Abstract
Traditional fixed counterweights on tower cranes fail to adapt to varying load and radius, causing unbalanced mast bending moments and compromising dynamic stability. This paper proposes a dynamic balancing method using mobile counterweights driven by real-time prediction of the tower mast bending moment. A parametric finite element model of a QTZ6010 tower crane is used to derive explicit bending moment predictors and a counterweight position–moment relationship. The analysis identifies a load–radius-dependent balance point, with the bending moment magnitude decreasing towards this point and increasing after a reversal in bending direction. Dynamic load histories obtained from a rigid–flexible coupled virtual prototype are transferred to transient finite element analysis to assess the method under hoisting, trolley luffing, and sequential hoisting–luffing operations. Predicted bending moments agree with the numerical reference values, with absolute relative errors below 1% at the sampled time points. In the simulations, counterweight adjustment based on the predicted moment reduces the residual mast bending moment to 1.24, 2.33, and 4.33 kN·m for the three operations, respectively. These results support the numerical feasibility of prediction-guided counterweight adjustment and provide a quantitative basis for developing active balancing strategies for tower cranes.
1. Introduction
In high-rise and complex construction projects, the tower crane is core equipment for the efficient vertical transportation of materials. Its stable operation is highly dependent on the overall moment balance of the machine, particularly its ability to adapt to dynamic working conditions involving frequent changes in the load and operating radius [1]. Currently, widely used fixed-counterweight tower cranes cannot adjust their balancing moment according to varying working conditions [2,3]. This can easily lead to excessive unbalanced bending moments on the tower mast, which, over long periods, may cause structural fatigue and represents a significant potential factor in overturning accidents. Therefore, conducting in-depth research on the balance mechanism of tower cranes under dynamic conditions and developing a dynamic adjustment method that effectively maintains a balanced force state on the tower mast holds theoretical and engineering significance for improving the operational safety of tower cranes and reducing the associated safety hazards.
To ensure the balance stability of tower cranes and reduce the risk of overturning, mobile counterweight technology has become an important research direction, with researchers conducting multifaceted studies in recent years. In terms of structural design, Jiang et al. [4] developed a folding-arm tower crane with synchronously moving counterweights. Qin [5] proposed a swinging balance arm scheme based on a parallelogram mechanism. Yang et al. [6] investigated the mechanical performance and optimization of tower crane support frame joints, effectively enhancing the overall load-bearing capacity and seismic safety of the support system. In terms of control, Wang et al. [7] proposed an automatic counterweight adjustment method based on sensors and fuzzy PID. Montonen et al. [8] compared extra-insensitive input shaping and swing-angle-estimation-based slew control approaches for a tower crane, effectively suppressing load oscillation during slewing operations. Price et al. [9] developed a real-time monitoring system integrating physical sensing, computer vision, and virtual modeling to address the “blind lifting” problem and improve crane operational safety. Zhang et al. [10] studied an optimization decision-making framework for tower crane layout, effectively balancing heavy-load lifting requirements with construction safety costs. Cho et al. [11] proposed a lifting path planning method based on reinforcement learning, which automatically generates automated lifting paths that are both safe and efficient, ensuring both productivity and operational safety.
Concurrently, the use of dynamic simulation is also a crucial method in tower crane research. Li et al. [12] established a rigid–flexible coupling model of a double-face tower crane and conducted dynamic simulations, providing a reference for tower crane studies. Yang et al. [13] proposed an improved dynamic model considering beam flexibility and system nonlinearity. Gu et al. [14] established a coupled model of the tower crane, including wire rope flexibility and load swing, to study the dynamic characteristics of the towering structure. Yuan et al. [15] analyzed the impact load effects under rope-break unloading conditions using finite element and dynamic simulations. Chen et al. [16] found, through coupled computational fluid dynamics and finite element simulations, that the influence of fluctuating wind loads should be considered in the safety analysis of tower cranes. Augustyn and Barski [17] numerically and analytically determined the critical wind speed causing the overturning of a top-slewing tower crane, further confirming the significant role of wind loads in overturning risk assessment. Yu et al. [18] used absolute nodal coordinate cable elements to address large deformations in wire ropes, established a multibody dynamic model of various tower crane parts, and verified the accuracy of the virtual prototype model using a flat-top tower crane as an example. Liu et al. [19] established a multi-degree-of-freedom coupled dynamic model to explore the load swing characteristics and structural vibration features of tower cranes under combined operating conditions, revealing the nonlinear dynamic laws under the synergistic action of hoisting, luffing, and slewing.
These studies have provided an important foundation for tower crane balance and dynamic analysis, offering effective pathways for investigating crane characteristics. However, the tower mast bending moment is a core parameter determining the structural safety and operational stability of a tower crane; its magnitude and variation patterns are directly related to potential safety hazards. Therefore, this paper, while fully considering the overall balance and operational stability of the tower crane, focuses on analyzing the moment balance conditions of the tower crane and the parameters influencing the tower mast bending moment, aiming to construct a prediction model for this bending moment. Based on the established tower mast bending moment prediction model, this paper integrates rigid–flexible coupling multibody dynamics and the finite element method to systematically reveal the evolution patterns of the tower mast bending moment under different working conditions and verify the accuracy of the prediction model. Subsequently, based on the bending moment variation patterns revealed by the model, an adjustment strategy for the mobile counterweight position is proposed, achieving an optimization of the tower crane’s dynamic balance. The results indicate that this method can suppress the unbalanced bending moment of the tower mast and improve the dynamic stability of the tower crane under high-load, large-span working conditions, providing a theoretical basis and a feasible technical approach for the balance control of tower cranes.
2. Finite Element Model Construction and Load Analysis of the Tower Crane
2.1. Parametric Model Construction of the QTZ6010 Tower Crane
2.1.1. Basic Components of QTZ6010
This study selects the QTZ6010 tower crane as the research object. This model is a horizontal jib, trolley luffing, top-slewing self-erecting tower crane, widely applicable to various building construction scenarios. It is primarily composed of core components such as the tower mast, tower top, jib, counter-jib, slewing mechanism, and counterweight. Its free-standing structural schematic is shown in Figure 1.
Figure 1.
