Abstract
Suction anchors play an important role in the exploration and development of marine natural gas hydrate (NGH). Suction anchors increase the bearing capacity and reduce tilting or sinking risk of underwater wellheads in the exploration and development process. This study proposes a dynamic failure analysis procedure for suction anchor installation based on the DBN-GO method. Firstly, a Goal-Oriented (GO) model is established by analyzing the human and equipment factor nodes in the suction anchor installation operation process. A Bayesian Network (BN) analysis model is set up by mapping the key nodes in the GO model. Then, the Cognitive Reliability and Error Analysis Method (CREAM) and the Dempster–Shafer (D-S) evidence theory are used to quantify the failure probabilities of human and equipment factor nodes in the BN model. The main risk factors are identified using Bayesian backward inference. Finally, the dynamic risk assessment of the suction anchor installation operation is conducted, considering the equipment node transition probability of the BN. Tkae the second production test of natural gas hydrates in the South China Sea as a case study. The study result shows that the failure probability of the suction anchor installation operation is 0.298%, which is at a low-risk level. Suction pump pressure control is the most critical factor leading to human errors. Among the equipment factor, the reliability of the suction pump and the ROV is the most important. Dynamic Bayesian inference shows the risk gradually increases with time. A reasonable maintenance strategy is conducive to reducing the accumulated risks caused by the time-varying degradation of equipment performance. The results could provide significant support in risk management and decision-making for the suction anchor installation operation, which will further promote the environmental sustainability, operational safety and economic feasibility of marine natural gas hydrate development.
1. Introduction
Natural gas hydrate (NGH) is a mixture of methane and water formed under low-temperature and high-pressure environmental conditions. Owing to its high energy density and abundant global reserves, NGH is widely recognized as a promising energy resource. Its combustion products are mainly carbon dioxide and water, which are generally considered to have limited adverse environmental impacts compared with conventional fossil fuels [1]. Consequently, NGH has attracted sustained attention as a potential alternative to traditional resources. NGH has vital impacts in terms of energy security, environmental protection, and climate change mitigation. The sustainable utilization of NGH is beneficial to optimize the energy structure and improve energy supply security. However, structural failure or installation accident could lead to severe economic losses and environmental disasters in offshore engineering. Consequently, ensuring the operation integrity of key equipment, such as suction anchor, is not only an engineering challenge but a critical prerequisite for establishing a sustainable, environment-friendly energy supply chain. In recent decades, NGH prospecting and test mining have been conducted in the United States, Japan, Canada, and other countries [2]. In China, NGH was officially recognized as the 173rd mineral species following the successful completion of the first NGH test mining in 2017 [3]. In February 2020, China further achieved horizontal well drilling in deepwater, shallow, and soft formation [4]. Recent academic focus has centered on marine natural gas hydrate exploitation and dynamic risk assessment mechanisms. Numerous studies have introduced novel development techniques for hydrate resources [5,6,7]. Despite these advances, the hydrate test mining wellhead remains susceptible to tilting and sinking accidents because of its distribution in deepwater areas with shallow buried depth. During second hydrate test mining, suction anchor technology was used to improve wellhead stability. As shown in Figure 1, suction anchor is a barrel-shaped foundation construction with a top-closed and bottom-open configuration [8]. By enlarging the horizontal contact area between the wellhead system and the shallow formation, suction anchors can enhance the stability of the hydrate test mining wellhead and mitigate the possibility of tilting or sinking during operations [9]. In addition, suction anchors are convenient to deploy and recyclable, indicating strong application prospects for deepwater NGH development [10]. Suction anchor-wellhead structure relies on the large vertical and flexural load capacities of the suction anchor foundation, which can effectively ensure wellhead stability and drilling safety. In recent years, wellhead suction anchor technology has been rapidly proposed and improved [11]. However, its development history remains relatively short, and engineering practice cases are still limited. Therefore, integrated risk analysis and control studies are needed to support the operation safety of suction anchors in the deepwater NGH development.
Figure 1.
Suction anchor in marine natural gas hydrate development.
The development of suction anchor technology can be traced back to early conceptual work in the 1960s [12], followed by the first official application reported by Single Buoy Mooring Inc. in 1980 [13]. With continued research progress, the technology advanced rapidly. In 2011, Neodrill AS and Det Norske Oljeselskap ASA developed a new high-load capacity well construction equipment, namely the Conductor Anchor Node (CAN) [14]. This new suction anchor aimed to provide sufficient and safe bearing capacity while mitigating risks associated with undesired accidental loads that could overload the well. Because suction anchor operations are strongly influenced by complex marine environmental conditions, research on suction anchor installation dynamics is essential. Existing studies have primarily focused on splash-zone effects on the motion state of suction anchors, whereas investigations covering the full installation dynamics process remain limited. Naess [15] simulated the dynamic installation process using ANSYS to examine dynamic loads during suction anchor deployment. Ha [16] investigated stress distributions of floating cranes and tension variations in lifting wire ropes under different wave and mating conditions through experimental and numerical analyses. Wang et al. [17] conducted a kinetic analysis of drill pipe installation for subsea manifolds, addressing different installation phases of subsea clusters and showing that the drill pipe Mises stress and the subsea manifold displacement are significantly affected by the marine environment—findings that are valuable for deepwater installation practice.
Offshore oil and gas operations are typically accompanied by risk identification and management activities. Nevertheless, quantitative risk analyses specifically targeting suction anchor installation operations remain scarce, and further research is required to evaluate and control operational risks in this context. Simultaneously, advanced methodologies, such as Dynamic Bayesian Networks (DBNs), CREAM, and the GO method, have become the mainstream of recent studies on uncertainty and risk evolution in complex systems [18,19,20]. The GO method is a reliability analysis technique suitable for the safety analysis of multi-state and time-series systems. The Kaman Corporation proposed the GO method in 1976 [21], and early applications included safety and dependability analyses of weapon and missile systems [22]. Building on the GO method, Matsuok and Kobayashi [23] developed the Goal Oriented Flow methodology and applied it to phased mission problems, such as time-dependent failure probability analyses for reactor auxiliary feedwater systems. The GO method was introduced in China in the late 1990s [24]. More recently, the GO method has often been combined with other techniques for process analysis. For instance, Nie et al. employed the Dynamic Bayesian Network-Goal Oriented (DBN-GO) technique to compute failure probabilities and identify important risk factors of the Riser Emergency Disconnect (RED) operation under various working conditions [25].
