Robust Optimization of UAV Inspection in Mountainous Expressway Networks Under Flight Time and Energy Consumption Uncertainty

,
,
,
and
1
Yunnan Transportation Research Institute Co., Ltd., Kunming 650011, China
2
School of Systems Science, Beijing Jiaotong University, Beijing 100044, China
*
Author to whom correspondence should be addressed.
This article belongs to the Section Transportation and Future Mobility

Abstract

Unmanned aerial vehicle (UAV) inspection of mountainous expressway networks involves continuously distributed tasks, coordination among multiple base stations, and uncertain flight time and energy consumption induced by no-fly-zone detours. This study develops an offline robust planning framework that jointly determines base-station locations, fleet allocation, and inspection routes. The network is modeled as a task-arc coverage problem with constraints on coverage, station capacity, individual-UAV endurance, and takeoff–landing balance. A budgeted uncertainty set represents coupled time and energy deviations, and duality yields a linear robust counterpart. A branch-and-price algorithm dynamically generates robustly feasible routes through resource-constrained shortest-path pricing. In the Kunming case study, the baseline solution opens 46 of 77 candidate stations, deploys 75 UAVs, covers all 94 task arcs, and yields a robust cumulative inspection time of 3259.16 min. Sensitivity analysis characterizes the effects of the disturbance budget and uncertainty amplitudes. Additional validation shows that the robust plan eliminates endurance violations in two 10,000-scenario within-budget tests at an 18.0% deployment-cost premium relative to the deterministic plan, while local warm-start experiments support rapid operational route replanning after deployment. The framework therefore supports reliable offline network planning together with route-level operational adjustment under changing conditions.

1. Introduction

Mountainous expressways often traverse mountain ranges, valleys, bridge–tunnel complexes, and areas prone to geological hazards. These networks are characterized by long corridors, dispersed nodes, and poor local accessibility. Although manual patrols, fixed cameras, and roadside sensing equipment support monitoring at critical locations, they provide incomplete coverage of extensive and continuous mountainous expressway networks, offer limited flexibility in responding to incidents, and may fail to identify local blind spots promptly. Advances in low-altitude traffic management, supporting infrastructure, and autonomous flight have made unmanned aerial vehicles (UAVs) increasingly important tools for inspecting transport infrastructure [1,2]. Their mobility, flexible deployment, and minimal disruption to road traffic are well suited to routine inspection of mountainous expressways. Liu and Ma [3] review UAV applications in highway monitoring and infrastructure inspection and identify endurance and coordinated operation as continuing deployment challenges.
UAV inspection of expressways concerns not isolated points but road sections, bridges, tunnel portals, and interchange connectors distributed continuously along the network. It therefore has an inherent arc-coverage structure. Corberán et al. [4] identify services along linear infrastructure, including street sweeping, postal delivery, and pipeline inspection, as arc-routing problems. Campbell et al. [5] further introduce drone arc-routing problems, in which traffic monitoring, power-line inspection, and border patrol are formulated as routing tasks that require UAVs to fly along and service linear targets. Macrina et al. [6] review UAV routing research, covering drone-assisted routing, endurance constraints, and coordinated scheduling. Wang and Sheu [7] develop a branch-and-price algorithm for integrated truck–drone routing, providing a methodological precedent for dynamic route generation. Related research in China has also expanded. Xiang et al. [8] develop a multi-UAV task-planning method for expressway patrol, while Wang et al. [9] investigate collaborative multi-UAV path planning for expressway inspection. Yan et al. [10] formulate a mixed-integer linear programming model for truck-and-drone routing under regional restrictions, and Zhang et al. [11] study routing with time windows in collaborative electric-vehicle–drone delivery. These studies provide a basis for modeling UAV inspection tasks, but most assume predetermined takeoff and landing sites and fixed base-station layouts. The interaction among base-station location, fleet allocation, and route planning in expressway networks remains insufficiently addressed.
As inspection expands from individual road sections to regional networks, operations based on a single station or fixed takeoff and landing sites become inadequate for sustained long-distance inspection. Coordination among multiple stations is therefore important for extending coverage. Dai et al. [12] study UAV-station deployment, Qiu et al. [13] optimize task allocation in heterogeneous multi-UAV docking systems, and Gao and Yu [14] investigate reliability-oriented UAV-station location for urban-management inspection. These studies show that multi-station coordination can alleviate endurance limitations but also introduce complex interactions among facility construction, fleet size, takeoff–landing balance, and route organization. In robust location–routing optimization, Tang et al. [15], Sun and Xiang [16], and Peng et al. [17] address non-probabilistic reliability, uncertain demand and facility failures, and multiple resource types, respectively. Bruni et al. [18] jointly select drone fulfillment centers and routes under uncertain flight times. In mountainous expressway networks, however, candidate station locations are constrained by network nodes, terrain, and replenishment requirements, while inspection tasks are distributed continuously along arcs. An integrated model that reflects this network structure and the cyclic operating mechanism is therefore needed.
UAV inspection of mountainous expressways also faces substantial uncertainty. No-fly-zone boundaries, detours around mountains, wind disturbances, and positioning errors can cause actual trajectories to deviate from planned ones, affecting both flight time and energy consumption. He et al. [19] study drone scheduling under uncertain energy consumption, and Kang et al. [20] integrate travel-time prediction with routing decisions. Cheng et al. [21] model payload- and distance-dependent nonlinear energy consumption and develop an exact routing algorithm. The budgeted robust optimization approach introduced by Bertsimas and Sim [22] controls conservativeness while retaining tractability. Lian et al. [23] jointly optimize UAV deployment and routing under uncertain inspection requirements and distributional ambiguity. In contrast, the present study treats inspection obligations as directed task arcs and jointly captures no-fly-zone-induced time and energy deviations, robust route endurance, and cyclic station balance.
To address these requirements, this study develops an offline robust planning framework for UAV inspection of mountainous expressway networks. The main contributions are as follows:
  • An arc-covering mixed-integer model jointly determines base-station locations, fleet allocation, and inspection routes. It permits cross-station landings while maintaining takeoff–landing balance at each station within a planning cycle. Shared arc-level disturbances capture coupled flight-time and energy deviations induced by no-fly-zone detours under a network-wide uncertainty budget. Dual reformulation yields a linear robust model that balances deployment cost against worst-case cumulative inspection time while ensuring route-level endurance under all admissible disturbances.
  • A customized branch-and-price algorithm generates robustly feasible routes on the physical network without explicit enumeration of the full candidate set. Resource-constrained shortest-path pricing tracks nominal energy and affected-arc deviation profiles, while hierarchical branching links station-opening, fleet-allocation, and route-flow decisions.
  • The Kunming case study evaluates deployment trade-offs and robustness parameters, and supplementary validation examines algorithmic performance, ex-post endurance protection, sensitivity to spatial and economic inputs, wind–temperature operating conditions, and local operational replanning. Together, these analyses identify where the offline planning framework is stable and where route or deployment adjustments become necessary.