Structural schematic diagram of the QTZ6010 tower crane (free-standing): 1—foundation, 2—tower mast, 3—hydraulic climbing mechanism, 4—slewing bearing, 5—slewing mechanism, 6—rotary tower section, 7—counter-jib, 8—hoisting mechanism, 9—counterweight, 10—counter-jib tie bar, 11—tower top, 12—jib tie bar, 13—jib, 14—hook, 15—operator’s cabin.
2.1.2. Parametric Model Establishment
The overall structure of the QTZ6010 is a metal truss structure, using structural steel Q345B as the main material. The material has an elastic modulus of E = 2.06 × 105 MPa, a Poisson’s ratio μ = 0.3, and a material density (ρ = 7859 kg/m3). Based on the structural characteristics of each crane component, accurate geometric and physical parameters are assigned to each element, as shown in Table 1.
Table 1.
Section size table of tower crane components.
Considering the structural characteristics and actual working conditions of the QTZ6010 tower crane comprehensively: For the main truss structures such as the tower mast, rotary tower section, jib, and counter-jib, which are subjected to various loads including bending, tension, compression, and torsion, the 3D linear beam element BEAM188, based on Timoshenko beam theory, is selected for simulation. For the jib tie bars and counter-jib tie bars, which primarily experience axial tensile and compressive stresses, the link element LINK180 is chosen for simulation. For components with relatively small geometric dimensions and concentrated mass distribution, such as the electric motor, drum, and load, the mass element MASS21 is used for simulation.
2.1.3. Boundary Conditions and Model Simplification
To further accurately simulate the actual working conditions of the tower crane and improve computational efficiency, the calculation model was simplified according to reference [20], and constraint conditions were set based on actual working conditions [21]. First, the model simplifications include the following: (a) The base is anchored to the concrete foundation via anchor bolts, possessing high stiffness, and is simplified as a fixed support. Full constraints are applied at the four support points, restricting all translational and rotational degrees of freedom (UX = UY = UZ = ROTX = ROTY = ROTZ = 0) [22,23]. (b) The slewing mechanism, being small in size with concentrated mass, is equivalently replaced using beam elements. (c) The traveling mechanism, trolley, and load, being compact in structure with concentrated mass, are uniformly simplified as mass elements. Second, the constraint conditions are set as follows: (a) Hinge constraints: the connections between the jib, counter-jib, and the rotary tower section via pins are simplified as hinge supports. Node coupling is used to release only the rotational degree of freedom about the Z-axis. (b) Fixed constraints: the ends of the jib and counter-jib are fixed to the tower top and suspension points, respectively, achieved through shared node connections to ensure effective force transfer and structural integrity.
Based on the above work, the parametric establishment of the finite element model for the QTZ6010 tower crane was finally completed, as shown in Figure 2.
Figure 2.
Finite element model of the tower crane.
2.1.4. Model Discretization and Verification
Using the element types defined in Section 2.1.2, each chord, web member, tie bar and jib segment is represented by a single element spanning its full length (1.4 m for the panels of the tower mast and jib, 1.377 m for the rotary tower section), giving 983 beam and link elements, six mass elements and about 400 nodes. The nodes therefore coincide with the joints of the actual truss, which are also the points at which the member forces are required, and the element length follows from the member layout rather than from a user-defined mesh size: subdividing a member only adds intermediate sections, at which the moment follows from the same equilibrium, so the maximum bending moment of 1489.44 kN·m obtained under dead load is governed by the equilibrium of the structure above the critical section. The only quantity that refinement alters is the local bending produced by the self-weight of a member between two nodes, bounded by wh2/(8n2); for the heaviest chord (w = 0.59 kN/m), this is 0.14, 0.036 and 0.016 kN·m for one, two and three elements per member, i.e., at most 0.01% of the maximum moment, which is negligible for the analysis that follows. The model also satisfies GB/T 13752-2017 [24]: under the three standard load combinations defined in Section 2.2, the maximum stress is 97.3, 109 and 112 MPa, well below the 257 MPa allowable for Q345B, and the maximum displacement occurs at the jib tip.
2.2. Load Analysis of the Tower Crane
According to the “Design rules for tower cranes” (GB/T 13752-2017) [24], three load combinations are defined for tower cranes. Combination A consists of the basic loads, namely the dead load, the hoisted load and the horizontal inertia load, and corresponds to the normal working state, in which the wind load is not included. Combination B consists of the basic loads and the additional loads, including the wind load under working conditions, and represents the maximum loads that the tower crane may encounter during its service life. Combination C consists of the basic loads and the special loads, including the maximum non-working wind load, and corresponds to the out-of-service state.
In this study, Combination B is adopted as the load case for the strength verification of the structure, so that the tower crane is checked under the most unfavorable working loads. The main loads involved in Combination B are analyzed and calculated below, primarily including the dead load caused by the structure’s self-weight, the hoisting dynamic load during lifting operations, the inertia load generated by the mechanism’s variable speed motion, and the wind load under environmental action.
(1) Dead load
The dead load of a tower crane is the basic static load generated by the weight G of the tower mast, slewing mechanism, jib, counter-jib, counterweight, and ancillary components. However, under hoisting conditions, significant vibrations may occur at the moment of lifting the load or during braking during descent. Therefore, when calculating the dead load, the influence of the hoisting impact factor on the self-weight needs to be considered. The self-weight should be multiplied by the hoisting impact factor.
where Fg is the dead load, G is the self-weight of the tower crane, and ϕ1 is the hoisting impact factor, ranging from 0.9 to 1.1. In this paper, ϕ1 = 1 is taken.
(2) Hoisting dynamic load
The hoisting load of a tower crane refers to the load generated when the hook lifts an object. Its magnitude is determined by factors such as the weight of the lifted load, lifting height, and jib angle. During lifting or braking operations, the hoisting load generates an additional dynamic effect, so the calculation must be multiplied by the hoisting dynamic factor ϕ2.
where FD is the hoisting dynamic load, FQ is the total weight of all loads on the hook, and ϕ2 is the hoisting dynamic factor (ϕ = 1.2), with the calculation formula expressed as ϕ2 = 1.05 + 0.4(νh − 0.2), where νh is the hoisting speed.
(3) Inertia load
When a tower crane accelerates, decelerates, or changes its motion state, inertia loads are generated due to the inertia of objects. Especially during hoisting, luffing, and slewing processes, this can lead to large instantaneous forces or impact forces, affecting the structural stability and operational safety of the crane. Therefore, inertia loads need to be considered [25].
