Melbourne City Campus, 124 La Trobe St, Melbourne, VIC 3000, Australia
*
Author to whom correspondence should be addressed.
Resources 2020, 9(3), 25; https://doi.org/10.3390/resources9030025
Submission received: 19 December 2019 / Accepted: 19 December 2019 / Published: 6 March 2020
The authors wish to make the following correction to this paper [1]:
The authors regret that Equation (1) was incorrect. The correct equation is:
L M ( t ) = { L H + ( L L L H ) log 10 M P ( t ) M H log 10 M L M H ; i f   M L M H ( L L + L H ) 2 ; o t h e r w i s e
The authors would like to apologize for any inconvenience caused to the readers by this change. The change does not affect the scientific results. The manuscript will be updated and the original will remain online on the article’s webpage.

Reference

  1. Mohr, S.; Giurco, D.; Retamal, M.; Mason, L.; Mudd, G. Global Projection of Lead-Zinc Supply from Known Resources. Resources 2018, 7, 17. [Google Scholar] [CrossRef] [Green Version]

Share and Cite

MDPI and ACS Style

Mohr, S.; Giurco, D.; Retamal, M.; Mason, L.; Mudd, G. Erratum: Mohr et al. Global Projection of Lead-Zinc Supply from Known Resources. Resources, 2018, 7, 17. Resources 2020, 9, 25. https://doi.org/10.3390/resources9030025

AMA Style

Mohr S, Giurco D, Retamal M, Mason L, Mudd G. Erratum: Mohr et al. Global Projection of Lead-Zinc Supply from Known Resources. Resources, 2018, 7, 17. Resources. 2020; 9(3):25. https://doi.org/10.3390/resources9030025

Chicago/Turabian Style

Mohr, Steve, Damien Giurco, Monique Retamal, Leah Mason, and Gavin Mudd. 2020. "Erratum: Mohr et al. Global Projection of Lead-Zinc Supply from Known Resources. Resources, 2018, 7, 17" Resources 9, no. 3: 25. https://doi.org/10.3390/resources9030025

APA Style

Mohr, S., Giurco, D., Retamal, M., Mason, L., & Mudd, G. (2020). Erratum: Mohr et al. Global Projection of Lead-Zinc Supply from Known Resources. Resources, 2018, 7, 17. Resources, 9(3), 25. https://doi.org/10.3390/resources9030025

Note that from the first issue of 2016, this journal uses article numbers instead of page numbers. See further details here.

Article Metrics

Back to TopTop