2. Problem Description

As illustrated in Figure 1, the problem jointly optimizes UAV base station locations, fleet size, and inspection routes in mountainous expressway networks under flight-time and energy-consumption uncertainty. The expressway network is represented by a directed graph G = ( N , A ) . The node set N consists of candidate base station nodes B and ordinary nodes C, such as road-section connection points and ramp nodes, with N = B ∪ C . The directed arc set A represents pairs of nodes between which UAVs can fly. Let R ⊆ A be the set of task arcs. Each task arc a = ( i , j ) ∈ R represents an expressway section requiring inspection, and its direction specifies the UAV’s flight direction while inspecting that section.
Figure 1. Illustration of the inspection planning problem. All nodes belong to N, and their directed connections form the arc set A. Nodes a, b, c, and d form the candidate base station set B; the remaining nodes form the ordinary node set C, with N = B ∪ C .
UAVs perform inspection tasks from established base stations. Within one planning cycle, each deployed UAV executes one continuous inspection route: it takes off from an established base station, enters the expressway network, sequentially covers a set of task arcs, and lands at any established base station for energy replenishment. To sustain operations over consecutive planning cycles, the numbers of takeoffs and landings at each base station must be balanced within a cycle. UAVs may therefore land at a station other than their departure station, provided that each station retains the same number of available UAVs at the end of the cycle as at the beginning.
Mountainous expressway corridors have complex terrain, and airspace near some road sections may be restricted by no-fly zones associated with sensitive facilities or ecological conservation areas. Let A u ⊆ A denote the arcs affected by no-fly-zone detours. For a ∉ A u , UAVs can follow the planned road section without additional trajectory adjustments. For a ∈ A u , if a no-fly zone overlaps or intersects the airspace around a task arc, the flight trajectory must be reconstructed to satisfy airspace restrictions and terrain-clearance requirements. Factors such as buffers around no-fly-zone boundaries can cause actual detours to deviate from nominal estimates of flight time and energy consumption, affecting route feasibility and network-wide inspection efficiency.
The objective is to jointly determine base-station locations, fleet size, and inspection routes by minimizing a weighted sum of deployment cost and worst-case cumulative inspection time. Here, cumulative inspection time is the sum of the durations of all selected UAV routes (UAV-min) within one planning cycle, rather than the elapsed completion time or makespan of parallel operations. Robust optimization accounts for time and energy uncertainty induced by detours, yielding an integrated planning scheme that balances economic performance and operational reliability.
The model represents an offline planning layer: station locations and fleet allocations define the deployment configuration before a routine inspection cycle, and selected routes assign the planned inspection work. The fleet is modeled as homogeneous, with common flight parameters and usable battery capacity Q. Each UAV counted in m i is deployed on one selected route during the cycle; idle reserve aircraft are outside this allocation. Operational replanning after deployment is examined separately in Section 7.5.

3. Deterministic Optimization Model for UAV Inspection of Mountainous Expressway Networks

Notation is introduced at first use; Appendix A summarizes the model symbols in Table A1 and the flight-attribute and pricing symbols in Table A2.

3.1. Calculation of Nominal Arc Flight Attributes

UAVs inspect mountainous expressways by flying above the corresponding road sections. If the airspace around arc a is unaffected by a no-fly zone, a UAV can follow the road section directly. Otherwise, no-fly zones or mountain obstacles require detours or obstacle overflight that satisfy airspace restrictions and flight-safety requirements. Nominal trajectories are used to calculate the flight distance, flight time, and energy consumption of each arc.
Let l a denote the original length of the expressway section associated with arc a. For an arc affected by a no-fly zone, Δ d a is the nominal additional horizontal distance caused by the detour; otherwise, Δ d a = 0 . The nominal horizontal flight distance is therefore d a = l a + Δ d a . Let h a + and h a − denote the effective ascent and descent heights of arc a, respectively, and let l a ins be the effective length requiring inspection. Thus, l a ins = l a for a ∈ R , and l a ins = 0 for a ∉ R . Let v cr , v up , and v down be the horizontal cruise, ascent, and descent speeds, respectively. On task arcs, the original road-section length l a is flown at inspection speed v ins ; non-task road sections and the additional detour distance Δ d a on any arc are flown at cruise speed v cr . The corresponding transit and vertical-flight times are
τ a cr = 1000 3600 v cr l a 1 { a ∉ R } + Δ d a ,
τ a up = h a + 3600 v up ,
τ a down = h a − 3600 v down .
Let t ins = 1000 / v ins denote the inspection-flight time per kilometer. This mode combines travel along the task arc with image acquisition and target recognition. The inspection time on arc a is τ a ins = t ins l a ins / 3600 , giving the nominal total flight time
τ a = τ a cr + τ a up + τ a down + τ a ins .
Following phase-wise rotary-wing UAV energy modeling [24], we approximate arc energy by cruise, ascent, descent, and inspection components. Let P cr and P ins be the power requirements during cruise and inspection, respectively. Let m be the UAV mass, g the gravitational acceleration, η m the propulsion-system efficiency, and η r the descent energy-reduction factor. The component energies are
E a cr = P cr τ a cr ,
E a up = m g h a + 3600 η m ,
E a down = ( 1 − η r ) m g h a − 3600 η m ,
E a ins = P ins τ a ins .
The nominal total energy consumption on arc a is consequently
E a = E a cr + E a up + E a down + E a ins .
In these component formulas, horizontal distances are in kilometers, ascent and descent heights are in meters, speeds are in meters per second, and t ins is in seconds per kilometer. The component times are therefore in hours; with power measured in watts, the energy attributes are in watt-hours. For the numerical experiments, time attributes are converted to minutes after energy calculation, and the normalization benchmark T ¯ uses the same time unit.
Let P denote the candidate route set. Each route p ∈ P is a directed flight path departing from one candidate base station and ending at a candidate base station. Let β a p be the number of times route p traverses arc a. The nominal total flight distance, flight time, and energy consumption of route p are, respectively,
D p = ∑ a ∈ A β a p d a ,
T p = ∑ a ∈ A β a p τ a ,
E p = ∑ a ∈ A β a p E a .

3.2. Deterministic Model Formulation

The deterministic model jointly determines base station locations, fleet allocation, and inspection routes. It minimizes a weighted sum of deployment cost and cumulative inspection time, subject to task-arc coverage, base station capacity, individual UAV endurance, and takeoff–landing balance.
For each candidate base station i ∈ B , the binary variable y i indicates whether the station is established, and the integer variable m i gives the number of UAVs allocated to it. For each candidate route p ∈ P , the binary variable z p indicates whether the route is selected. The departure and arrival base stations of route p are denoted by o ( p ) ∈ B and d ( p ) ∈ B , respectively. Because landing at a different station is allowed, o ( p ) = d ( p ) is not required.
Under deterministic conditions, a route can enter the model only if its total energy consumption does not exceed the battery capacity Q of one UAV. The deterministically feasible route set is
P D = { p ∈ P ∣ E p ≤ Q } .
For each i ∈ B , define the departing and arriving feasible route sets as
P i D + = { p ∈ P D ∣ o ( p ) = i } ,
P i D − = { p ∈ P D ∣ d ( p ) = i } .
The normalized weighted objective is
Z D = λ ∑ i ∈ B f i y i + C U ∑ i ∈ B m i C ¯ + ( 1 − λ ) ∑ p ∈ P D T p z p T ¯ .
The operating constraints and variable domains are
∑ p ∈ P D β r p z p ≥ 1 , ∀ r ∈ R ,
∑ p ∈ P i D + z p = m i , ∀ i ∈ B ,
∑ p ∈ P i D − z p = m i , ∀ i ∈ B ,
m i ≤ L i y i , ∀ i ∈ B ,
y i ∈ { 0 , 1 } , ∀ i ∈ B ,
m i ∈ N 0 , ∀ i ∈ B ,
z p ∈ { 0 , 1 } , ∀ p ∈ P D .
Here, N 0 denotes the nonnegative integers. In Equation (16), the first term represents base station and fleet deployment costs, and the second represents cumulative inspection time within the planning horizon.
Constraint (17) ensures that every task arc is covered by at least one selected route. Constraints (18) and (19) equate the numbers of departing and arriving routes at each base station to its allocated fleet, thereby enforcing takeoff–landing balance within a planning cycle. Constraint (20) imposes base station capacity, and Constraints (21)–(23) specify the variable domains.
Route selection also specifies task allocation: the UAV assigned to a selected route p inspects the task arcs { r ∈ R : β r p > 0 } . For station i, exactly m i selected routes depart, and exactly m i selected routes arrive, as imposed by Constraints (18) and (19). These two route sets can differ because cross-station landing is allowed. Constraint (17) requires at least one inspection of each task arc, so coverage by more than one UAV is permitted.
The deterministic optimization model is summarized as Model (M1):
( M 1 ) min Z D , s . t . Equations ( 17 ) – ( 23 ) .