- (I)
- The calculation formula for the inertia load under slewing conditions is
- (II)
- The calculation formula for the inertia load under luffing conditions is
(4) Wind load FW
Wind load is a critical environmental load affecting the stability of the tower crane. The most unfavorable working conditions need to be considered during analysis. The calculation formula for wind load under operating conditions is
where CW is the wind force coefficient, A is the windward area perpendicular to the wind direction, PW1 is the calculated wind pressure for normal operating conditions, taken as PW1 = 150 (N/m2), and PW2 is the maximum calculated wind pressure for operating conditions, taken as PW2 = 250 (N/m2).
3. Construction of Multi-Working-Condition Prediction Model for Tower Mast Bending Moment
3.1. Principle and Conditions of Moment Balance for Tower Cranes
The simplified force analysis diagram of the tower crane is presented in Figure 3. During the hoisting process, the moment generated by the hoisted load is defined as the working moment Mb, whose magnitude is governed by the weight of the hoisted load Wb and the distance from the hoisted load to the slewing center of the tower mast Lb (i.e., the working radius). Meanwhile, the counterweight mounted on the counter-jib generates a balancing moment Mc opposite in direction to the working moment, so as to maintain the overall stability of the complete machine [26]. When the tower crane is in the balance state, the working moment is equal to the balancing moment, and the stay cable tensions on the main jib side Fb and the counter-jib side Fc are also kept in balance. The corresponding moment balance equation can be expressed as
where Wc is the weight of the counterweight, and Lc is the distance from the counterweight to the tower mast.
Figure 3.
Simplified force analysis diagram of tower crane.
The moment balance of a tower crane is the core prerequisite for ensuring its overall stability and safe operation. To prevent the tower crane from overturning, the moment balance conditions must be strictly satisfied, that is,
Namely, the working moment shall not exceed the balancing moment, otherwise overturning failure of the tower crane may occur.
3.2. Multi-Working-Condition Analysis of Tower Mast Bending Moment
3.2.1. Analysis of Tower Mast Bending Moment Under No-Load Condition
Under the condition that only the structural self-weight is considered (with the standard gravitational acceleration applied), the finite element (FE) model of the QTZ6010 tower crane was solved, and the bending moment distribution of the tower mast under the no-load condition was obtained as presented in Figure 4. The calculation results indicate that the maximum bending moment of the tower mast under no-load condition reaches 1489.44 kN·m, which occurs at element No. 380 near the tower apex. The bending moment of the entire tower mast exhibits a nonlinear distribution along the height, with the minimum value occurring at the bottom of the tower mast. This distribution pattern demonstrates that the rotary tower section and its adjacent area serve as the concentration zone of bending moment peaks under the action of self-weight. Through integral processing of the bending moment data, the total bending moment of the tower mast under the no-load condition is calculated as 49.277 kN·m, which exhibits an overall mechanical behavior characterized by backward tilting bending moment. This result provides a baseline reference for the subsequent comparative analysis of the variation in tower mast bending moment under different working conditions.
Figure 4.
Bending moment of tower mast under no-load condition.
3.2.2. Analysis of Tower Mast Bending Moment Under Different Counterweight Radius Conditions
To investigate the influence of the movable counterweight on the bending moment of the tower mast, the MASS21 mass element was adopted to apply the counterweight (total mass = 14 t) to the nodes of the counter-jib. By adjusting the position of the loading node of this mass element, the horizontal movement of the counterweight along the counter-jib was simulated, as illustrated in Figure 5.
Figure 5.
Counterweight loading of tower crane.
The specific numerical simulation was conducted based on the initial counterweight radius of the QTZ6010 tower crane (with the center of gravity distance from the slewing center Lc = 13.7 m). A series of discrete counterweight radii (with distances from the slewing center of 12.2 m, 12.7 m, 14.2 m, 14.7 m, 16.2 m, and 16.7 m) were selected within the travel range of the counter-jib for calculation. Static solutions were sequentially performed for each position in the SolidWorks 2022 SP5.0 Parametric Design Language (APDL) to calculate the bending moment response of each element of the tower mast under different counterweight radii, and the corresponding tower mast bending moment distribution diagrams were finally yielded, as presented in Figure 6.
Figure 6.
Bending moment of tower mast under different counterweight center of gravity positions. (a) 12.2 m. (b) 12.7 m. (c) 14.2 m. (d) 14.7 m. (e) 16.2 m. (f) 16.7 m.
As can be seen from Figure 6a,b, when the position of the counterweight center of gravity is lower than the initial center of gravity (13.7 m) (i.e., 12.2 m and 12.7 m), the maximum bending moment of the tower mast occurs at element No. 388, and the bending moment distribution exhibits a significant localization characteristic, mainly concentrated in the rotary tower section area, while the main body of the tower mast bears a relatively small load. In contrast, when the position of the counterweight center of gravity is higher than the initial center of gravity (14.2 m, 14.7 m, 16.2 m, and 16.7 m), as shown in Figure 6c–f, the element with the maximum bending moment shifts forward to element No. 379. The bending moment borne by the main body of the tower mast increases significantly, and the overall stress distribution tends to be homogenized, yet the rotary tower section remains the concentration zone of bending moment peaks. This variation law indicates that the counterweight position has a significant influence on the mechanical characteristics of the tower mast, and the distribution of mechanical responses of the tower crane structure can be optimized by reasonably adjusting the counterweight.
The bending moment values of the tower mast under different counterweight positions are extracted, and the variation curve is plotted as shown in Figure 7. The relationship between the counterweight position Lc (m) and the tower mast bending moment M (kN·m) is obtained by fitting with the least-squares method:
Figure 7.
Bending moment of tower mast at different counterweight center of gravity positions.
It can be seen from the fitting results that the tower mast bending moment has a significant positive correlation with the distance of the counterweight center of gravity. That is, the farther the counterweight is from the tower mast, the larger the backward tilting bending moment borne by the tower mast. This law is in complete agreement with the principle of moment balance, which verifies the reliability of the simulation results and provides a theoretical basis for the formulation of subsequent dynamic counterweight adjustment strategies.