However, the GO method alone has limitations in representing uncertain systems, whereas the Bayesian Network (BN) provides strong inference capability for uncertainty treatment. Khakzad et al. combined fault trees and event trees to build the Bow-Tie approach for the quantitative risk assessment of deepwater drilling and well control processes, and further used a Dynamic Bayesian Network (DBN) to update failure probabilities during drilling operations [26]. Li et al. employed BN to reduce model uncertainty and proposed a dynamic model for assessing third-party damage risk to subsea pipelines [27]. As a time-series extension of BN, DBN enables the modeling of dynamic system behavior. Li et al. established accident scenarios using DBN by identifying fatigue failure causes and consequences, and then calculated time-varying fatigue failure likelihoods by estimating underlying-cause probabilities using fuzzy sets and evidence theory [28].
In practice, suction anchor installation operations still lack abundant successful cases, and the reliability of related equipment is often difficult to determine. Offshore Reliability Data (OREDA) provides reliability and maintenance information for exploration and production equipment across different regions, installations, equipment types, and operating conditions [29]. Nevertheless, the failure likelihood of operational equipment remains uncertain due to variations in the operating conditions and environmental factors. To address the uncertainty induced by randomness and ambiguity, the Dempster–Shafer theory provides an effective framework. Mahmoudi [30] proposed a Safety Integrity Level (SIL) analysis method based on a standard OREDA database, and Liu et al. [31] developed a lightning failure risk assessment approach for overhead transmission lines using the Dempster–Shafer theory.
Moreover, suction anchor installation operations are influenced by human factors. The Cognitive Reliability and Error Analysis Method (CREAM) is a widely used approach for human factor reliability assessment. Jie et al. [32] assessed risks in deepwater well control operations using a BN-CREAM approach and predicted human operational error likelihood via CREAM. For tanker shipping, Zhou et al. [33] developed a quantitative Human Reliability Analysis (HRA) model by integrating fuzzy logic theory, BN, and CREAM.
Motivated by the above gaps, this paper systematically conducts dynamic failure analysis for deepwater NGH suction anchor installation operation. In the study, failure is defined as the interruption or incompletion of the installation operation process. Human error or equipment failure in the installation process is considered in our study. However, structural inherent damage before installation and stability failure after installation are not considered. Based on the suction anchor installation operations process, the GO method and Bayesian network are integrated to establish a suction anchor installation operation process. The Bayesian network model explicitly considers human error and equipment failure factors, thereby enabling quantitative failure risk analysis.
The novelty of this study is the formation of dynamic failure analysis for the suction anchor installation process based on the DBN-GO method. The main contributions are summarized as follows.
- A risk analysis framework for deepwater NGH suction anchor installation operations is established by integrating the GO method and Bayesian network model for the suction anchor installation operation process.
- Uncertainties in human and equipment factor nodes are incorporated through CREAM and Dempster–Shafer theory, enhancing the practicality of failure probability assessment under limited data conditions.
- A DBN-based prediction scheme is developed to characterize the time-dependent failure possibility of suction anchor installation operations and to identify key risk factors by Bayesian backward inference.
The remainder of this paper is organized as follows. Section 2 describes the suction anchor installation process. Section 3 forms the integrated procedure of dynamic failure analysis for the suction anchor installation process. In Section 4, a case study is conducted, and the failure possibility of human and equipment factor nodes is determined. Then, the failure probability analysis and weak nodes identification are accomplished in Section 5. Finally, Section 6 provides the summary and conclusions.
2. Background
NGH reserves in the South China Sea are abundant. The exploration results indicate that the total resource potential has reached 70 billion tons of oil equivalent, suggesting broad prospects for future development [34]. However, most NGHs are located in deepwater environments with shallow buried depth [35,36]. The length of the wellbore structure is relatively short, and long-term seawater erosion weakens the shallow formation. As a result, the bearing capacity provided by shallow soils is limited, which makes the underwater wellhead prone to tilting or sinking in the test process. In the second China hydrate test mining, the suction anchor technology is adopted to improve wellhead stability.
Nevertheless, the marine environment is complex and uncertain. When severe deepwater conditions are combined with potential human errors and equipment malfunctions, the failure probability of the suction anchor installation process can increase obviously. Therefore, to improve the success probability in engineering practice and to provide theoretical support for deepwater drilling using the suction anchor, it is necessary to conduct a specific safety assessment of the suction anchor installation operation process.
The installation of suction anchor typically requires coordination between large engineering vessels and a Remote Operated Vehicle (ROV). After the engineering vessel arrives at the marine location, the suction anchor is assembled and lowered.
Firstly, the suction anchor on board is lifted by a crane, and the drainage hole at the top of the anchor is opened to prevent air entrapment and splashing during lowering. Subsequently, the suction anchor is released by controlling the winch speed. After passing the splash zone, it is lowered into the seawater at a uniform speed. When the suction anchor reaches the seabed, it penetrates into the mud under self-weight to a certain depth. Then, an ROV is then deployed to connect the suction pump to the drain valve at the top of the suction anchor. Once the suction pump is activated, seawater inside the suction anchor is pumped out, creating a differential pressure between the inside and outside of the suction anchor. This pressure difference continuously drives the suction anchor into the seabed until the predetermined penetration depth is achieved. Finally, the top drain valve is closed, and penetration equipment as well as auxiliary equipment (e.g., slings) are retrieved [37].
In this study, the suction anchor installation operations process is divided into three stages: lifting stage from the vessel, lowering stage in the sea, and penetration stage in the formation. A schematic diagram of the installation operation is shown in Figure 2, and the corresponding refined installation operation flow chart is further established based on the above process analysis, as shown in Figure 3.
Figure 2.
Schematic diagram of suction anchor installation operation.
Figure 3.
Flow chart of suction anchor installation operation.
3. Theory of Risk Analysis
3.1. GO Method
The GO method is a systematic probability analysis method guided by the success of an event. Converting the operation system schematic diagram or process flow diagram into a GO diagram consisting of operators and signal flow according to specific rules, the success probability analysis of system operation is completed using the operation rules of operators.
The GO method model consists of two parts: operators which represent system components or logical relationships, and signal flows which represent system analytical processes [38]. Operators are divided into logical operators and functional operators, consisting of 17 types. The logical operators define computational logic but do not have a state of their own, whereas the functional operators contain computation logic and function conditions.
Part of the operators is shown in Figure 4. All operators consider both success and failure states, where S is the input signal and R is the output signal.
Figure 4.
Operators of a typical GO model. (a) Type-1 operator; (b) Type-5 operator; (c) Type-6 operator; (d) Type-10 operator.