4. Robust Optimization Model for UAV Inspection of Mountainous Expressway Networks

4.1. Uncertainty in Arc Flight Time and Energy Consumption

In mountainous expressway inspection, factors such as buffers around no-fly-zone boundaries may cause actual flight trajectories to deviate from nominal ones, increasing both flight time and energy consumption. Because detour disturbances affect both quantities, they are represented using a shared uncertainty variable.
For each affected arc a ∈ A u , let τ ˜ a and E ˜ a denote its actual flight time and energy consumption under a disturbance, respectively:
τ ˜ a = τ a + τ ^ a ξ a , ∀ a ∈ A u ,
E ˜ a = E a + E ^ a ξ a , ∀ a ∈ A u .
Here, τ ^ a and E ^ a are the maximum time and energy deviations, and ξ a ∈ [ 0 , 1 ] is the normalized severity of the common detour on arc a: ξ a = 0 gives the nominal values and ξ a = 1 the maximum deviations. The shared severity links the time and energy increments through the same detour, while τ ^ a and E ^ a retain their distinct physical magnitudes. Unaffected arcs keep their nominal values, τ ˜ a = τ a and E ˜ a = E a for a ∈ A ∖ A u .
Let δ e and δ t denote the relative uncertainty levels of energy consumption and flight time. For arcs affected by no-fly-zone detours, the maximum deviations are E ^ a = δ e E a and τ ^ a = δ t ( τ a cr + τ a up + τ a down ) , a ∈ A u . Time deviations apply to the transit and vertical-flight components. To avoid the excessive conservativeness of assuming that every affected arc simultaneously experiences its maximum disturbance, the network-wide disturbance intensity is bounded by the budgeted uncertainty set
U = ξ ∈ R | A u | | 0 ≤ ξ a ≤ 1 , ∀ a ∈ A u , ∑ a ∈ A u ξ a ≤ Γ .
The effective range is 0 ≤ Γ ≤   | A u | : Γ = 0 gives nominal conditions, while Γ =   | A u | allows all affected arcs to reach their maximum deviations. The Bertsimas–Sim set [22] is adopted because it uses arc-level deviation bounds and a single conservativeness budget without requiring a fitted probability distribution. Scenario-based models instead require a prescribed realization set, while distributionally robust models require an ambiguity set for the underlying distribution [23].
For field deployment, δ e and δ t can be estimated from upper quantiles or engineering bounds of positive energy and flight-time residuals in matched flight logs. Arc observations from common operating windows can then be combined into joint severity vectors, and a selected upper quantile of their summed severities used to set Γ . Held-out windows provide an independent check of the resulting endurance protection. The values used in Section 6 are controlled experimental settings rather than field-calibrated estimates.

4.2. Robustly Feasible Routes Under Budgeted Energy Uncertainty

In the deterministic model, route p enters the feasible set whenever E p ≤ Q . Under uncertain energy consumption, every selected route must satisfy the individual UAV endurance requirement for all admissible disturbance realizations. The route-feasibility condition must therefore be robustified. The actual total energy consumption of a candidate route p is
E ˜ p ( ξ ) = ∑ a ∈ A β a p E ˜ a = E p + ∑ a ∈ A u β a p E ^ a ξ a .
For route p to remain feasible throughout the budgeted uncertainty set U , it must satisfy
E p + max ξ ∈ U ∑ a ∈ A u β a p E ^ a ξ a ≤ Q .
Accordingly, the route set satisfying robust endurance constraints is
P R = p ∈ P | E p + max ξ ∈ U ∑ a ∈ A u β a p E ^ a ξ a ≤ Q .
For a given route p, the inner worst-case energy-deviation problem in Equation (30) is the linear program (EPp):
( EP p ) max ξ ∑ a ∈ A u β a p E ^ a ξ a , s . t . ∑ a ∈ A u ξ a ≤ Γ , 0 ≤ ξ a ≤ 1 , ∀ a ∈ A u .
Introducing the dual variable α p for the disturbance-budget constraint and variables φ a p for the arc-specific upper bounds gives the equivalent dual program (EDp):
( ED p ) min α p , φ a p Γ α p + ∑ a ∈ A u φ a p , s . t . α p + φ a p ≥ β a p E ^ a , ∀ a ∈ A u , α p ≥ 0 , φ a p ≥ 0 , ∀ a ∈ A u .
Therefore, p ∈ P R if and only if there exist α p ≥ 0 and φ a p ≥ 0 , a ∈ A u , such that
E p + Γ α p + ∑ a ∈ A u φ a p ≤ Q ,
α p + φ a p ≥ β a p E ^ a , ∀ a ∈ A u .
Robust endurance is thus enforced through route-feasibility screening: routes that do not satisfy Constraints (33) and (34) for nonnegative dual variables are excluded from the robustly feasible route set. For each i ∈ B , define
P i R + = { p ∈ P R ∣ o ( p ) = i } ,
P i R − = { p ∈ P R ∣ d ( p ) = i } ,
which are the robustly feasible routes departing from and arriving at base station i, respectively.

4.3. Robust Model Formulation

The set P R ensures that every selected route satisfies the individual UAV endurance constraint under the worst admissible disturbance. Because disturbances also increase flight time, the objective must account for worst-case cumulative inspection time. For any candidate route p ∈ P R , its actual total flight time is
T ˜ p ( ξ ) = ∑ a ∈ A β a p τ ˜ a = T p + ∑ a ∈ A u β a p τ ^ a ξ a .
Given a route-selection solution z, the robust cumulative inspection time under U , denoted by T R ( z ) , is
T R ( z ) = ∑ p ∈ P R T p z p + max ξ ∈ U ∑ p ∈ P R z p ∑ a ∈ A u β a p τ ^ a ξ a .
The first term is nominal cumulative inspection time, and the second is the worst-case additional time.
The same uncertainty set is used for every route-endurance constraint and for the system time objective. Each route must satisfy its energy limit for every ξ ∈ U , whereas Equation (38) evaluates the largest aggregate time over that set. The maximizing realization may differ across routes and between energy and time; the formulation does not require these separate maxima to occur simultaneously.
The robust optimization model is Model (M2). In its referenced constraints, P D , P i D + , and P i D − are replaced by P R , P i R + , and P i R − , respectively:
( M 2 ) min Z R = λ ∑ i ∈ B f i y i + C U ∑ i ∈ B m i C ¯ + ( 1 − λ ) T R ( z ) T ¯ , s . t . Equations ( 17 ) – ( 23 ) .

4.4. Linear Reformulation of the Robust Model

To facilitate solution, the worst-case additional-time term in Equation (38) is linearized. For a given route-selection solution z,
max ξ ∈ U ∑ p ∈ P R z p ∑ a ∈ A u β a p τ ^ a ξ a = max ξ ∈ U ∑ a ∈ A u τ ^ a ∑ p ∈ P R β a p z p ξ a .
For brevity, define
q a = ∑ p ∈ P R β a p z p , ∀ a ∈ A .
The inner worst-case time-deviation problem is then the linear program (TP):
( TP ) max ξ ∑ a ∈ A u τ ^ a q a ξ a , s . t . ∑ a ∈ A u ξ a ≤ Γ , 0 ≤ ξ a ≤ 1 , ∀ a ∈ A u .
Introducing dual variables θ and s a yields the equivalent dual program (TD):
( TD ) min θ , s a Γ θ + ∑ a ∈ A u s a , s . t . θ + s a ≥ τ ^ a q a , ∀ a ∈ A u , θ ≥ 0 , s a ≥ 0 , ∀ a ∈ A u .
Substituting Equation (41) into the dual program (43) and incorporating it into Model (M2) gives the linear robust counterpart, Model (M3). The referenced constraints use the same replacements of the route sets as in Model (M2).
( M 3 ) min Z R = λ ∑ i ∈ B f i y i + C U ∑ i ∈ B m i C ¯ + ( 1 − λ ) ∑ p ∈ P R T p z p + Γ θ + ∑ a ∈ A u s a T ¯ , s . t . Equations ( 17 ) – ( 23 ) , θ + s a ≥ τ ^ a ∑ p ∈ P R β a p z p , ∀ a ∈ A u , θ ≥ 0 , s a ≥ 0 , ∀ a ∈ A u .

