Saravana, A.; Keane, T.; Thorpe, T.; Chaaya, M.; Tahmasebinia, F.; Sepasgozar, S.M.E.
Identifying Early-Stage Risks to High-Speed Rail: A Case Study of the Sydney–Newcastle Corridor, Australia. Appl. Sci. 2025, 15, 6077.
https://doi.org/10.3390/app15116077
AMA Style
Saravana A, Keane T, Thorpe T, Chaaya M, Tahmasebinia F, Sepasgozar SME.
Identifying Early-Stage Risks to High-Speed Rail: A Case Study of the Sydney–Newcastle Corridor, Australia. Applied Sciences. 2025; 15(11):6077.
https://doi.org/10.3390/app15116077
Chicago/Turabian Style
Saravana, Anjuhan, Tom Keane, Thomas Thorpe, Michel Chaaya, Faham Tahmasebinia, and Samad M. E. Sepasgozar.
2025. "Identifying Early-Stage Risks to High-Speed Rail: A Case Study of the Sydney–Newcastle Corridor, Australia" Applied Sciences 15, no. 11: 6077.
https://doi.org/10.3390/app15116077
APA Style
Saravana, A., Keane, T., Thorpe, T., Chaaya, M., Tahmasebinia, F., & Sepasgozar, S. M. E.
(2025). Identifying Early-Stage Risks to High-Speed Rail: A Case Study of the Sydney–Newcastle Corridor, Australia. Applied Sciences, 15(11), 6077.
https://doi.org/10.3390/app15116077