3.2. Dynamic Bayesian Network
BN is a processing model made up of nodes, arcs, and condition probability tables that can simulate the uncertainty of causation in the inference process [39]. Random variables are represented by nodes, conditional relationships between nodes are represented by arcs, and the logical progression from child nodes to parent nodes is defined by condition probabilities.
Using condition independence and chain rules, the joint probability distribution of variables can be expressed as follows:
where is the node, is the parent of node and is the conditional probability of node [40].
However, BN does not take the time factor into account and cannot analyze the dynamic characteristic of the system. Thus, DBN is used for the analysis. Ordinary BN in the time series is extended by DBN [41]; it adds constraints on time properties. The following assumptions are established to simplify complex systems: (1) The grid structure is time independent, and the conditional probabilities are consistent for time (t). (2) The dynamic process conforms to the Hidden Markov Model (HMM).
A DBN can be defined as a set, , where denotes the prior network in the initial state, and the prior probability of each node is represented as ; denotes a network of adjacent time-shifted relationships [42].
The general structure of the Dynamic Bayesian Networks is shown in Figure 5. When considering the dynamics of two-slice Temporal Bayes Net (2TBN), the joint distribution probability of the nodes is as follows:
where is the ith node at time t, is the parent of , and N is the number of variables.
Figure 5.
General structure of the Dynamic Bayesian Networks. (a) Initial Network ; (b) Transfer Network ; (c) Expansion of Bayesian networks on the time series.
3.3. D-S Evidence Theory
The Dempster–Shafer evidence theory is an approach based on evidence and combination, which is capable of solving uncertainty reasoning problems.
- (1)
- Basic probability allocation
The discernment framework is considered a non-null set, which contains n mutually exclusive and independent events such that . The discernment framework has subsets. The Basic Probability Assignment (BPA) is the mapping function m of subsets in the interval [0, 1], also known as the mass function [43]. The mass function satisfies the following:
- (2)
- Belief function
The belief function represents the total belief level and can be defined as follows:
where is the lower bound function, which is the sum of the fundamental probabilities of each subset of the set A.
- (3)
- Plausibility function
The plausibility function represents the plausibility belief level and can be defined as follows:
where is called the upper limit function of set A. As the empty set, it is the total of the basic probabilities of the sets that do not intersect with A.
and , obtained from the elementary probability assignment, are used in D-S evidence theory to determine the confidence interval of set A, , for the set A in the discernment framework . When there are numerous mass functions operating inside the same discerning framework, the Dempster synthesis method is used to synthesize expert opinions to create a new mass function.
For , the synthetic formulas are
The new BPA is obtained by synthesizing expert opinions through the Dempster synthesis method and based on the previous BPA. The fundamental probability of the event is calculated using the Best Estimate of Trajectory (Bet) calculation. The calculation rule is
where denotes the number of elements in the set .
3.4. CREAM
The CREAM model is predicated on the idea that human performance in industrial operations is impacted by the environment in which the process occurs, which can have an impact on human cognitive patterns and operational performance rather than being an independent random event. The general steps for applying CREAM for human error probability prediction are as follows [44]:
- (1)
- Conducting an operation step analysis to establish cognitive behavior and cognitive function tables.
- (2)
- Conducting an evaluation of Common Performance Criteria (CPC) based on the environmental conditions of the operation.
- (3)
- Identifying the most likely failure modes during each operation step.
- (4)
- Predicting the probability of human error based on the failure probability and the weight factor of cognitive functionalities in the operating environment.
Human cognitive functions are divided into four groups by the CREAM: planning, execution, interpretation, and observation. Every cognitive function has thirteen failure modes, each of which has a basic failure probability value.
Cognitive activities include a variety of cognitive behaviors such as coordination, communication, observation, execution, maintenance, and monitoring which have a corresponding cognitive function [45].
The environmental conditions of the event are used to evaluate the levels of the nine CPC factors offered by the CREAM approach. Their anticipated impacts on performance dependability are ascertained [46].
The most likely cognitive failure mode in each action step is identified based on the results of operational process analysis, and the calibration value of Cognitive Failure Probability (CFP) for each action step is obtained [47], which is denoted as .
The weighing factors of the cognitive function are adjusted based on the operating environment to obtain the modified probability of human errors , which is then used to evaluate the CPC of the operational process as shown in Equation (8):
3.5. Integrated Dynamic Failure Analysis Procedure
The integrated dynamic failure analysis procedure for suction anchor installation operations based on the DBN-GO method in this study is shown in Figure 6.
Figure 6.
Integrated dynamic failure analysis procedure for the suction anchor installation operation.
- Step 1:
- Operation risk analysis
Create a flow chart based on the suction anchor installation operation process in marine natural gas hydrate development. Identify the risk factors for failure during the installation process.
- Step 2:
- Establish failure analysis model
Construct the GO model based on the flow chart of the suction anchor installation operation. Transform the GO model into a Bayesian network model using the mapping rules for suction anchor installation operation. Then, time series are introduced to establish the DBN of installation operation.
- Step 3:
- Quantify node probabilities
Calculate the failure risk of human factor nodes in the DBN model by CREAM approach. Establish the transfer probability table of device nodes in DBN. Predict the failure probability of device factor nodes using the D-S evidence theory and degradation model.
- Step 4:
- Result analysis
Determine the static failure probability, predict the failure probability of suction anchor installation operation, and identify key factors that lead to operation failure. Predict the dynamic failure probability based on the DBN model. Propose risk control measures based on the safety assessment.
4. Methodology Application
4.1. Operation Risk Analysis
The installation operation of the suction anchor in marine is affected by various factors such as the working environment, the equipment reliability, and the human behavior. Harsh marine environmental conditions, such as severe waves, ocean currents and typhoons, can affect the stability of the engineering vessel and safety of the suction anchor installation operation. The complex geological condition has a significant impact on the stability of the penetration installation operation of suction anchor. Before installing the suction anchor, a detailed investigation of the marine and geological environment is necessary. In offshore practice, the installation operation of suction anchor are planned in favorable environment. This article focuses on the operation scenario that has already passed the environment suitability assessment. The influence of the specific marine environment (wave height < 1.5 m, flow velocity < 2.0 knots, wind speed < 25 knots) can be ignored in the dynamic failure analysis of suction anchor installation operation. Based on this assumption, the following risk analysis mainly focuses on human and equipment factors in the lifting stage, lowering stage, and penetration stage.