5. Algorithm Design

The number of candidate routes can grow combinatorially with network size. Explicitly maintaining the complete route set enlarges the master model, motivating branch-and-price to generate improving routes dynamically.

5.1. Overall Branch-and-Price Framework

The branch-and-price method embeds column generation in branch-and-bound [25]. At each node, the restricted master problem (RMP) is solved and exact pricing searches for negative-reduced-cost routes. When no such route exists, the RMP objective is a valid lower bound for that node. Integer RMP solutions update the incumbent upper bound, while fractional solutions are branched. The global lower bound is the minimum of the incumbent upper bound and the bounds of active nodes, and the algorithm terminates when no active node remains, or the prescribed relative gap is reached. The relative gap is treated as + ∞ until both bounds are finite. Algorithm 1 summarizes the procedure.

5.2. Restricted Master Problem and Pricing Subproblem

Rather than solving the linear robust model over the entire set P R , each branch-and-price iteration considers only the currently generated route subset P ¯ R ⊆ P R . Let P ¯ i R + = { p ∈ P ¯ R ∣ o ( p ) = i } and P ¯ i R − = { p ∈ P ¯ R ∣ d ( p ) = i } denote its departing and arriving routes, respectively. Restricting Model (M3) to this subset and relaxing integrality yields the RMP. In the referenced constraints, P D , P i D + , and P i D − are replaced by P ¯ R , P ¯ i R + , and P ¯ i R − , respectively.
( RMP ) min Z LP = λ ∑ i ∈ B f i y i + C U ∑ i ∈ B m i C ¯ + ( 1 − λ ) ∑ p ∈ P ¯ R T p z p + Γ θ + ∑ a ∈ A u s a T ¯ , s . t . Equations ( 17 ) – ( 20 ) , θ + s a ≥ τ ^ a ∑ p ∈ P ¯ R β a p z p , ∀ a ∈ A u , 0 ≤ y i ≤ 1 , ∀ i ∈ B , m i ≥ 0 , ∀ i ∈ B , 0 ≤ z p ≤ 1 , ∀ p ∈ P ¯ R , θ ≥ 0 , s a ≥ 0 , ∀ a ∈ A u .
The pricing subproblem searches P R ∖ P ¯ R for routes with negative reduced cost. Let π r ≥ 0 be the dual variable associated with task coverage, γ i + and γ i − the unrestricted dual variables associated with departure and arrival balance at station i, and ω a ≥ 0 the dual variable associated with the robust additional-time constraint on arc a ∈ A u . For any p ∈ P R ∖ P ¯ R , its reduced cost is
c ¯ p = 1 − λ T ¯ T p − ∑ r ∈ R π r β r p − γ o ( p ) + − γ d ( p ) − + ∑ a ∈ A u τ ^ a ω a β a p .
Since T p = ∑ a ∈ A β a p τ a , Equation (46) can be written as a sum of generalized arc costs:
c ¯ p = − γ o ( p ) + − γ d ( p ) − + ∑ a ∈ A 1 − λ T ¯ τ a + 1 { a ∈ A u } τ ^ a ω a − 1 { a ∈ R } π a β a p .
Here, 1 { · } is the indicator function; π a , ω a , and τ ^ a are extended by zero outside their respective index sets. Thus, pricing is a resource-constrained shortest-path problem on the physical network.
The variables α p and φ a p certify route-energy feasibility and are used when defining P R . In contrast, θ and s a are decision variables of the linear robust master problem that represent its worst-case additional time. The RMP multipliers π r , γ i + , γ i − , and ω a are obtained from the continuous relaxation and price a new route. In particular, the time row is written as θ + s a − τ ^ a ∑ p ∈ P ¯ R β a p z p ≥ 0 ; its route coefficient is − τ ^ a β a p , which produces the positive contribution τ ^ a ω a β a p in Equation (46). Station-capacity rows have no direct route coefficient, so their multipliers do not appear separately in that equation.
Robust endurance is evaluated exactly during labeling. Let u p a = β a p E ^ a for a ∈ A u , let u p ( 1 ) ≥ u p ( 2 ) ≥ ⋯ be these coefficients in nonincreasing order, and write Γ = k + η , where k = ⌊ Γ ⌋ and 0 ≤ η < 1 . The worst-case energy deviation is
Δ E p Γ = ∑ j = 1 k u p ( j ) + η u p ( k + 1 ) ,
where any missing ordered coefficient is defined as zero.
For a partial route, write a label as L = ( v , c , e , u , H ) , where v is its current node, c its accumulated generalized arc cost, e its nominal energy, and u a = β a E ^ a its accumulated deviation coefficient for affected arc a. The state H records the covered tasks and arc-traversal history, together with the active station, fleet, and route-branch restrictions that determine admissible continuations. The vector u is indexed by original arc identity; sorting is used only to evaluate Equation (48). Extending a label along arc b adds the generalized cost of b to c, adds E b to e, and, when b ∈ A u , adds E ^ b to u b . This update also accounts for repeated traversal of an affected arc.
Labels are compared only at the same current node and departure station, under the same branch decisions, and with the same admissible continuations and column-admissibility restrictions. Under these conditions, L 1 dominates L 2 if c 1 ≤ c 2 , e 1 ≤ e 2 , and u 1 a ≤ u 2 a for every a ∈ A u , with at least one strict inequality. Equal deviation profiles therefore permit dominance through a smaller cost or nominal energy. If all compared quantities are equal and their continuation states are equivalent, one duplicate label is retained; equality of the deviation profiles alone is insufficient to merge labels.
This is a sufficient resource-dominance test: any common suffix adds the same arc costs, nominal energies, and arc-indexed deviation coefficients to both labels, and the worst-case deviation is nondecreasing in each coefficient. Consequently, a feasible completion of the dominated label has a no-more-expensive feasible counterpart. A label is also discarded when its nominal energy plus its current worst-case deviation exceeds Q, since subsequent extensions cannot reduce either energy component. These rules follow the resource-extension principle for constrained shortest paths [26]. Pricing searches from different departure stations are independent and can be solved in parallel. The supplementary certification implementation retains distinct path labels and uses energy-based pruning, preserving column identity under binary route bounds and route branches.
Algorithm 1: Branch-and-price algorithm
   Input    Network  G = ( N , A ) ; task arcs R; candidate stations B; UAV, cost, and robustness parameters; tolerance  ε .
Output    Optimal station locations, fleet allocation, inspection routes, and objective value.
           1    Initialize U B = + ∞ and L B = L B ( N root ) = − ∞ ; construct a covering route set P ¯ R (using artificial columns if necessary); set S ← { N root } .
           2    While  S ≠ ⌀ and the relative gap exceeds ε , do:
           3        Remove a node N k from S .
           4        Solve the RMP at the current node N k .
           5        Solve all station-specific pricing subproblems exactly and add one or more negative-reduced-cost routes identified by pricing.
           6        Repeat Steps 4–5 at N k until no negative-reduced-cost route exists; set L B ( N k ) = Z LP * .
           7        If L B ( N k ) ≥ U B , prune N k .
           8        Else, if the RMP solution is integral, update the incumbent and U B .
           9        Else, create two child nodes according to Section 5.3, assign each the lower bound L B ( N k ) , and add them to S .
         10        If S ≠ ⌀ , set L B = min { U B , min N ∈ S L B ( N ) } ; otherwise, set L B = U B .
         11    Return the incumbent solution and the final bounds.

