Next Article in Journal
Time-Aware Construction Site Risk Prediction Based on Sentence-BERT and 7-Day Window Aggregation with Unlabeled Data
Previous Article in Journal
Research on Contractor Selection for Grey Plaster Decoration Engineering of Cultural Relic Buildings Based on the BWM-TODIM Method
 
 
Article

Article Versions Notes

Buildings 2026, 16(6), 1242; https://doi.org/10.3390/buildings16061242
Action Date Notes Link
article html file updated 21 March 2026 05:49 CET Original file https://www.mdpi.com/2075-5309/16/6/1242/html
article pdf uploaded. 21 March 2026 05:47 CET Version of Record https://www.mdpi.com/2075-5309/16/6/1242/pdf
article xml uploaded. 21 March 2026 05:47 CET Update https://www.mdpi.com/2075-5309/16/6/1242/xml
article xml file uploaded 21 March 2026 05:47 CET Original file -
Back to TopTop