3.2.3. Analysis of Tower Mast Bending Moment Under Different Hoisted Load Weights
To investigate the influence law of hoisted load weight on the bending moment of the tower mast, a comparative analysis is performed by varying the hoisted load mass under the same working radius. Considering the actual operating conditions and safety requirements of the tower crane comprehensively (Table 2), 60 m (the most dangerous condition) is chosen as the fixed working radius.
Table 2.
Lifting capacity corresponding to each working radius of QTZ6010 tower crane.
In the finite element analysis of tower cranes, the loading method of the hoisted load directly affects the reliability of the simulation results. Under actual working conditions, the hoisted load is transferred to the end of the lifting jib through the steel wire rope and hook system, which can be simplified as a concentrated vertical downward force. In the APDL finite element model, this load is applied as a concentrated force on the corresponding nodes of the lower chord of the lifting jib. Considering that the jib-end structure consists of two key nodes, the total hoisted load is equally divided and applied to these two nodes to accurately simulate the load distribution. Based on the selected fixed working radius, simulation analyses are carried out by applying hoisted loads ranging from 100 kg to 1000 kg, with an interval of 100 kg. The simulation results are presented in Figure 8.
Figure 8.
Bending moment of tower mast under different hoisted loads at 60 m working radius. (a) 100 kg. (b) 200 kg. (c) 300 kg. (d) 400 kg. (e) 500 kg. (f) 600 kg. (g) 700 kg. (h) 800 kg. (i) 900 kg. (j) 1000 kg.
As can be seen from Figure 8a,b, when the hoisted load is less than 300 kg, the maximum bending moment is located at element No. 388. The bending moment is mainly concentrated in the rotary tower section area, while the main body of the tower mast carries a relatively small load, showing an obvious localization characteristic. As shown in Figure 8c–j, when the hoisted load exceeds 300 kg, the element corresponding to the maximum bending moment shifts to element No. 379. The bending moment distribution spreads toward the main body of the tower mast, and the overall stress distribution becomes more uniform. This change indicates that the increase in hoisted load lowers the stress center of the tower mast and leads to an obvious transition of the structural load-bearing pattern, from local loading to global loading, making the stress distribution of the tower mast more balanced.
The bending moment data of the tower mast under different hoisted load weights at the working radius of 60 m were analyzed and processed, and the corresponding variation curve of bending moment was obtained, as shown in Figure 9.
Figure 9.
Variation of tower mast bending moment with hoisted load weight at 60 m working radius. (a) Bending moment in the corresponding direction. (b) Bending moment without the corresponding direction.
The positive and negative signs of bending moment in the bending moment diagram indicate the direction of bending moment. It can be seen from Figure 9 that under the working condition of 60 m working radius, the bending moment of the tower mast shows a trend of first decreasing and then increasing with the increase of hoisted load weight.
When the hoisted load weight is less than 250 kg, the tower mast bending moment decreases gradually and remains positive, which represents the backward tilting bending moment. At this stage, the bending moment is smaller than that under no-load conditions, i.e., Wb × Lb < Wc × Lc. To maintain the balance of the tower crane, the counterweight position should be properly adjusted toward the tower mast so as to reduce Lc, thus lowering the backward tilting bending moment, until the working moment and the balancing moment are in equilibrium.
However, when the hoisted load weight exceeds 250 kg, the tower mast bending moment begins to increase and changes from positive to negative, becoming the forward tilting bending moment. At this time, the bending moment is larger than that under the no-load condition, i.e., Wb × Lb > Wc × Lc. To maintain the stability of the tower crane, the counterweight should be moved away from the tower mast to increase the Lc, thereby enhancing the backward tilting bending moment to compensate for the forward tilting bending moment. In this way, the working moment and the balancing moment can be rebalanced to ensure the safe and stable operation of the tower crane.
3.2.4. Analysis of Tower Mast Bending Moment Under Different Working Radii
To systematically investigate the influence law of working radius on the tower mast bending moment, a comparative analysis is performed for multiple working conditions with different working radii under the premise of keeping the hoisted load weight unchanged. In the finite element model, the hoisted load is applied to the corresponding nodes of the lower chord of the lifting jib in the form of a concentrated force, and the working radius is determined by the position of this loading node. Therefore, the actual luffing process of the tower crane can be accurately simulated by adjusting the position of this node in APDL.
To ensure the representativeness and reliability of the analysis results, the maximum hoisted load of 1000 kg corresponding to the most dangerous working condition of the tower crane (60 m working radius) is still adopted as the fixed hoisted load value. Simulation calculations are performed by applying the same hoisted load at different working radius positions (5 m, 12 m, 19 m, 24 m, 30 m, 36 m, 42 m, 48 m, 54 m, 60 m). Through static solution, the tower mast bending moment distribution corresponding to each working radius is obtained, as shown in Figure 10.
Figure 10.
Bending moment of tower mast under different working radii. (a) 5 m. (b) 12 m. (c) 19 m. (d) 24 m. (e) 30 m. (f) 36 m. (g) 42 m. (h) 48 m. (i) 54 m. (j) 60 m.
As shown in Figure 10, the variation of working radius has a significant effect on the distribution pattern of the tower mast bending moment. When the working radius is less than 24 m, the maximum value of the tower mast bending moment occurs at element No. 388, and the peak bending moment is mainly concentrated in the Rotary Tower Section area, while the bending moment in the main body of the tower mast is small, indicating that the structural load is mainly borne by the upper part at this time. As the working radius increases to more than 24 m, the element with the maximum bending moment shifts forward to element No. 379, the position of the peak value gradually moves downward, the bending moment distribution becomes more uniform, and the bending moment borne by the main body of the tower mast increases significantly. This change indicates that the increase of working radius adjusts the overall mechanical characteristics of the tower crane, and the load-bearing mode gradually transitions from upper concentrated loading to overall collaborative loading.
After extraction, analysis and processing of the tower mast bending moment data under different working radii with a fixed hoisted load of 1000 kg, the corresponding bending moment curve was finally generated, as shown in Figure 11.
Figure 11.
Bending moment of tower mast under different working radii. (a) Bending moment in the corresponding direction. (b) Bending moment without the corresponding direction.