5.3. Customized Branching Strategy

When column generation converges at a node but the RMP solution remains fractional, a hierarchical branching strategy is applied. Priority is given to station-opening variables y i . If any is fractional, the variable closest to 0.50 is selected, and the two child nodes impose y i = 0 and y i = 1 . If all y i are integral but some fleet variable m i is fractional, the children impose m i ≤ ⌊ m i * ⌋ and m i ≥ ⌈ m i * ⌉ .
If y i and m i are integral but route selection remains fractional, branching is performed on aggregate arc flow:
ρ a = ∑ p ∈ P ¯ R β a p z p , ∀ a ∈ A .
Here, ρ a is the value of the full-model quantity q a on the current restricted route set and may be fractional in an RMP solution. For an arc-flow branch written as ∑ p β a p z p ≤ b or ∑ p β a p z p ≥ b , let μ a denote its signed LP dual multiplier. The corresponding contribution to the generalized arc cost is − μ a ; contributions are summed when several branch rows concern the same arc.
For a fractional ρ a * , the child nodes impose ρ a ≤ ⌊ ρ a * ⌋ and ρ a ≥ ⌈ ρ a * ⌉ . Station branches remove incompatible routes, fleet bounds remain in the RMP, and the signed contribution − μ a enters the corresponding generalized arc cost in pricing. If all aggregate arc flows are integral while some z p remains fractional, a direct branch on that route variable is used as a finite fallback. These rules preserve valid node bounds and compatibility between branching and column generation.

6. Experiments on the Kunming Expressway Network

The case study covers major expressway sections within the administrative area of Kunming, Yunnan Province, China. The network is preprocessed according to its structure, candidate-station requirements, and inspection-task distribution. The resulting network has 95 nodes and 77 candidate stations, as shown in Figure 2, with 94 inspection task arcs. Four experimental no-fly zones are introduced to represent detour disturbances under mountainous airspace restrictions.
Figure 2. Experimental expressway network in Kunming.
The four no-fly zones are hypothetical geometric inputs used to represent restricted-airspace detours in the case study. They provide controlled spatial restrictions for evaluating detour-related changes in the arc attributes. The uncertainty ratios and Γ are scenario-design parameters: δ e scales nominal arc energy, δ t scales the nominal transit and vertical-flight time, and Γ = 2 permits a total of two full-deviation equivalents distributed across the affected arcs. These settings define a controlled comparison of planning decisions; operational values can be obtained using the calibration procedure in Section 4.1.
Each UAV has a usable battery capacity of Q = 1080  Wh and a mass of 12 kg. Cruise, ascent, descent, and inspection speeds are 15, 3, 2, and 8 m/s, respectively. Cruise and inspection powers are 1000 and 1100 W, respectively, with propulsion efficiency η m = 0.75 and descent energy-reduction factor η r = 0.10 . Obstacle overflight uses a 300 m clearance margin, and station capacities L i range from 2 to 6 UAVs. Station establishment and planning-horizon O&M costs range from CNY 140,000 to CNY 288,000, and the acquisition cost of one UAV is CNY 60,000. The baseline parameters are λ = 0.50 , Γ = 2 , δ e = 0.15 , and δ t = 0.20 . The normalization benchmarks are C ¯ = 10,000,000 CNY and T ¯ = 1000 min in every experiment.
The Kunming baseline, trade-off, and robustness experiments in Section 6.1, Section 6.2 and Section 6.3 used Gurobi 11.0.1 and Python 3.10 on an Intel Core i5-14600K CPU at 3.50 GHz with 32 GB RAM under 64-bit Windows 11. The supplementary validation in Section 7 uses the same hardware with Gurobi 12.0.3 and Python 3.12.7, one solver thread and one pricing worker, under an academic license. Runtime comparisons in that section use this common supplementary environment.
The implementation uses the Gurobi Python interface, gurobipy. Gurobi solves the continuous RMPs, while Python manages the branch tree and the station-specific labeling searches. Route variables are inserted into the retained RMP using gp.Column and Model.addVar; the columns contain the task-coverage, station-balance, robust-time, and active branching coefficients. The constraint attribute Pi supplies the LP dual multipliers used in pricing. Integer solves over generated routes provide incumbent candidates, and the enumerated small instances are submitted directly as mixed-integer models. For the Section 6 implementation, the LP solver is set to dual simplex (Method=1). That implementation uses four parallel pricing workers; the Section 7 comparisons use one worker and Gurobi’s default LP-method selection. The initial route pool combines single-task routes constructed from low-energy access and return paths with greedy multi-task extensions. A column is added when its reduced cost is below − 10 − 6 ; supplementary exact checks use − 10 − 8 . Interface definitions and parameter descriptions are available in the official Gurobi Optimizer Reference Manual (https://docs.gurobi.com/projects/optimizer/en/current/ (accessed on 24 September 2026)).

6.1. Baseline Results

The flight distance, flight time, energy consumption, and uncertainty parameters of each arc are calculated from the network nodes, candidate stations, no-fly zones, and mountain obstacles. The branch-and-price algorithm starts from an initial feasible route subset and generates additional routes dynamically. Table 1 reports the baseline results, and Figure 3 shows the station locations, fleet allocation, and selected inspection routes.
Table 1. Baseline optimization results.
Figure 3. Base-station location, fleet allocation, and inspection-route selection: (a) network-wide station and UAV deployment; (b) routes in a representative local area.
Under the baseline parameters, 46 of the 77 candidate stations are opened, and 75 UAVs are allocated to 75 routes, covering all 94 task arcs. The total deployment cost is CNY 16,166,000. The robust cumulative inspection time is 3259.156 min, consisting of 3250.108 min of nominal cumulative time and 9.049 min of worst-case additional time. The algorithm converges in 22,977.11 s with a final relative optimality gap of 0%, establishing global optimality under the stated stopping tolerance. Dynamic route generation enables the full-scale network to be solved without explicitly enumerating the complete route set.
In Figure 3a, the number beside an opened station is m i and therefore gives both its departing-route count and its arriving-route count. Across the 46 opened stations, ∑ i m i = 75 , matching the 75 selected routes. Each route represents one UAV’s ordered task sequence, with task membership determined by β r p > 0 as described in Section 3.2. Figure 3b illustrates these cross-station route connections in a representative area.

6.2. Trade-Off Between Deployment Cost and Robust Cumulative Inspection Time

The weighting coefficient λ balances deployment cost against robust cumulative inspection time. Smaller values emphasize cumulative operating efficiency, whereas larger values emphasize cost. The model is reoptimized for λ ∈ { 0 , 0.25 , 0.50 , 0.75 , 1 } while all other parameters remain unchanged. At the two endpoints, lexicographic tie-breaking optimizes the inactive criterion after the primary objective, thereby removing cost- or time-indifferent degeneracy. Table 2 and Figure 4 report the results.
Table 2. Trade-off between deployment cost and robust cumulative inspection time.
Figure 4. Trade-off between deployment cost and robust cumulative inspection time for different weighting coefficients.
Under lexicographic tie-breaking, λ = 0 and λ = 0.25 yield the same 49-station, 72-UAV plan, with a robust cumulative inspection time of 3201.214 min and a deployment cost of CNY 16,772,000. At λ = 0.50 , the model opens 46 stations and deploys 75 UAVs, producing the baseline compromise of CNY 16,166,000 and 3259.156 min. Increasing λ to 0.75 and 1 reduces the number of opened stations to 40 and 38, respectively, while increasing robust cumulative inspection time. The cost–time trade-off is therefore realized primarily through changes in infrastructure deployment.

