Skip to Content
Journal: Applied SciencesVolume: 15Number: 9616
Article: Feasibility and Optimization Study on the Replacement of Core Rock Columns with Temporary Steel Supports in the Construction of Large-Section Subway Tunnels in Interbedded Rock Masses
  • Authors:
  • Dunwen Liu,
  • Yupeng Zhang and
  • Yuhui Jin *
  • et al.
Link: https://www.mdpi.com/2076-3417/15/17/9616

MDPI offers high quality article reprints with convenient shipping to destinations worldwide. Each reprint features a 270 gsm bright white cover and 105 gsm premium white paper, bound with two stitches for durability and printed in full color. The cover design is customized to your article and designed to be complimentary to the journal.

Order Cost and Details

Production Quality: High quality (printed in full color on glossy, 135g/m2 paper and 2x stitched)

Order Type

Shipping Address

Billing Address

0 / 500
The order must be prepaid after it is placed.