3.2.5. Analysis of Tower Mast Bending Moment Under Different Hoisted Load Weights and Working Radii
To systematically reveal the coupling influence mechanism of hoisted load weight and working radius on the tower mast bending moment, the bending moment data under different combined working conditions were obtained through finite element simulation. The bending moment–hoisted load curves with working radius as the parameter and the bending moment–working radius curves with hoisted load as the parameter were plotted for comprehensive analysis, as shown in Figure 12. The results show that the tower mast bending moment presents a consistent non-monotonic trend of first decreasing and then increasing with the single-factor variation of either hoisted load or working radius, and there exists a critical point where the bending moment reaches the minimum value. Further analysis reveals that the critical hoisted load value is negatively correlated with the working radius (the larger the working radius, the smaller the critical hoisted load), and the critical working radius value is also negatively correlated with the hoisted load weight (the larger the hoisted load, the smaller the critical working radius). These findings jointly demonstrate that there is a significant interactive coupling effect between hoisted load and working radius on the balance state of the tower crane: a smaller working radius requires a larger hoisted load to achieve balance, while a larger hoisted load can only reach the optimal stress state at a smaller working radius. This coupling law provides a clear fundamental basis for the subsequent establishment of the binary bending moment prediction model.
Figure 12.
Tower mast bending moment–working radius curves under different hoisted load weights and working radii. (I) Bending moment–hoisted load curves with working radius as the parameter. (II) Bending moment–working radius curves with hoisted load as the parameter.
3.3. Establishment of Tower Mast Bending Moment Prediction Model for Tower Crane
To quantitatively describe the variation law of tower mast bending moment under the coupling effect of hoisted load and working radius, and to realize the rapid prediction of bending moment under any working condition, this section establishes the mathematical model of tower mast bending moment based on the aforementioned simulation data. Considering that the Hoisting Condition (fixed working radius) and Luffing Condition (fixed hoisted load) in the actual operation of the tower crane are usually implemented as independent processes, unary prediction models applicable to the two dominant working conditions are derived from the unified binary relationship to improve the practicability of the model under specific working conditions.
During the model establishment, the following basic assumptions are introduced to simplify the problem:
(1) Parameter Independence Assumption: The working radius and hoisted load weight are regarded as mutually independent input variables. The tower mast bending moment considered in this model is the one generated by the hoisted load and the working radius under the normal working state. Environmental actions such as the wind load and the temperature effect are not included in the prediction model; these actions are accounted for by the load combination of Section 2 and by the permissible working wind speed.
(2) Structural Idealization Assumption: The tower mast structure is simplified into a linear elastic truss system. Only the responses of bending moment and axial force are considered, while material nonlinearity, large geometric deformation and shear effect are ignored.
(3) Load Simplification Assumption: The hoisted load is simplified as a static concentrated force, and the dynamic effects caused by hoisting, braking and swinging of the load are not included in the prediction model. These effects are represented in the load combination of Section 2 by the hoisting dynamic factor and the inertia loads and are simulated by the rigid–flexible coupling model in Section 4.
Based on the above assumptions, the least-squares method is adopted to conduct fitting and analysis on the series of simulation data points obtained in Section 3.2.5. To facilitate engineering application, explicit prediction models respectively applicable to the Hoisting Condition and Luffing Condition are analytically derived from the data, as follows:
where M1 and M2 are the tower mast bending moments under the Hoisting Condition and Luffing Condition, respectively; is the actual working radius under the Hoisting Condition; is the actual hoisted load weight under the Luffing Condition. The value ranges of the hoisted load weight and working radius are subject to the constraints specified in Table 2.
Equations (10) and (11) both present as linear functions in form, which intuitively reveal the linear response law of bending moment with the variation of a single variable. Meanwhile, the slope term of each equation contains another fixed working condition parameter (Wb or Lb), which mathematically characterizes the coupling influence mechanism between hoisted load and working radius: the value of the fixed parameter determines the variation sensitivity of bending moment to the other variable.
To assess the quality of the two fits objectively, the standard statistical indicators of the regression were calculated; here, e denotes the residual, i.e., the difference between the predicted and the simulated bending moment, and F is the statistic of the overall significance test of the regression. The results are listed in Table 3. Both regressions are significant at the 0.001 level. Equations (10) and (11) explain 99.79% and 98.83% of the variance of the tower mast bending moment (with adjusted R2 of 0.9978 and 0.9880), with RMSE values of 2.58 and 6.40 kN·m, i.e., 1.2% and 2.6% of the bending moment range covered by the two data sets. A repeated split-half cross-validation gives cross-validated RMSE values of 2.2 and 2.9 kN·m, which are of the same order as the in-sample values, indicating that neither model is over-fitted. The accuracy of the two equations is therefore sufficient for the counterweight adjustment in Section 4, which is further confirmed by the independent dynamic verification (relative errors below 0.1% and 0.7%, respectively).
Table 3.
Statistical indicators of the bending moment prediction models.
The establishment of the prediction model enables rapid and quantitative evaluation of the bending moment state of the tower crane under its dominant operating working conditions. By substituting the real-time monitored hoisted load weight and working radius into the corresponding model, the predicted value of the tower mast bending moment can be calculated, which provides an efficient calculation tool and theoretical basis for the judgment of balance state, calculation of unbalanced moment, and decision-making of dynamic counterweight adjustment.
4. Multi-Working-Condition Balance Adjustment Research for Tower Cranes
4.1. Virtual Prototype Model Establishment and Simulation Condition Definition
Based on the parameters of the QTZ6010 tower crane, a rigid–flexible coupling virtual prototype of the tower crane is established for multi-working-condition dynamic analysis. The rigid body modeling of this prototype is completed in SolidWorks 2022 SP5.0, and the flexible body of the lifting jib is generated in ADAMS using the modal neutral file (MNF). Meanwhile, the Cable module is employed to refine the simulation of the dynamic behavior of the steel wire rope. The overall model is presented in Figure 13. The constraints between key components are shown in Table 4. The drives of the hoisting mechanism and the luffing mechanism are defined by STEP functions, and model verification is completed to ensure the reliability of the simulation.
Figure 13.
Rigid–flexible coupling model of tower crane.
Table 4.
Constraints between components of tower crane virtual prototype.