6.3. Sensitivity to Robustness Parameters

The disturbance budget Γ , energy uncertainty ratio δ e , and time uncertainty ratio δ t are varied individually around the baseline setting. The model is reoptimized at each value of Γ and δ e . To isolate the direct effect of time uncertainty, the δ t analysis holds the baseline station configuration, fleet allocation, and routes fixed and reevaluates only the worst-case time term. Table 3 and Figure 5 report the results.
Table 3. Sensitivity to robustness parameters: reoptimization for Γ and δ e , and fixed-baseline evaluation for δ t .
Figure 5. Sensitivity to robustness parameters: (a) disturbance budget Γ ; (b) energy uncertainty ratio δ e ; (c) time uncertainty ratio δ t evaluated on the fixed baseline plan.
The disturbance budget Γ controls the total intensity of adverse disturbances. As Γ increases from 0 to 4, the objective value rises from 2.296 to 2.466, total deployment cost increases from CNY 13,700,000 to CNY 16,714,000, and worst-case additional cumulative time increases from 0 to 17.594 min.
The change from Γ = 2 to Γ = 3 involves station relocation and route consolidation. Twelve stations enter the solution and nine leave, giving a net increase of three; 36 routes are retained, while 39 routes are replaced by 37. Task-arc traversals decrease from 95 to 94 for the same 94 tasks: eliminating one repeated inspection saves 15.28 min. Non-task connection time decreases by a further 8.18 min, accounting together for the 23.46 min reduction in nominal cumulative time. Connection distance falls from 837.07 to 826.84 km. The resulting 73-route configuration preserves task coverage and station-wise takeoff–landing balance. Its average nominal route duration increases from 43.33 to 44.20 min, so the reduction in total time arises from consolidating the work into fewer routes. The additional station cost is CNY 674,000, partly offset by CNY 120,000 saved on two UAVs; the net cost increase outweighs the 19.09 min reduction in robust cumulative time, raising the objective from 2.438 to 2.456.
The energy uncertainty ratio δ e controls the magnitude of energy deviations on affected arcs and primarily changes the robust endurance-feasible route set. As δ e increases from 0.05 to 0.20, total deployment cost rises from CNY 14,170,000 to CNY 16,834,000, the number of opened stations increases from 40 to 49, and fleet size increases from 68 to 75 UAVs. Stronger energy disturbances make some long or energy-intensive routes infeasible, leading the model to open more stations and shorten the service extent of individual routes.
The time uncertainty ratio δ t directly scales the nonnegative flight-time deviations on affected arcs and does not change the robust endurance-feasible route set when the energy parameters remain fixed. For the fixed baseline plan, deployment cost and nominal cumulative inspection time remain CNY 16,166,000 and 3250.108 min, respectively. As δ t increases from 0.10 to 0.25, worst-case additional cumulative time increases from 4.524 to 11.311 min, robust cumulative inspection time increases from 3254.632 to 3261.419 min, and the weighted objective increases from 2.436 to 2.439. This fixed-plan evaluation isolates the direct time effect; reoptimization may additionally alter station and route decisions.
Overall, Γ , δ e , and δ t affect the solution through overall disturbance intensity, endurance safety, and cumulative operating time, respectively. The disturbance budget determines overall conservativeness, energy uncertainty reshapes robust route feasibility and deployment, and time uncertainty increases the worst-case cumulative operating effort of a fixed plan.

7. Discussion and Validation

The Kunming experiments in Section 6 evaluate the baseline plan and its principal robustness parameters. This section complements those results by examining five questions in sequence: whether the solution approach is consistent with direct optimization on smaller networks, whether robustness improves out-of-sample endurance protection, how sensitive local deployment is to spatial and economic inputs, how environmental conditions affect endurance, and how the generated-column structure can support operational replanning after deployment.

7.1. Algorithm Validation and Computational Performance

Five connected nested subnetworks, N 10 ⊂ N 15 ⊂ N 20 ⊂ N 25 ⊂ N 30 , are extracted from the Kunming network and contain 10–30 road nodes. Table 4 summarizes their sizes. All methods use the same local network data, costs, capacities, λ = 0.50 , Γ = 2 , and normalization constants. The comparison considers complete candidate-route enumeration followed by direct MILP optimization, the proposed branch-and-price algorithm (BP), and a heuristic-first variant (H-BP) that applies a short heuristic pricing pass before exact pricing. MILP is run once per instance; BP and H-BP are repeated ten times on N10–N20 and five times on N25–N30. All runs use a 300 s limit, Gurobi 12.0.3, one solver thread, one pricing worker, and the hardware reported in Section 6. Reported wall times include route generation, model construction, pricing, and optimization. Table 5 and Table 6 report the algorithmic results and computational effort, respectively.
Table 4. Nested local test networks.
Table 5. Algorithm comparison results.
Table 6. Computational effort by method.
All three methods reach the same objective with zero reported gap on every tested subnetwork. Candidate enumeration grows from 2634 route variables on N20 to more than 1.4 million on N25, whereas BP uses 433 columns on N25 and 834 on N30. This reduction in explicit model size does not translate into uniformly shorter wall time: MILP is faster on N10–N20 and N30, while BP is faster on N25. H-BP reduces some exact-pricing calls but is slower than BP in the tested instances. The comparison therefore supports the correctness of the generated-column solutions and shows that the computational benefit of dynamic route generation depends on the balance between enumeration cost and repeated pricing.

7.2. Ex-Post Robustness Validation

Algorithmic agreement on smaller networks does not, by itself, quantify the value of robustness. We therefore evaluate the deterministic M1 plan obtained with Γ = 0 and the 75-route robust baseline with Γ = 2 under common out-of-sample arc disturbances. Three sampling laws are used: uniform-volume sampling within { ξ ∈ [ 0 , 1 ] 24 : ∑ a ξ a ≤ 2 } , two affected arcs selected uniformly and set to full deviation, and independent U ( 0 , 1 ) deviations on all 24 affected arcs. The first two remain within the baseline uncertainty budget; the third is an out-of-budget stress test. Each law contains 10,000 independent network scenarios with seed 42, and the same arc-level realization is applied to both plans. A system endurance violation occurs if at least one selected route exceeds 1080 Wh. Uniform-volume samples are generated by drawing D ∼ Dirichlet ( 1 , … , 1 ) and U ∼ U ( 0 , 1 ) , setting ξ = 2 U 1 / 24 D , and rejecting draws with any component above one.
Table 7 shows endurance-violation rates of 40.90% and 24.10% for the deterministic plan under the two within-budget sampling laws, compared with zero observed violations for the robust plan; zero violations in 10,000 scenarios give a one-sided 95% upper confidence limit of 0.03%. The corresponding deployment costs are CNY 13.700 million and CNY 16.166 million, so the tested robust configuration incurs an 18.0% cost premium. These frequencies characterize the specified synthetic distributions rather than empirical field probabilities.
Table 7. Endurance violations under sampled disturbances.
The independent-box test probes disturbances outside the aggregate budget. The robust plan still has no route-level endurance violation because each selected route traverses at most two distinct affected arcs; with Γ = 2 , simultaneous full deviations on those route-level exposures are already covered. Network-wide cumulative time behaves differently because it aggregates disturbances over many arcs: under the independent box, all 10,000 realizations exceed the baseline budgeted time bound of 3259.16 min. This contrast distinguishes route-level endurance protection from the network-wide cumulative-time budget.

7.3. Spatial and Economic Sensitivity

The ex-post simulation evaluates disturbance realizations for fixed inputs. To examine input misspecification, we next perturb no-fly-zone geometry and infrastructure parameters in representative western (W15) and eastern (E20) subnetworks. For the target no-fly zone in each region, the radius is multiplied by 0.80 or 1.20, and the center is shifted east, west, north, or south by one quarter of its baseline radius. Road endpoints, candidate stations, tasks, terrain peaks, normalization constants, and non-varied parameters remain fixed. Each geometric perturbation is reprocessed to update affected arcs, detour distance, flight attributes, and feasible routes before solving the complete local MILP. Table 8 summarizes the resulting deployment changes, while Table 9 reports the corresponding geometric mechanisms.
Table 8. Local spatial and economic sensitivity.
Table 9. No-fly-zone geometry effects.
The two regions respond differently to the same relative geometric perturbations. In W15, increasing the radius by 20% raises the affected-arc count from 4 to 16, reduces the complete admissible-route count from 1942 to 1215, and increases the fleet from 8 to 10 UAVs. In E20, the six geometric perturbations retain the seven-station, twelve-UAV configuration, although the objective changes slightly. These results indicate that the operational effect of no-fly-zone geometry depends on its interaction with local network connectivity rather than on radius or displacement alone.
Economic sensitivity is evaluated by changing all station costs and the UAV unit cost by ± 10 % , and by replacing each station capacity with max ( 1 , L i − 1 ) or L i + 1 . In addition, 50 independent station-specific cost vectors are sampled for each region using f i ′ = f i ( 1 + ϵ i ) with ϵ i ∼ U [ − 0.10 , 0.10 ] . Table 10 summarizes these draws. Fleet size remains unchanged in all 50 draws, while the exact station set is retained in 84% of W15 draws and 44% of E20 draws. The tested cost uncertainty therefore affects detailed station choice more readily than aggregate fleet size in these two local networks.
Table 10. Station-cost perturbation results.