- (1)
- Lifting stage from the vessel
The lifting of suction anchor and equipment commissioning are the main topics of this stage. The main tasks include hoisting the suction anchor out to sea, lowering the ROV into the seawater, and preparing the suction anchor for installation. The risk factors involved in the lifting stage are as follows:
- (a)
- Human factors: At this stage, the operator needs to control the crane to adjust the suction anchor to the appropriate posture. If human error appears, it may lead to equipment damage, project delays, casualty accidents, and other consequences.
- (b)
- Equipment factors: During the preparation of the suction anchor lifting, there is a potential risk of crane failure and cable fracture, leading to a suction anchor falling accident, which is a significant operation accident.
- (2)
- Lowering stage in the sea
At this stage, preparations for the suction anchor installation are completed, and the suction anchor is lowered by controlling the speed of cable. To ensure a steady and accurate lowering of the suction anchor to the intended location, the ROV is used to monitor the subsea environment and track the suction anchor position. The risk factors involved in the lowering stage are as follows:
- (a)
- Human factors: This is primarily associated with controlling the speed of the anchor lowering in the sea. Excessive speed or acceleration is not favorable for a stable lowering of the suction anchor.
- (b)
- Equipment factors: There are cases where the suction anchor and the cable connection had failed or the cable is fractured, resulting in the suction anchor being dropped out and not lowered to the intended position on the seabed.
- (3)
- Penetration stage in the formation
At this stage, the suction anchor has reached the seafloor. The cable is lowered so that the suction anchor slowly penetrates the seabed by gravity to a certain depth. The ROV attaches the suction pump to the top of suction anchor drain valve after the self-weight penetration. The suction pump is then turned on to pump out the seawater from inside of the suction anchor, creating a pressure differential between the outside and inside of the suction anchor that forces the suction anchor into the seabed until the predetermined depth is reached. After attaining the desired depth, the equipment are recovered, and the sinking penetration is completed. The risk factors involved in penetration stage are as follows.
- (a)
- Human factors: The pump pressure is precisely controlled by the operator during the penetration stage. Insufficient pump pressure cannot provide the driving force for penetration. Excessive pump pressure can affect the strength of the soil in the suction anchor and cause a soil plug, making it difficult for the suction anchor to penetrate the seabed to predetermined depth.
- (b)
- Equipment factors: This majorly involves the failure risk of the ROV and the suction pump. With ROV failure, the drain valve cannot be opened. With suction pump failure, the pumping pressure is not adequate for the suction anchor to penetrate the seabed to the required depth.
4.2. Establish Failure Analysis Model Using DBN-GO Method
4.2.1. Set Up GO Model
Three key factors are examined in the risk identification process for the suction anchor installation operation: equipment factors and the human factors. The coupling of personnel operations and operating equipment as a signal flow is an important step. The personnel decisions and procedures contained in the operational process as signal generators are translated into the type-5 operator in the GO diagram. The operational equipment is treated as an element that has a signal and conducts and is translated into the type-6 operator in the GO diagram. The initialization of the installation operation is translated to the type-1 operator. At the same time, all three phases need to operate normally to ensure the completion of the entire devolution operation, so the type-10 operator (with gate) is used to represent it.
The block diagram for the suction anchor installation operation (Figure 6) is transformed into a GO diagram model as shown in Figure 7. The graph is marked with the annotations “x–y”, where "y" is the serial number and "x" denotes the operator type. The signal flow is shown by the arrows connecting the operators, and the numbers indicate the signal flow number.
Figure 7.
GO model of suction anchor installation operation.
The system input signifies the suction anchor installation operation, indicated by 5–1. Each step is subject to human error and equipment stability. The use of type-5 operators indicates the combined effect of these influencing factors, e.g., 5–3 and 5–5. There are only two states (success or failure) marking the arrival of the engineering vessel to its destination, indicated by 1–2. Similarly, the operations of the suction anchor assembly, control winch start lowering, and suction anchor self-weight penetration are represented as 6–4, 6–12, and 6–20, respectively. The accomplishment of the three components is necessary to finish the suction anchor installation process: assembly on board, lowering in the water, and sinking in the mud, which is denoted by 10–27.
4.2.2. Transform GO Model into BN Model
The Bayesian node operation logic of the operator transformation is shown in Figure 8: operator 1 is a two-state unit, operator 5 is a signal generator, operator 6 is a component that conducts when there is a signal, and operator 10 is an AND gate. P represents the probabilities for the states YES (NO failure) and NO (failure). In the GO model in this paper, the previous operator fails, resulting in the failure of signal transmission and subsequent operations failure, resulting in system failure.
Figure 8.
Mapping algorithm of the operators to Bayesian node. (a) Mapping algorithm of operator 1; (b) mapping algorithm of operator 5; (c) mapping algorithm of operator 6; (d) mapping algorithm of operator 10.
The mapping rules of the GO graph model and Bayesian network are used to transform the GO model into an initial Bayesian network model for suction anchor installation operations as shown in Figure 9. In Figure 9, indicates the operational equipment, at the root node indicates human factors including personnel decisions and operations, and at the sub-node indicates the output signal of the operation step.
Figure 9.
Initial Bayesian network model for suction anchor installation operation.
Since multiple devices are involved in some of the suction anchor installation operation stages, the device nodes in the initial Bayesian network model need to be adjusted. Herein, the equipment in the suction anchor installation operation is summarized into five classes: the engineering vessel (), suction anchor (), crane (), ROV (), and suction pump (). The suction anchor installation operation Bayesian network model is constructed by merging all the same , , , and equipment nodes in the initial model is shown in Figure 10.
Figure 10.
Integrated Bayesian network model for suction anchor installation operation.
The elements represented by each node in the Bayesian network model for suction anchor installation operations are shown in Table 1.
Table 1.
Bayesian network node content.
4.2.3. Construct DBN-GO Model
During the service period of the equipment, its reliability may decline due to factors such as fatigue and corrosion. Considering the dynamic characteristics of equipment reliability, the DBN-GO model is constructed. As seen in Figure 11, the impact of dynamic node probabilities on the suction anchor installation operation is examined by taking equipment dependability fluctuation over time into account.
Figure 11.
Dynamic Bayesian network model of suction anchor installation operation.
4.3. Quantify Node Probability in DBN-GO Model
4.3.1. Human Factor Nodes
Based on the flow chart of the suction anchor installation operation, the cognitive behaviors used by the staff in each operational stage are recognized, and the related cognitive functions are ascertained. For instance, the cognitive behaviors involved in the engineering vessel arriving in target waters are “communication” and “observation”, and the cognitive behaviors involved in the assembly of the suction anchor are “coordination” and “execution”. The cognitive behaviors corresponding to all the operational steps and the corresponding cognitive functions are listed in Table 2.