To systematically verify the established bending moment prediction model and the balance adjustment strategy, three typical working conditions are defined for simulation analysis: (1) Hoisting Condition: with a working radius of 45.65 m, a hoisted load of 1 t is accelerated from rest, lifted at a constant speed, and then decelerated to a stop; (2) Luffing Condition: with a hoisted load of 1 t, the trolley starts from a working radius of 45.65 m, moves at a constant speed to 47.65 m, and then decelerates to a stop; (3) Hoisting–Luffing Combined Condition: the above hoisting and luffing actions are performed sequentially.
The counterweight is carried by a trolley on a guide rail along the counter-jib and driven by a traction winch through a rope-and-pulley system, following the same principle as the luffing trolley [4,5,7]. Its travel is 12.2–16.7 m, and the positions required in Section 4.2, Section 4.3 and Section 4.4 lie between 14.7 and 16.1 m. The largest repositioning is 1.4 m and is completed within 5 s, i.e., at a peak speed of about 0.4 m/s. Since the counterweight is repositioned in the multibody model with the same schedule, the bending moments obtained in Section 4 already include the dynamic effect of its displacement, and the deviations of the prediction model under these conditions remain below 1% (Table 5), which indicates that the quasi-static counterweight position adopted in the prediction equation is adequate.
Table 5.
Verification of tower mast bending moment prediction under hoisting condition.
4.2. Balance Adjustment Verification Under Hoisting Condition
To verify the effectiveness of the prediction model and the balance strategy in dynamic hoisting operations, a simulation analysis is carried out under the working conditions with a working radius of 45.65 m and a hoisted load of 1 t. The hoisting velocity curve is applied to the hoisting mechanism in three stages: acceleration (0–10 s), constant speed (10–30 s), and deceleration (30–40 s). The corresponding drive function is expressed as follows.
The time-history curves of the hoisted load velocity, displacement, and system dynamic load obtained from the simulation are presented in Figure 14. The analysis indicates that during the initial acceleration phase from 0 to 5 s, the dynamic load continuously increases and reaches its peak at 5 s. This phase corresponds to the process of the steel wire rope being tensioned and the hoisted load about to leave the ground. During the constant-speed phase from 10 to 30 s, the dynamic load stabilizes at approximately 1.0 times the static load. During the deceleration phase from 30 to 35 s, the dynamic load decreases to a valley value (approximately 0.8 times the static load). This variation law conforms to the dynamic characteristics of the start–braking process of the hoisting mechanism.
Figure 14.
Motion curves of the system under hoisting condition. (a) Hoisting velocity of hoisted load. (b) Hoisting displacement of hoisted load. (c) Dynamic load during hoisting of hoisted load.
The dynamic load at each time instant is applied as a boundary condition to the finite element model for transient dynamic analysis, and the contour diagrams of the tower mast bending moment at key time nodes (Figure 15) as well as the bending moment time-history curve throughout the entire process (Figure 16) are obtained. The results show that the maximum bending moment of the tower mast always appears near the rotary tower section (element No. 379). The bending moment reaches its maximum value of −139.41 kN·m at 5 s (the moment of dynamic load peak) and its minimum value of −87.36 kN·m at 35 s (the moment of dynamic load valley). The variation phase of the bending moment is completely consistent with that of the dynamic load curve, which intuitively confirms that under a fixed working radius, the tower mast bending moment exhibits a linear positive correlation with the hoisted load, aligning with the conclusions drawn in Section 3.3 (Figure 12 and Table 3).
Figure 15.
Tower mast bending moment at key time nodes under hoisting condition. (a) 5 s. (b) 10 s. (c) 20 s. (d) 30 s. (e) 35 s. (f) 40 s.
Figure 16.
Tower mast bending moment under hoisting condition. (a) Tower mast bending moment with direction. (b) Tower mast bending moment without direction.
To quantitatively verify the accuracy of the prediction model, the hoisted load weight and working radius (Lb = 45.65 m) at each time instant are substituted into the model for calculation, and the predicted values are compared with the simulation results (Table 5).
The relative errors at all key time points are less than 0.1%, indicating that the model maintains extremely high computational accuracy even during the dynamic hoisting process. Based on this reliable prediction, combined with the functional relationship between counterweight position and bending moment obtained in Section 3.2.2, the optimal real-time adjustment trajectory of the counterweight that minimizes the tower mast bending moment is calculated (Table 6). After dynamic adjustment according to this trajectory, the residual bending moment of the tower mast is significantly reduced to 1.24 kN·m, which reduces the structural stress and improves the stability of the hoisting operation.
Table 6.
Counterweight center of gravity position at key time nodes under hoisting condition.
4.3. Balance Adjustment Verification Under Luffing Condition
Under the luffing condition, with a hoisted load of 1 t, the process of the trolley moving from a working radius of 45.65 m to 47.65 m is simulated. The motion phases are divided into static balance (0–5 s), acceleration (5–10 s), constant speed (10–25 s), and deceleration (25–30 s), which are applied to the luffing mechanism. The corresponding drive function is expressed as follows.
The velocity, position, and load variation curves of the luffing trolley are presented in Figure 17. The load curve indicates that during the static balance phase from 0 to 5 s, the load remains constant. During the acceleration phase from 5 to 10 s, the load gradually increases due to the influence of inertial force. During the constant-speed phase from 10 to 25 s, the acceleration of the trolley vanishes, so that the inertia force of the luffing drive disappears; nevertheless, the load still exhibits periodic fluctuations, which originate from the swing of the hoisted load and the corresponding periodic variation of the rope tension. During the deceleration phase from 25 to 30 s, the load gradually decreases.
Figure 17.
Motion curves of the system under luffing condition. (a) Luffing trolley velocity. (b) Luffing trolley position (working radius). (c) Luffing trolley load. (d) Hoisted load velocity.
The corresponding tower mast bending moment analysis results (Figure 18 and Figure 19) show that the bending moment reaches its maximum magnitude of −144.96 kN·m at the end of the constant-speed phase (25 s), where the working radius is the largest, and its minimum magnitude near the end of the motion (30 s). Throughout the process, the bending moment is governed by the coupling of two factors: the increase in working radius lengthens the static moment arm and tends to raise the bending moment monotonically, while the inertial forces during start-up and braking generate additional dynamic moments. During the constant-speed phase, although the inertia force of the luffing drive disappears, the bending moment continues to rise after a brief correction, because the working radius keeps increasing and the static moment arm therefore keeps growing. The minor fluctuations between 22 and 25 s are related to the swing of the hoisted load.