7.4. Environmental Conditions and Fleet Assumptions

The preceding sensitivity tests retain the baseline aircraft model. To examine operating conditions that directly affect endurance, we next introduce wind-dependent energy corrections and temperature-dependent usable capacity. The main model continues to represent a standardized homogeneous fleet with common usable capacity Q; in practice, this assumption requires every assigned aircraft to meet the modeled capacity under the relevant conditions. If battery-health differences are material, the same station–fleet–route structure can be extended either by adopting a verified common lower capacity or by grouping aircraft into classes with class-specific capacities, route sets, fleet counts, and station-balance constraints.
For a wind vector w , the steady-flight power response of Dai et al. [27] is evaluated using air-relative velocity v − w and normalized by calm-flight power. Phase-specific power ratios are combined using the cruise/inspection, ascent, and descent energy shares of each arc to obtain r a ( w ) , giving
E a ( w ) = r a ( w ) E a , E ^ a ( w ) = r a ( w ) E ^ a .
Ground speeds remain fixed at the baseline values. The scenario set contains calm conditions, eight compass directions at 5 m/s, and four cardinal directions at 8 m/s, for 13 horizontal wind vectors in total.
Temperature affects the usable energy budget. Based on the 1C discharge data of Liu et al. [28], relative usable energy is approximated by
κ ( T amb ) = t cut ( T amb ) V 50 ( T amb ) t cut ( 20 ) V 50 ( 20 ) , Q eff ( T amb ) = κ ( T amb ) Q ref .
This gives scenario capacities of 1080, 953.73, and 827.46 Wh at 20, 10, and 0 °C, respectively. They are reference-cell-scaled values used for sensitivity analysis, not measured capacities of the inspection UAV battery.
Combining these conditions with the original detour set gives U ext = U × W × T . A route is retained only if
∑ a β a p E a ( w ) + max ξ ∈ U ∑ a ∈ A u β a p E ^ a ( w ) ξ a ≤ Q eff ( T amb ) , ∀ w ∈ W , T amb ∈ T .
The full-network baseline is first screened without reoptimization under all 39 wind–temperature combinations. None of its 75 routes fail the energy screen at 20 °C; 6–9 routes fail at 10 °C and 33–37 at 0 °C, depending on wind direction and speed. Table 11 then reoptimizes the two local networks while enforcing all 13 wind vectors simultaneously. W15 remains feasible at all three temperatures by increasing fleet size and, at 0 °C, opening one additional station. E20 remains feasible at 10 °C but becomes infeasible at 0 °C because three tasks have no admissible route. The stress tests therefore show both the capacity for local adaptation and an operating boundary beyond which the fixed candidate network cannot maintain complete service.
Table 11. Local wind–temperature reoptimization.

7.5. Operational Replanning Under Local Disturbances

The analyses above concern the quality and robustness of the offline planning layer. After stations and fleet allocations have been established, short-notice disturbances call for a narrower operational problem: retain the infrastructure and available fleet, update affected arc attributes and remaining tasks, and reoptimize route assignments. Previously generated BP columns provide a natural warm start for this route-level replanning.
We test this mechanism on E20 and its nested 25-node extension E25. In each pre-event BP solution, the affected arc with the largest aggregate traversal count is assigned a 10% increase in nominal time, nominal energy, and both deviation amplitudes. Established stations and station-wise fleet counts are fixed. Cold-BP restarts from the initial-route generator, whereas Warm-BP revalidates the columns generated before the event, removes any newly infeasible columns, and resumes column generation and branching with exact pricing. Twenty repetitions per method are reported in Table 12; pre-event optimization is excluded from the online timing.
Table 12. Pre-departure replanning performance.
Cold-BP and Warm-BP reach the same certified local optimum in both regions. Warm-BP reduces median solution time from 92.50 to 42.87 ms in E20 and from 175.95 to 33.61 ms in E25 by reusing previously generated columns and requiring few or no new columns (Table 13). These results support column reuse for local pre-departure operational replanning under fixed infrastructure; they do not imply that the full offline station–fleet design can be reoptimized on the same time scale.
Table 13. Column reuse in operational replanning.
If UAVs are already airborne, operational replanning would additionally require current positions, remaining battery energy, station inventory, and admissible recovery stations. Those state variables define a different residual problem and are left for future development.

8. Conclusions

This study develops an offline robust planning approach for UAV inspection of mountainous expressway networks with continuously distributed tasks, multi-station coordination, and uncertainty in flight time and energy consumption induced by no-fly-zone detours. The approach jointly determines base-station locations, fleet allocation, and route selection while enforcing task coverage, station capacity, individual-UAV endurance, and cyclic takeoff–landing balance. A budgeted uncertainty set and dual reformulation yield a linear robust model, and a branch-and-price algorithm dynamically generates robustly feasible routes on the physical network.
The Kunming case study shows how deployment cost and cumulative inspection time change with the weighting coefficient and robustness parameters. Under the baseline setting, the reported solution opens 46 of 77 candidate stations, deploys 75 UAVs, covers all 94 task arcs, and yields a robust cumulative inspection time of 3259.156 min. The sensitivity results indicate that the disturbance budget and energy uncertainty can alter deployment and route feasibility, whereas the direct effect of time uncertainty is reflected in the worst-case cumulative time of a fixed plan.
Supplementary validation extends these findings without changing the offline planning model. Direct MILP, BP, and H-BP obtain the same objectives on the tested local networks, while dynamic route generation substantially reduces the number of explicit route variables at the larger local scales. In two within-budget Monte Carlo tests, the robust baseline has no observed endurance violations in 10,000 scenarios, compared with violation rates of 40.90% and 24.10% for the deterministic plan, while incurring an 18.0% higher deployment cost. Spatial and economic perturbations show that local station choice can be more sensitive than aggregate fleet size, and wind–temperature stress tests identify conditions under which additional deployment can preserve feasibility and conditions under which the fixed candidate network is insufficient. Finally, warm-started column reuse reduces solution time in the tested local operational-replanning problems while retaining the same certified objective as a cold start.
Future work may use flight logs, meteorological observations, mountainous wind-field data, and low-altitude airspace-control information to calibrate time and energy uncertainty more precisely. Further extensions could incorporate heterogeneous UAV fleets, charging and battery-swapping schedules, differences in station capabilities, task priorities, and richer rolling-horizon models for UAVs already in flight.

Author Contributions

Conceptualization, J.W. and L.K.; methodology, J.W., L.Z. and L.K.; software, L.Z.; validation, J.W., L.Z. and J.L.; formal analysis, J.W. and L.Z.; investigation, J.W., J.L. and X.F.; resources, J.W. and X.F.; data curation, L.Z. and J.L.; writing—original draft preparation, J.W. and L.Z.; writing—review and editing, J.L., X.F. and L.K.; visualization, L.Z.; supervision, L.K.; project administration, J.W. and X.F.; funding acquisition, J.W., X.F. and L.K. All authors have read and agreed to the published version of the manuscript.

Funding

This research was funded by the Science and Technology Innovation Projects of Yunnan Transportation Research Institute Co., Ltd. (grant numbers JKYZLX-2025-07 and JKYZLX-2025-06) and the National Natural Science Foundation of China (grant number 72542015).

Institutional Review Board Statement

Not applicable.

Data Availability Statement

Data will be made available upon request.

Acknowledgments

During the preparation of this manuscript, the authors used ChatGPT (GPT-5.6, OpenAI, San Francisco, CA, USA) to assist with Chinese-to-English translation, language editing, and LaTeX formatting. The authors reviewed and edited the output and take full responsibility for the content of this publication.