Table 2.
Cognitive behavior and function in suction anchor installation operation.
For every cognitive activity, the most likely cognitive function failure mode is determined during the suction anchor installation process. The fundamental failure probability estimates are displayed in Table 3.
Table 3.
Cognitive failure mode and fundamental value of failure probability.
The eight CPC factors in CREAM are evaluated considering the operational conditions of the suction anchor installation operation. Set the second production test of natural gas hydrates in the South China Sea as a case study. This is a major national industrial project where the operation team undergoes strict selection and full-process exercises. Consequently, CPC factors are set at generally high levels in this case study. The scores are different considering the dominant cognitive functions required at different operation stages. Therefore, all CPC factors are set in the optimal environment. The total weight factor for the four cognitive functions during the suction anchor installation operation is obtained by multiplying the weight factors corresponding to each CPC as shown in Table 4. The proposed approach is a methodology. The results may be different in other scenarios.
Table 4.
Performance reliability and weight factor in different CPC levels.
The most likely failure modes and human-caused failure probabilities for the lowering step of the operation are obtained as shown in Table 5.
Table 5.
Human error probability table of suction anchor installation operation.
4.3.2. Equipment Factor Nodes
Since suction anchor installation equipment has comparatively little operation and failure data, it is not possible to calculate the probabilities that equipment such as suction anchor, ROV, and suction pump. Thus, based on OREDA, a multi-expert judgment method is employed to determine the probabilities of failure of individual equipment. The prior probabilities of failure of the lowering equipment are calculated using D-S evidence theory, which synthesizes multiple expert opinions. Considering their position, years of experience, and level of education, three professionals with pertinent work experience in the field of offshore oil and gas exploration are invited. The expert group consists of two experienced on-site marine engineering engineers and one university research professor. The experts not only possess solid theoretical knowledge of engineering risk quantification but also have over ten years of long-term practical experience in marine oil and gas exploration and development. The ratio of the two is 2:1. This composition takes into account both practical operational knowledge and systematic analysis methods, aiming to enhance the reliability and representativeness of prior probability assessment under conditions of limited data. The qualifications of the experts involved in the assessment are shown in Table 6.
Table 6.
Qualifications of experts participating in the evaluation.
The probability of success, failure, and uncertainty of suction anchor lowering equipment is predicted by the professional experience of experts. The D-S theory synthesis rule is then used to integrate the probability based on the experience of three experts with decentralized equipment. Finally, the prior failure probabilities for the engineering vessel (), suction anchor (), crane (), ROV (), and suction pump () are calculated. The relevant expert experience, combined confidence and likelihood, and the prior probability of failure values are presented in Table 7.
Table 7.
Prior failure probability of equipment obtained by evidence theory.
Similarly, the D-S evidence theory is applied to determine the probability of repair values for the engineering vessel, suction anchor, crane, ROV, and suction pump considered in the study, which are 0.0620, 0.0430, 0.0632, 0.0400, and 0.0860.
It is assumed that the device has two states: working (1) and faulty (0). t is the initial use time, the interval between two consecutive tests is , The likelihood of equipment malfunctioning is , and the probability of repair is .
When the initial state is 1, the transition relationship between successive nodes is set according to the following empirical formula [48]:
When the initial state is 0, the instantaneous node state probabilities are set as the following:
5. Results and Discussion
5.1. Static Failure Probability Analysis
Based on the study of Section 4.3, the prior failure probabilities of human and equipment factors are quantified in the suction anchor installation operations. Considering the logical operation relationship between the equipment root node, the human factor root node, and the sub-nodes of the operation steps, the failure probability of each operation step is determined by the forward inference of BN. Then, the failure probability of the whole installation operation is calculated. The probabilities of success and failure for each step (Bayesian network sub-nodes) of the suction anchor installation operation are shown in Table 8. This study uses GeNle software (https://genieonline.com/) to build a Bayesian network model for suction anchor installation operations, and the failure probability of suction anchor installation operations is 0.298%. According to the common risk acceptance criterion in offshore practice, the failure probability of 0.298% is in low-risk range. The risk will be within the acceptable level, if installation operation of suction anchor is carried out in accordance with the recommended standards (API-RP-2GEO-2014 [49], NB/T 11705-2024 [50]).
Table 8.
Probability of sub-nodes of Bayesian networks.
The failure of the suction anchor installation operation is used as the initial condition using the backward inference capability of Bayesian networks, which inverts the posterior probabilities that failure for each actual event. The primary risk factors for the failure of suction anchor installation process can be found by comparing and evaluating the before and posterior failure probabilities. Figure 12 shows a comparison of the root node of the suction anchor installation prior and posterior failure probabilities of operation.
Figure 12.
Comparison of prior and posterior failure probability of root nodes. (a) Human factor nodes; (b) equipment factor nodes.
As seen in Figure 12a, the posterior probability of human error is generally higher than the posterior probability of equipment failure. The human factors nodes that significantly impact the failure of the suction anchor installation operation are , , , , , , , , and . Errors in sequence, mode of action, and timing of the action lead to human error. Among these nodes, the has the highest posterior probability. This is due to the long-term exposure of shallow subsea soil to erosion by seawater, low soil strength, and the excessive pumping power that causes an extreme pressure difference and soil plugging inside the anchor. Thus, the unreasonable pump pressure control by the operator can easily lead to failure in the mud sink or even the entire installation operation.
As seen in Figure 12b, the equipment failure nodes with a high posterior probability are (suction pump), (ROV), (suction anchor), and (crane). The suction pump contains pumps, valves, instruments, and piping, which are prone to corrosion and leakage in the harsh marine environment of deep waters. The ROV is a crucial piece of equipment in the suction anchor installation operation. It guides the suction anchor down to a predetermined position and assists the suction pump in the negative pressure penetration operation. Thus, if the ROV malfunctions, it will significantly affect the operation efficiency. The crane is involved in the entire process and is vital to the successful completion of the operation. Furthermore, the structural deformation brought on by extreme pressure between the inside and outside of the suction anchor, an accidental collision with the seabed, etc. may prevent the suction anchors from penetrating to a required level. Therefore, ROV, suction pump, crane, and suction anchor are all critical equipment for the suction anchor installation operation. They require regular maintenance and servicing of the equipment.
Compared the failure possibilities of human factors and equipment factors, the results indicate that human error is more likely to occur than equipment failure in the installation process of suction anchor.
