Chang, W.; Li, X.; Song, X.; Zhang, R.; Li, Y.; Yin, Y.
Solving the Two-Stage Design Interest Paradox Between Chinese EPC Project Owners and General Contractors: A Case Study. Buildings 2025, 15, 3162.
https://doi.org/10.3390/buildings15173162
AMA Style
Chang W, Li X, Song X, Zhang R, Li Y, Yin Y.
Solving the Two-Stage Design Interest Paradox Between Chinese EPC Project Owners and General Contractors: A Case Study. Buildings. 2025; 15(17):3162.
https://doi.org/10.3390/buildings15173162
Chicago/Turabian Style
Chang, Weiling, Xiaolin Li, Xiujuan Song, Ruirui Zhang, Yinan Li, and Yilin Yin.
2025. "Solving the Two-Stage Design Interest Paradox Between Chinese EPC Project Owners and General Contractors: A Case Study" Buildings 15, no. 17: 3162.
https://doi.org/10.3390/buildings15173162
APA Style
Chang, W., Li, X., Song, X., Zhang, R., Li, Y., & Yin, Y.
(2025). Solving the Two-Stage Design Interest Paradox Between Chinese EPC Project Owners and General Contractors: A Case Study. Buildings, 15(17), 3162.
https://doi.org/10.3390/buildings15173162