Figure 18.
Tower mast bending moment at key time nodes under luffing condition. (a) 5 s. (b) 10 s. (c) 16 s. (d) 25 s. (e) 27 s. (f) 30 s.
Figure 19.
Tower mast bending moment under luffing condition. (a) Tower mast bending moment with direction. (b) Tower mast bending moment without direction.
A comparison between the model-predicted values based on Equation (11) and the simulated values at key time points is presented in Table 7, with a maximum error of 0.67%, which verifies the reliability of the model under the luffing condition.
Table 7.
Verification of tower mast bending moment prediction under luffing condition.
The dynamic counterweight adjustment scheme based on this is shown in Table 8. By moving the counterweight in a timely manner, the residual bending moment of the tower mast is ultimately controlled at 2.33 kN·m, meeting the balance design requirements for luffing operations.
Table 8.
Counterweight center of gravity position at key time nodes under luffing condition.
4.4. Balance Adjustment Verification Under Hoisting–Luffing Combined Condition
The combined condition simulates a continuous operation process in which hoisting is performed first, followed by luffing: the hoisting of a 1 t load is completed within 0–15 s, followed by a stationary period from 15 to 20 s, and then luffing is carried out from 20 to 45 s. The drive functions for hoisting and luffing are respectively applied to the hoisting mechanism and the luffing mechanism as follows.
Under this working condition, the motion and load response of the system are more complex (Figure 20). The load borne by the luffing trolley is the superposition of the hoisting load and the luffing load.
Figure 20.
Motion curves of the system under hoisting–luffing combined condition. (a) Luffing trolley velocity. (b) Luffing trolley position (working radius). (c) Luffing trolley load. (d) Hoisted load velocity.
The response of the tower mast bending moment (Figure 21 and Figure 22) also reflects this coupling. The bending moment reaches its global maximum value of −144.96 kN·m at the end of the luffing acceleration phase (40 s), at which point the hoisting load and the luffing inertial force act together. The dynamic variation of the bending moment clearly reveals the dominant factors in different phases: during the hoisting phase, it is mainly influenced by the variation of the hoisted load; during the luffing phase, it is jointly modulated by the working radius and the inertial force. Under this complex working condition, the prediction model still maintains excellent performance, with errors at all time points being less than 1% (Table 9).
Figure 21.
Bending moment at key time nodes under hoisting–luffing combined condition. (a) 5 s. (b) 10 s. (c) 15 s. (d) 20 s. (e) 25 s. (f) 32 s. (g) 40 s. (h) 45 s.
Figure 22.
Tower mast bending moment under hoisting–luffing combined condition. (a) Tower mast bending moment with direction. (b) Tower mast bending moment without direction.
Table 9.
Verification of tower mast bending moment prediction under combined condition.
The dynamic counterweight adjustment trajectory implemented based on the prediction results is presented in Table 10. After adjustment, the residual bending moment of the tower mast is 4.33 kN·m. Although the stress becomes more complex due to load superposition, resulting in a larger residual bending moment than under single working conditions, the adjustment strategy still significantly improves the balance state, demonstrating the effectiveness of this method in dealing with combined actions.
Table 10.
Counterweight center of gravity position at key time nodes under hoisting–luffing combined condition.
5. Conclusions
Aiming at the structural safety hazards caused by moment imbalance during the dynamic operation of tower cranes, this study proposes a dynamic balance adjustment method based on real-time prediction of the tower mast bending moment using a movable counterweight, and its effectiveness is examined through a series of numerical simulations. The main conclusions are as follows:
(1) Through parametric finite element modeling and multi-working-condition static analysis, it is clarified that the tower mast bending moment is influenced by the coupling effect of the hoisted load, the working radius, and the counterweight position, exhibiting a non-monotonic variation trend of first decreasing and then increasing, with a critical working condition point where the bending moment reaches its minimum. The interaction between the hoisted load and the working radius is significant, with the critical hoisted load value decreasing as the working radius increases, and the critical working radius value decreasing as the hoisted load increases.
(2) Based on the simulation data, unary linear bending moment prediction models applicable to the Hoisting Condition and the Luffing Condition are established. These models reflect the dual-factor coupling mechanism. Verification under the Hoisting Condition, Luffing Condition, and Combined Condition shows that the prediction errors of the models are all less than 1%, demonstrating a high accuracy for the simulated working conditions.
(3) Based on the prediction models and the functional relationship between counterweight position and bending moment, a dynamic adjustment strategy for the movable counterweight is proposed. The simulation results indicate that under the three typical working conditions of the Hoisting Condition, Luffing Condition, and Hoisting–Luffing Combined Condition, this strategy reduces the residual bending moment of the tower mast to 1.24 kN·m, 2.33 kN·m, and 4.33 kN·m, respectively, showing a potential for improving the dynamic stability of the tower crane.
This study provides a theoretical basis for the active balance control of tower cranes. Future work will investigate the optimization of the model under complex environmental loads, and the prediction and adjustment method will be validated experimentally before being integrated into an actual control system.
Author Contributions
Conceptualization, Z.X. and L.X.; methodology, H.M. and Q.J.; software, H.M. and Q.J.; validation, H.M., Z.C. and H.W.; formal analysis, H.M. and Q.J.; investigation, H.M., Z.C., Q.J. and H.W.; resources, Z.X. and Z.C.; data curation, H.M. and Z.C.; writing—original draft preparation, Z.X.; writing—review and editing, Z.X., Z.C., Q.J., H.W. and L.X.; visualization, H.M. and H.W.; supervision, L.X.; project administration, L.X.; funding acquisition, L.X. All authors have read and agreed to the published version of the manuscript.
Funding
This research was funded by the Guangxi Science and Technology Achievement Transformation Plan (Grant No. Guike ZG2600640060) and Guangxi Science and Technology Base and Talent Special Project (Grant No. Guike AD25069080).
Institutional Review Board Statement
Not applicable.
Informed Consent Statement
Not applicable.
Data Availability Statement
The data presented in this study are available in the article.
Conflicts of Interest
The authors declare no conflict of interest.
