Next Article in Journal
Performance Evaluation of Soybean Oil/SBR Reclaimed Asphalt and Mixtures
Next Article in Special Issue
Blockchain Technology Adoption by Critical Stakeholders in Prefabricated Construction Supply Chain Based on Evolutionary Game and System Dynamics
Previous Article in Journal
Big Data Value Proposition in UK Facilities Management: A Structural Equation Modelling Approach
Previous Article in Special Issue
Applying Building Information Modelling (BIM) Technology in Pre-Tender Cost Estimation of Construction Projects: A Case Study in Iran
 
 
Article

Article Versions Notes

Buildings 2024, 14(7), 2084; https://doi.org/10.3390/buildings14072084
Action Date Notes Link
article xml file uploaded 8 July 2024 08:55 CEST Original file -
article xml uploaded. 8 July 2024 08:55 CEST Update https://www.mdpi.com/2075-5309/14/7/2084/xml
article pdf uploaded. 8 July 2024 08:55 CEST Version of Record https://www.mdpi.com/2075-5309/14/7/2084/pdf
article html file updated 8 July 2024 08:57 CEST Original file -
article html file updated 26 June 2025 08:08 CEST Update https://www.mdpi.com/2075-5309/14/7/2084/html
Back to TopTop