5.2. Dynamic Failure Probability Analysis
The dynamic failure probability for suction anchor installation process can be examined using the DBN model. In study, different time intervals are chosen to indicate the cumulative hours. Considering the dynamic reliability of relevant equipment, the variation of failure probability of suction anchor installation operations is analyzed with time intervals. The prior probability of equipment failure from Table 7 is substituted as the failure rate of equipment into Equations (8)–(11) to determine the probability that the associated equipment will fail at certain intervals. The maintenance strategy is set based on the advice of field engineers, considering normal offshore maintenance practices. Each cycle is approximately 30 days (including the round-trip time) in normal offshore installation operation practices. Considering both time and economic benefits comprehensively, on-site engineers suggest the maintenance is conducted once every five operation cycles. So, setting the relevant equipment is repaired, respectively, on days 150 and 300. This schedule settlement reflects a trade-off in practice, balancing time efficiency and economic costs with system reliability. The failure probability is computed for three distinct scenarios of suction anchor installation operations. The result is shown in Figure 13.
Figure 13.
Dynamic failure probability of Suction anchor installation operation.
As seen in Figure 13, if the equipment is not well maintained, the failure probability will continue to increase with the accumulation of equipment service time. The result indicates that without maintenance for a year, the failure chance of the suction anchor installation operation rises to 0.2064. This increase results from the time-varying degradation of equipment and risk accumulation in the multi-stage process. Equipment performance gradually decreases under corrosion, fatigue, and wear. Risks at each stage have a cumulative effect. Regular maintenance can slow down equipment degradation and prevents failure probability increasing over time. If the equipment is maintained at 300 days, the failure probability remains at 0.1714 stably. If the equipment is maintained at 150 days, the failure probability remains at 0.0918 stably. With the increase in maintenance interval time of the equipment, the failure probability of the suction anchor installation operation increases. Thus, it is suggested that regular maintenance at the key equipment should be conducted, which can significantly reduce the operation failure probability of suction anchor installation operation in marine natural gas hydrate development.
6. Summary and Conclusions
A dynamic failure analysis procedure for suction anchor installation is proposed by incorporating two models, the GO method and DBN model. A case study based on an on-site suction anchor installation process is conducted to verify the feasibility of the proposed procedure combined human error and equipment failure. The main conclusions are summarized as follows.
- (1)
- Considering the suction anchor installation process, human and equipment risk factors are identified in key stages—including the lifting stage from the vessel, lowering stage in the sea, and penetration stage in the formation. The failure probabilities of equipment and human factors nodes are quantified by D-S Evidence Theory and CREAM, respectively. In the case study, the failure probability of the suction anchor installation operation is 0.298% by forward inference of the DBN-GO model.
- (2)
- Bayesian reverse inference is applied to analyze posterior failure probabilities of the root nodes and to identify the key factors leading to operation failure. The results indicate that human error is more likely to occur than equipment failure in the installation process of suction anchor.
- (3)
- Among the equipment factor nodes, the suction pump shows the highest possibility of causing operation failure. Among the human factor nodes, the suction anchor negative pressure penetration stage exhibits the highest possibility of causing installation failure.
- (4)
- A DBN is further used to investigate the variation of operation failure probability over time under different equipment maintenance scenarios. The results demonstrate that operation failure probability increases with equipment service time. For example, if the equipment is not maintained for more than one year, the failure probability of the suction anchor installation operation may rise to 20.64%. Regular maintenance can significantly reduce the operation failure probability.
Overall, the proposed dynamic failure analysis procedure provides an effective tool to quantify the risk of the suction anchor installation operation under complex and uncertain conditions. It enables quantitative assessment even with incomplete input information, and can identify the key factors leading to operation failure, thereby helping timely risk control and decision-making.
This study has the following limitations: Firstly, detailed investigation of the marine environment is assumed in the study. The influence of the favorable marine environment is ignored. Harsh environmental loads are excluded, such as abrupt changes of wind, wave, and current. Secondly, the geotechnical investigation is assumed to be reliable. The risk of inability to penetrate and tilting during installation are ignored in the study. Finally, the interruption or incompletion of the installation operation process caused by structural inherent damage are not considered in our study. The future research work will construct a systematic risk assessment model in the suction anchor installation process, considering the uncertain influence of the marine and geological environment. Establishing dynamic control and the balance method based on reinforcement learning reduces risks of the suction anchor in the installation process. Extending the risk assessment research field from the installation stage to service stage, we can study the long-term instability risks of the suction anchor in marine natural gas hydrate development.
Author Contributions
K.L.: Conceptualization, Writing-review and editing, Methodology. H.Z.: Writing-Original draft preparation, Methodology, Software, Data curation, Writing-review and editing. H.X.: Validation, Writing-review and editing. G.C.: Supervision, Validation. L.L.: Investigation. F.C.: project administration, Visualization, Investigation. D.L.: project administration, Investigation. All authors have read and agreed to the published version of the manuscript.
Funding
This research was funded by the National Key R&D Program of China (granted number 2024YFC3014001), the National Natural Science Foundation of China (granted number 52104016), the Major Scientific and Technological Projects of CNPC (granted number ZD2019-184-004).
Institutional Review Board Statement
Not applicable.
Informed Consent Statement
Not applicable.
Data Availability Statement
The original contributions presented in this study are included in the article. Further inquiries can be directed to the corresponding author.
Acknowledgments
The authors gratefully acknowledge the National Key R&D Program of China (2024YFC3014001), National Natural Science Foundation of China (52104016) and the Major Scientific and Technological Projects of CNPC (ZD2019-184-004). We also would like to express our gratitude to the editors and reviewers for giving valuable comments and suggestions.
Conflicts of Interest
Author Fei Cao is employed by CNPC Offshore Engineering Company Limited. Author Duoya Liu is employed by the Drilling Technology Research Institute of Sinopec Shengli Petroleum Engineering Company Limited. The other authors declare no conflicts of interest.