References
- Yu, Z.; Li, H. A Novel Flexible Multibody System Dynamic Analysis Platform of Tower Crane. Machines 2025, 13, 1103. [Google Scholar] [CrossRef] [Scilit]
- Liu, P.; Zhao, C.; Sun, Y.; Zhang, X. Impact of Multiple Operating Parameters Interactions on Load Swing of Tower Cranes. Machines 2025, 13, 85. [Google Scholar] [CrossRef] [Scilit]
- Farrage, A.; Amir, N.A.; Takahashi, H.; Sasai, S.; Sakurai, H.; Okubo, M.; Uchiyama, N. Time-Optimal and Collision-Free Trajectory Generation for Large Cranes with Load Sway and Tower Torsion Suppression. Machines 2026, 14, 430. [Google Scholar] [CrossRef] [Scilit]
- Jiang, W.; Yin, Y.M.; Liu, J.H.; Zhou, X.L.; Xiao, Y. Research and development of a folding boom tower crane with synchronously moving counterweight. Constr. Mach. 2017, 38, 34–35. [Google Scholar] [CrossRef]
- Qin, J. Top structure design of single-jib tower crane with rocking balance arm. Hoist. Convey. Mach. 2019, 46, 99–103. [Google Scholar] [CrossRef]
- Yang, Y.; Zhang, Z.; Xu, L.J.; Yao, G. Mechanical performance and failure mode research on the braced frame joint of tower cranes in high-rise building construction. Front. Mater. 2022, 9, 824693. [Google Scholar] [CrossRef] [Scilit]
- Wang, H.J.; Yuan, J.H.; Lu, S.L.; Qi, Z.A.; Shen, Y.Z.; Xie, F.; Liu, L. Automatic counterweight control and dynamic characteristic analysis of a tower crane. J. Mech. Electr. Eng. 2021, 38, 108–112. [Google Scholar] [CrossRef]
- Montonen, J.-H.; Nevaranta, N.; Niemelä, M.; Lindh, T. Comparison of extra in sensitive input shaping and swing-angle-estimation-based slew control approaches for a tower crane. Appl. Sci. 2022, 12, 5945. [Google Scholar] [CrossRef] [Scilit]
- Price, L.C.; Chen, J.D.; Park, J.; Cho, Y.K. Multisensor-driven real-time crane monitoring system for blind lift operations: Lessons learned from a case study. Autom. Constr. 2021, 125, 103552. [Google Scholar] [CrossRef] [Scilit]
- Zhang, Z.Q.; Pan, W. Multi-criteria decision analysis for tower crane layout planning in high-rise modular integrated construction. Autom. Constr. 2021, 127, 103709. [Google Scholar] [CrossRef] [Scilit]
- Cho, S.H.; Han, S.U. Reinforcement learning-based simulation and automation for tower crane 3D lift planning. Autom. Constr. 2022, 144, 104620. [Google Scholar] [CrossRef] [Scilit]
- Li, B.X.; Ma, S.Q.; Liu, X.W.; Sun, K.; Liu, H.; Zhou, P.H. Simulation and analysis on a double-sided tower crane based on ADAMS. Mech. Res. Appl. 2018, 31, 53–55,58. [Google Scholar] [CrossRef]
- Yang, Y.; Cao, X.Y.; Gao, S.D. Rigid-flexible coupling dynamic modeling of a tower crane. Mach. Des. Manuf. 2018, 1, 79–82. [Google Scholar] [CrossRef]
- Gu, J.P.; Qin, Y.X.; Xia, Y.Y.; Jiao, Q.Q.; Gao, H.B.; Zhang, Y.Y.; Zhang, H. Research on dynamic characteristics of composite towering structure. Int. J. Appl. Mech. 2021, 13, 2150096. [Google Scholar] [CrossRef] [Scilit]
- Yuan, Z.W.; Chu, P.; Zhu, D.Y.; Liu, Q.Y.; Song, Q.L. Dynamic simulation analysis of the topless tower crane under the unintentional loss of hoist load condition due to hoist rope rupture. Constr. Mach. Technol. Manag. 2022, 35, 97–100. [Google Scholar] [CrossRef]
- Chen, W.; Qin, X.R.; Yang, Z.G.; Zhan, P.M. Wind-induced tower crane vibration and safety evaluation. J. Low Freq. Noise Vib. Act. Control 2020, 39, 297–312. [Google Scholar] [CrossRef] [Scilit]
- Augustyn, M.; Barski, M.A. Numerical and analytical determination of the critical wind speed causing the overturning of the top-slewing tower crane. Appl. Sci. 2025, 15, 4683. [Google Scholar] [CrossRef] [Scilit]
- Yu, Z.Q.; Gu, Z.J.; Lan, P.; Tian, Q.L. Multibody system dynamic modeling and order reduction of tower crane. J. Dyn. Control 2024, 22, 58–65. [Google Scholar] [CrossRef]
- Liu, F.; Yang, J.W.; Wang, J.H.; Liu, C.D. Swing characteristics and vibration feature of tower cranes under compound working condition. Shock Vib. 2021, 2021, 1–16. [Google Scholar] [CrossRef] [Scilit]
- Fu, G. Structural analysis of tower crane based on ANSYS. Constr. Mach. 2017, 37, 135–137. [Google Scholar] [CrossRef]
- Jia, Y.Y. Design and Performance Analysis of QTZ40 Tower Crane. Master’s Thesis, Jiangsu University of Science and Technology, Zhenjiang, China, 2012. [Google Scholar]
- Lin, Q.W. Finite element analysis of whole tower crane structure based on AN-SYS. Mach. Electron. 2006, 10, 67–70. [Google Scholar] [CrossRef]
- Wu, J.F. The Application of ANSYS in the structure design of tower crane. Dev. Innov. Mach. Electr. Prod. 2014, 3, 96–97+75. [Google Scholar] [CrossRef]
- GB/T 13752-2017; Design Rules for Tower Cranes. China Standards Press: Beijing, China, 2017.
- Fu, H. Development of Parametric Modeling Platform and Analysis of Structural Vibrations Characteristics for Tower Cranes. Master’s Thesis, Shandong Jianzhu University, Jinan, China, 2023. [Google Scholar]
- Du, Y.L. The Research on Automatic Weight and Remote Control System of Tower Crane. Master’s Thesis, Shenyang Jianzhu University, Shenyang, China, 2010. [Google Scholar]
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content. |
© 2026 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license.