Conflicts of Interest

Juntao Wang, Jingyang Liu, and Xunwei Feng were employed by the company Yunnan Transportation Research Institute Co., Ltd. The remaining authors declare that the research was conducted in the absence of any commercial or financial relationships that could be construed as a potential conflict of interest.

Appendix A. Notation

Table A1 summarizes the mathematical models. Table A2 provides the flight-attribute and pricing notation. Arc and route times are converted to minutes for optimization and reporting, while energies remain in watt-hours. The energy-dual variables α p and φ a p have units of energy; θ and s a have units of time. RMP multipliers are associated with the normalized master objective.
Table A1. Notation used in the mathematical models.
Table A2. Additional flight-attribute and algorithm notation.

References

  1. Li, C.; Qu, W.; Li, Y.; Huang, L.; Wei, P. Overview of traffic management of urban air mobility (UAM) with eVTOL aircraft. J. Traffic Transp. Eng. 2020, 20, 35–54. (In Chinese) [Google Scholar] [CrossRef]
  2. Liao, X.; Xu, C.; Ye, H. Benefits and challenges of constructing low-altitude air route network infrastructure for developing low-altitude economy. Bull. Chin. Acad. Sci. 2024, 39, 1966–1981. (In Chinese) [Google Scholar] [CrossRef]
  3. Liu, H.; Ma, R. Sky’s-Eye Perspective: A Multidimensional Review of UAV Applications in Highway Systems. Appl. Sci. 2025, 15, 11199. [Google Scholar] [CrossRef] [Scilit]
  4. Corberán, Á.; Eglese, R.W.; Hasle, G.; Plana, I.; Sanchis, J.M. Arc routing problems: A review of the past, present, and future. Networks 2021, 77, 88–115. [Google Scholar] [CrossRef] [Scilit]
  5. Campbell, J.F.; Corberán, Á.; Plana, I.; Sanchis, J.M. Drone arc routing problems. Networks 2018, 72, 543–559. [Google Scholar] [CrossRef] [Scilit]
  6. Macrina, G.; Di Puglia Pugliese, L.; Guerriero, F.; Laporte, G. Drone-aided routing: A literature review. Transp. Res. Part C Emerg. Technol. 2020, 120, 102762. [Google Scholar] [CrossRef] [Scilit]
  7. Wang, Z.; Sheu, J.B. Vehicle routing problem with drones. Transp. Res. Part B Methodol. 2019, 122, 350–364. [Google Scholar] [CrossRef] [Scilit]
  8. Xiang, R.; Zhu, M.; Xu, L. Multi-UAV task planning method for expressway patrol. Radio Eng. 2022, 52, 1222–1230. (In Chinese) [Google Scholar]
  9. Wang, H.; Yao, W.; Wang, A.; Han, H.; Yang, Y.; Ye, L.; Wu, P. Multi-UAV collaborative path planning for expressway inspection. Transp. Res. 2025, 11, 191–202. (In Chinese) [Google Scholar] [CrossRef]
  10. Yan, R.; Chen, L.; Zhu, X.; Tian, H.; Wen, Y.; Zhang, Q. Research on vehicle routing problem with truck and drone considering regional restriction. Chin. J. Manag. Sci. 2022, 30, 144–155. (In Chinese) [Google Scholar] [CrossRef]
  11. Zhang, S.; Liu, S.; Zhang, W. Vehicle routing problems with time windows under the collaborative delivery mode of electric vehicle–drone. Chin. J. Manag. Sci. 2025, 33, 131–141. (In Chinese) [Google Scholar] [CrossRef]
  12. Dai, Y.; Huang, Z.; Gao, C.; Wang, M. A UAV nest deployment method with multi-target optimization and minimum cost. J. Chongqing Univ. 2023, 46, 136–144. (In Chinese) [Google Scholar] [CrossRef]
  13. Qiu, J.; Wang, Z.; Jia, J.; Yu, P.; Liu, X.; Zheng, S.; Zhu, Z.; Yuan, Z. Optimization of multi-UAV task allocation based on heterogeneous multi-drone intelligent nest. J. Nanchang Hangkong Univ. (Nat. Sci.) 2024, 38, 74–84. (In Chinese) [Google Scholar] [CrossRef]
  14. Gao, F.; Yu, B. Reliability-oriented unmanned aerial vehicle nest location optimization method for smart city management inspection. J. Traffic Transp. Eng. 2026, 26, 276–290. (In Chinese) [Google Scholar] [CrossRef]
  15. Tang, Z.; Qin, J.; Sun, J. Robust optimization for railway emergency location-routing based on non-probabilistic reliability. Chin. J. Manag. Sci. 2022, 30, 206–216. (In Chinese) [Google Scholar] [CrossRef]
  16. Sun, H.; Xiang, M. Robust optimization for emergency location-routing problem with uncertain demand under facility failure risk. Chin. J. Manag. Sci. 2020, 28, 199–207. (In Chinese) [Google Scholar] [CrossRef]
  17. Peng, C.; Li, J.; Wang, S.; Ran, L. Multiple relief resources robust location-routing optimization. Chin. J. Manag. Sci. 2017, 25, 143–150. (In Chinese) [Google Scholar] [CrossRef]
  18. Bruni, M.E.; Khodaparasti, S.; Perboli, G. The drone latency location routing problem under uncertainty. Transp. Res. Part C Emerg. Technol. 2023, 156, 104322. [Google Scholar] [CrossRef] [Scilit]
  19. He, Y.; Zheng, Z.; Li, H.; Deng, J. A stochastic drone-scheduling problem with uncertain energy consumption. Drones 2024, 8, 430. [Google Scholar] [CrossRef] [Scilit]
  20. Kang, L.; Zhou, L.; Mao, X.; Cao, S.; Sun, H. Major engineering material distribution route planning based on end-to-end predict-then-optimize approach. J. Syst. Manag. 2026, 35, 951–960. (In Chinese). Available online: https://xtglxb.sjtu.edu.cn/EN/abstract/abstract2114.shtml (accessed on 24 September 2026).
  21. Cheng, C.; Adulyasak, Y.; Rousseau, L.M. Drone routing with energy function: Formulation and exact algorithm. Transp. Res. Part B Methodol. 2020, 139, 364–387. [Google Scholar] [CrossRef] [Scilit]
  22. Bertsimas, D.; Sim, M. The price of robustness. Oper. Res. 2004, 52, 35–53. [Google Scholar] [CrossRef] [Scilit]
  23. Lian, X.; Wang, W.; Miao, M. A two-stage distributionally robust optimization framework for UAV-based dynamic inspection with joint deployment and routing. Appl. Sci. 2026, 16, 3207. [Google Scholar] [CrossRef] [Scilit]
  24. Li, H.; Zhan, Z.; Wang, Z. Energy-consumption model for rotary-wing drones. J. Field Robot. 2024, 41, 1940–1959. [Google Scholar] [CrossRef] [Scilit]
  25. Barnhart, C.; Johnson, E.L.; Nemhauser, G.L.; Savelsbergh, M.W.P.; Vance, P.H. Branch-and-price: Column generation for solving huge integer programs. Oper. Res. 1998, 46, 316–329. [Google Scholar] [CrossRef] [Scilit]
  26. Feillet, D.; Dejax, P.; Gendreau, M.; Gueguen, C. An exact algorithm for the elementary shortest path problem with resource constraints: Application to some vehicle routing problems. Networks 2004, 44, 216–229. [Google Scholar] [CrossRef] [Scilit]
  27. Dai, X.; Duo, B.; Yuan, X.; Di Renzo, M. Energy-Efficient UAV Communications in the Presence of Wind: 3D Modeling and Trajectory Design. IEEE Trans. Wirel. Commun. 2024, 23, 1840–1854. [Google Scholar] [CrossRef] [Scilit]
  28. Liu, Y.; Liao, Y.G.; Lai, M.C. Lithium-Ion Polymer Battery for 12-Voltage Applications: Experiment, Modelling, and Validation. Energies 2020, 13, 638. [Google Scholar] [CrossRef] [Scilit]
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content.

Article Metrics

Citations

Article Access Statistics

Multiple requests from the same IP address are counted as one view.