References
- Tiong, M.; Peng, W.-Z.; Liu, Q.; Wu, S.; Ye, H.; Liu, S.-X.; Xue, M.; Xian, C. Natural gas hydrate exploitation: A comprehensive review of structural properties, technical progress and environmental challenges. Gas Sci. Eng. 2025, 144, 205769. [Google Scholar] [CrossRef] [Scilit]
- Lu, Q.P.; Yu, Y.J.; Wen-Wei, X.; Liang, J.-Q.; Lu, J.-A.; Xu, B.-C.; Shi, H.-X.; Yu, H.-Y.; Qin, R.-L.; Li, X.-C.; et al. Design and feasibility analysis of a new completion monitoring technical scheme for natural gas hydrate production tests. China Geol. 2023, 6, 466–475. [Google Scholar] [CrossRef] [Scilit]
- Sun, W. Production Simulation of Stimulated Reservoir Volume in Gas Hydrate Formation with Three-Dimensional Embedded Discrete Fracture Model. Sustainability 2024, 16, 9803. [Google Scholar] [CrossRef] [Scilit]
- Chen, H.; Du, H.; Shi, B.; Shan, W.; Hou, J. Mechanical properties and strength criterion of clayey sand reservoirs during natural gas hydrate extraction. Energy 2022, 242, 122526. [Google Scholar] [CrossRef] [Scilit]
- An, Y.; Zhang, Y.; Hui, C.; Hasan, K.; Zhang, P.; Du, H.; Wang, J.; Cui, X. Numerical simulation on natural gas hydrates exploitation via multilateral well: Impacts on sand production and geomechanical responses. Fuel 2025, 383, 133898. [Google Scholar] [CrossRef] [Scilit]
- Ye, H.; Yao, Y.; Chen, D.; Duan, J.; Wu, X.; Li, D.; Zi, M. Hydrate-based CO2 sequestration in post-exploitation natural gas hydrate reservoir: A numerical method considering mixed hydrate. Energy 2025, 336, 138406. [Google Scholar] [CrossRef] [Scilit]
- Zhang, Z.; Li, Y.; Li, S.; He, J.; Li, X.; Lu, C.; Qin, X. Case study on the combined use of surface seawater injection and depressurization for sustainable natural gas hydrate extraction. J. Clean. Prod. 2025, 494, 144994. [Google Scholar] [CrossRef] [Scilit]
- Jin, Z.; Jin, Y.F.; Yin, Z.Y.; Chen, X. Influence of local scour on the evolution of the failure envelope for suction caisson foundation. Appl. Ocean Res. 2024, 150, 11. [Google Scholar] [CrossRef] [Scilit]
- Zhu, G.; Yang, J.; Li, S.; Wang, J. Research on lateral bearing characteristics of the suction pile for deepwater submerged wellhead. Ocean Eng. 2025, 336, 121790. [Google Scholar] [CrossRef] [Scilit]
- Chen, L.; Merey, S.; Pecher, I.; Okajima, J.; Komiya, A.; Diaz-Naveas, J.; Li, S.; Maruyama, S.; Kalachand, S.; Kvamme, B.; et al. A review analysis of gas hydrate tests: Engineering progress and policy trend. Environ. Geotech. 2020, 40, 242–258. [Google Scholar] [CrossRef] [Scilit]
- Li, B.; Kou, B.B.; Li, B.; Okajima, J.; Komiya, A.; Diaz-Naveas, J.; Li, S.; Maruyama, S.; Kalachand, S.; Kvamme, B.; et al. Application of wellhead suction anchor technology in the second production test of natural gas hydrates in the South China Sea. China Geol. 2022, 5, 293–299. [Google Scholar]
- Senpere, D.; Auvergne, G.A. Suction anchor piles—A proven alternative to driving or drilling. In Proceedings of the Offshore Technology Conference, Houston, TX, USA, 3–5 May 1982. [Google Scholar]
- Goodman, L.J.; Lee, C.N.; Walker, F.J. The feasibility of vacuum anchorage in soil. Geotechnique 1961, 1, 356–359. [Google Scholar] [CrossRef] [Scilit]
- Sivertsen, T.; Strand, H. New well foundation concept, as used at a Norwegian Sea well. In Proceedings of the SPE Arctic and Extreme Environments Conference and Exhibition, Mosccow, Rusia, 18–20 October 2011. [Google Scholar]
- Naess, T.; Havn, J.; Solaas, F. On the importance of slamming during installation of structures with large suction anchors. Ocean Eng. 2014, 89, 99–112. [Google Scholar] [CrossRef] [Scilit]
- Ha, Y.; Nam, B.; Hong, S.; Jung, D.; Kim, H. Experimental and numerical study on mating operation of a topside module by a floating crane vessel in waves. Ocean Eng. 2018, 154, 375–388. [Google Scholar] [CrossRef] [Scilit]
- Wang, Y.; Tuo, H.; Li, L.; Zhao, Y.; Qin, H.; An, C. Dynamic simulation of installation of the subsea cluster manifold by drilling pipe in deep water based on OrcaFlex. J. Pet. Sci. Eng. 2018, 163, 67–78. [Google Scholar] [CrossRef] [Scilit]
- Sezer, S.I.; Akyuz, E. An integrated CREAM and Dempster–Shafer (D-S) evidence theory for improving human reliability in maritime search and rescue (SAR). Ocean Eng. 2025, 340, 122241. [Google Scholar] [CrossRef] [Scilit]
- Liu, J.; Li, X.; Zhang, Y.; Li, T.; Wei, L.; Wu, W. Failure risk assessment by multi-state dynamic Bayesian network based on interval type-2 fuzzy sets and leaky-weighted sum algorithm: A case study of crude oil pipelines. Expert Syst. Appl. 2024, 250, 123942. [Google Scholar] [CrossRef] [Scilit]
- Wang, J.; Fan, H.; Chang, Z.; Lyu, J. Unleashing data power: Driving maritime risk analysis with Bayesian networks. Reliab. Eng. Syst. Saf. 2025, 264, 111310. [Google Scholar] [CrossRef] [Scilit]
- Williams, R.L.; Gateley, W.Y. Use of the GO methodology to directly generate minimal cut sets. In Nuclear System Reliability Engineering and Risk Assessment; Fussell, I.B., Ed.; Society for Industrial and Applied Mathematics: Philadelphia, PA, USA, 1977; pp. 825–849. [Google Scholar]
- Wood, D.E.; Becar, N.J. Risk Analysis of a Spent Fuel Receiving and Storage Facility Using the GO Methodology; Technical Report KSC-1006-1; Kaman Sciences Corp.: Colorado Springs, CO, USA, 1979. [Google Scholar]
- Matsuoka, T.; Kobayashi, M. The GO-FLOW reliability analysis methodology—Analysis of common cause failures with uncertainty. Nucl. Eng. Des. 1997, 175, 205–214. [Google Scholar] [CrossRef] [Scilit]
- Shen, Z.P.; Huang, X.R. Principle and Application of GO Methodology: A System Reliability Analysis Method; Electric Power Research Institute (EPRI): Palo Alto, CA, USA, 2004; pp. 1–114. [Google Scholar]
- Nie, Z.; Chang, Y.; Liu, X.; Chen, G. A DBN-GO approach for success probability prediction of drilling riser emergency disconnect in deepwater. Ocean Eng. 2019, 180, 49–59. [Google Scholar] [CrossRef] [Scilit]
- Khakzad, N.; Khan, F.; Amyotte, P. Dynamic safety analysis of process systems by mapping bow-tie into Bayesian network. Process Saf. Environ. Prot. 2013, 91, 46–53. [Google Scholar] [CrossRef] [Scilit]
- Li, X.; Chen, G.; Jiang, S.; He, R.; Xu, C.; Zhu, H. Developing a dynamic model for risk analysis under uncertainty: Case of third-party damage on subsea pipelines. J. Loss Prev. Process Ind. 2018, 54, 289–302. [Google Scholar] [CrossRef] [Scilit]
- Li, X.; Zhang, Y.; Abbassi, R.; Khan, F.; Chen, G. Probabilistic fatigue failure assessment of free spanning subsea pipeline using dynamic Bayesian network. Ocean Eng. 2021, 234, 109323. [Google Scholar] [CrossRef] [Scilit]
- OREDA. Offshore Reliability Data Handbook; SINTEF Industrial Management; Det Norske Veritas: Oslo, Norway, 2015. [Google Scholar]
- Mahmoudi, J. SIL analysis of subsea control system components based on a typical OREDA database. Qual. Reliab. Eng. Int. 2021, 37, 3297–3313. [Google Scholar] [CrossRef] [Scilit]
- Liu, J.; Jia, B.; Zhang, Z.; Wang, Z.; Wang, P.; Geng, J. Lightning Failure Risk Assessment of Overhead Transmission Lines Based on Modified Dempster–Shafer Theory. Energies 2022, 15, 2538. [Google Scholar] [CrossRef] [Scilit]
- Jie, C.; Guoming, C.; Xinhong, L.; Dongdong, Y.; Kaiyue, G.; Changxin, L. Reliability analysis of deep-water drilling man-machine interface system based on DBN. China Saf. Sci. J. 2018, 28, 124. [Google Scholar]
- Zhou, Q.; Wong, Y.D.; Loh, H.S.; Yuen, K.F. A fuzzy and Bayesian network CREAM model for human reliability analysis—The case of tanker shipping. Saf. Sci. 2018, 105, 149–157. [Google Scholar] [CrossRef] [Scilit]
- Wang, T.; Hu, T.; Pang, X.Q.; Zhang, X.W.; Liu, X.H.; Xu, Z.; Wang, E.Z.; Wu, Z.Y. Distribution and resource evaluation of natural gas hydrate in South China Sea by combing phase equilibrium mechanism and volumetric method. Pet. Sci. 2022, 19, 26–36. [Google Scholar] [CrossRef] [Scilit]
- Li, M.; Liu, J.; Xia, Y. Risk Prediction of Gas Hydrate Formation in the Wellbore and Subsea Gathering System of Deep-Water Turbidite Reservoirs: Case Analysis from the South China Sea. Reserv. Sci. 2025, 1, 52–72. [Google Scholar] [CrossRef] [Scilit]
- Li, W.; Liao, J. Microscopic Analysis of Flow Resistance of Oil Displacement Fluid in Reservoir Fractures. Reserv. Sci. 2026, 2, 16–33. [Google Scholar] [CrossRef] [Scilit]
- Ye, J.; Qin, X.; Xie, W.; Lu, H.; Ma, B.; Qiu, H.; Liang, J.; Lu, J.; Kuang, Z.; Lu, C.; et al. Main progress of the second gas hydrate trial production in the South China Sea. Geol. China 2020, 47, 557–568. [Google Scholar]
- Liu, Z.; Liu, Y. A Bayesian network based method for reliability analysis of subsea blowout preventer control system. J. Loss Prev. Process Ind. 2019, 59, 44–53. [Google Scholar] [CrossRef] [Scilit]
- Khakzad, N.; Khan, F.; Amyotte, P. Quantitative risk analysis of offshore drilling operations: A Bayesian approach. Saf. Sci. 2013, 57, 108–117. [Google Scholar] [CrossRef] [Scilit]
- Jensen, F.V.; Nielsen, T.D. Bayesian Networks and Decision Graphs, 2nd ed.; Springer: New York, NY, USA, 2007. [Google Scholar]
- Cai, B.; Huang, L.; Xie, M. Bayesian networks in fault diagnosis. IEEE Trans. Ind. Inform. 2017, 13, 2227–2240. [Google Scholar] [CrossRef] [Scilit]
- Liu, Z.; Ma, Q.; Cai, B.; Liu, Y.; Zheng, C. Risk assessment on deepwater drilling well control based on dynamic Bayesian network. Process Saf. Environ. Prot. 2021, 149, 643–654. [Google Scholar] [CrossRef] [Scilit]
- Si, L.; Wang, Z.B.; Jiang, G. Fusion recognition of shearer coal-rock cutting state based on improved RBF neural network and DS evidence theory. IEEE Access 2019, 7, 122106–122121. [Google Scholar] [CrossRef] [Scilit]
- He, X.; Wang, Y.; Shen, Z.; Huang, X. A simplified CREAM prospective quantification process and its application. Reliab. Eng. Syst. Saf. 2008, 93, 298–306. [Google Scholar] [CrossRef] [Scilit]
- Sun, R.; Wang, X. Application of failure probability of CREAM for judgement and decision-making in the cockpit. J. Saf. Sci. Technol. 2010, 6, 40–45. [Google Scholar]
- Kim, M.C.; Seong, P.H.; Hollnagel, E. A probabilistic approach for determining the control mode in CREAM. Reliab. Eng. Syst. Saf. 2006, 91, 191–199. [Google Scholar] [CrossRef] [Scilit]
- Chen, J.; Chen, G.; Li, X. Research on risk factors of well killing operation in deep-water well control based on BN-CREAM. J. Saf. Sci. Technol. 2016, 12, 86–91. [Google Scholar]
- Wang, C.; Liu, Y.; Yu, C.; Zheng, Y.; Wang, G. Dynamic risk analysis of offshore natural gas hydrates depressurization production test based on fuzzy CREAM and DBN-GO combined method. J. Nat. Gas Sci. Eng. 2021, 91, 103961. [Google Scholar] [CrossRef] [Scilit]
- API-RP-2GEO-2014; Geotechnical and Foundation Design Considerations. American Petroleum Institute (API): Washington, DC, USA, 2014.
- NBT11705-2024; Guidelines for Geotechnical Engineering and Installation Design of Suction Anchors. National Energy Administration of China: Beijing, China, 2024.
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content. |
© 2026 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license.