Abstract
Selecting the right maintenance contractor is crucial for efficient operation and project success. Traditionally, this selection has been cost-driven, but the ever-growing complexity of projects has led to a shift towards best-value selection. The best value selection criteria evaluate the contractors based on factors like experience and past performance, along with the proposed cost. However, this approach lacks substantiated knowledge of these factors and often includes factors that cannot be validated at the time of procurement. This paper proposes a framework that applies the Analytical Hierarchy Process (AHP) to the maintenance contractor selection process. A detailed literature review was carried out to identify factors involved in maintenance selection. Data were collected from experts through a questionnaire developed based on the identified factors, facilitating AHP implementation. Substantiation strategies were identified using expert judgments. Our findings reveal that past performance criteria hold the maximum weight in the selection process. The proposed framework offers a more comprehensive approach for selecting maintenance contractors, ensuring both value and efficiency.
1. Introduction
The quality of life inside multistory buildings relies heavily on the uninterrupted availability of services such as elevators, HVAC, and water pumps [1]. Recognizing this, building owners prioritize the maintenance of these facilities to ensure continuous operation, enhance the long-term value, and ensure user satisfaction [2]. These facilities cannot provide their intended services without regular maintenance [3]. Observations made since 2002 indicate that more than half of the building operations have been maintenance-related [4]. According to reports, maintenance work has experienced a 66% increase over the past decade. Additionally, between the early 1990s and 2000, maintenance work increased by 43%, while in contrast, building work only saw an increase of 28% during the same period [5,6,7]. Often, maintenance contractors are chosen based on the lowest bid instead of performance, leading to errors and complaints during the operation phase [8]. Selecting the contractor that offers the lowest annual fee results in overlooking the best-value criteria such as past performance, technical capabilities, and personnel [9]. Therefore, it is important for building owners to select a maintenance contractor after evaluating the contractor’s technical qualifications to safeguard their interests [10].
Various procedures for contractor selection have been proposed by researchers and applied in the field over the past few decades [11]. Contractor selection is a multi-criteria problem, not limited to bid price only [12]. Extensive research and practices in the construction industry have focused on multi-criteria decision methods for contractor selection. This includes the application of the ANP technique by Cheng and Li [13], and in addition, detailed analysis on contractor selection has been covered at the pre-qualification and procurement stages by [14,15,16,17,18]. These studies recommend using non-price criteria, such as past performance and experience, in contractor selection instead of low-priced traditional selection. Similarly, many other studies on the maintenance contractor selection process have been carried out by Zavadskas and Vilutienė [11], Zavadskas et al. [19], Hadidi and Khater [20], and Zubair and Zhang [21], which also focus on the use of non-price factors. There is limited research performed in the literature on maintenance contractor selection [11,22] and a gap exists in evidence-based knowledge for substantiating the selection criteria. When companies hire a maintenance contractor, they may struggle to make informed choices if they lack awareness of the variables involved in evaluating the contractor, leading to subpar work and increased costs. According to Zavadskas and Vilutienė [11], maintenance and construction processes differ fundamentally, as clients in maintenance prioritize both the final outcome and the ongoing maintenance process. Consequently, the selection criteria for maintenance work significantly differ from those applicable to construction projects. Additionally, most efforts concentrate on creating models for new construction projects, often lacking relevance for maintenance work. The irrelevance may be due to the fact that the nature of maintenance work is better perceived as a service than a product [22], emphasizing the necessity for specific approaches in determining decision-making attributes. Adhikary et al. [23] highlighted that inaccurate design or improper selection of any parameter in the maintenance process can have a high negative impact on the overall cost and efficiency, and [24] emphasized that selecting maintenance contractors is a critical decision-making process that requires careful evaluation of several criteria. An effective approach for assessing and choosing the right contractors for maintenance projects involves the use of multi-criteria decision-making methods. Hence, traditional methods are insufficient for executing maintenance contractor selection [25], highlighting the need for a dedicated framework made specifically for maintenance selection.
Current contractor selection frameworks are lacking in substantiated knowledge and effective strategies to help owners evaluate maintenance contractors’ attributes, especially their past performance, rendering them less helpful in actual practice. This study aims to fill this gap by providing a substantiated framework by collecting data from industry experts and framing their opinions alongside best-value attributes. The best value attributes in contractor selection encompass various factors contributing to the overall quality, efficiency, and success of a project [26]. This approach will assist building owners in evaluating contractors’ attributes using the provided evaluation technique. The research will integrate current best practices and industry insights to refine the selection process, thereby mitigating risks and increasing project success. The proposed framework will offer specific quality assessment methods to ensure industry adoption. This research aims to facilitate building owners by focusing on a well-informed selection of maintenance contractors through a best-value approach. Utilizing multi-criteria decision-making methods like the AHP, this research provides a balance between cost-effectiveness and service quality. The contributions of this study are as follows: (1) Identifying the factors influencing the selection criteria of maintenance contractors. (2) Developing a framework for employing maintenance contractors. (3) Devise strategies to aid owners in substantiating factors in the best-value process.
2. Literature Review
Contractor selection is one of the most important tasks in a project and crucial for ensuring successful execution. This challenging and exhaustive process requires considering numerous interrelated factors and uncertainties to make an informed decision [27]. An ineffective selection process can adversely affect future decisions [14]. Most of the time, the selection of a contractor takes place purely on the basis of the lowest bid instead of the best value criteria [28]. Mostly, a bidder is selected based on the lowest cost, a practice that might not guarantee the lowest cost upon completion due to potential claims, litigation during construction, project delays, and poor work quality [27].
The best value (BV) criteria have been adopted in many developed countries; however, it often faces barriers such as liability claims of bias as the BV contractor price is high compared to some other bidders [29]. A study was carried out on Design-Bid-Build (DBB) contractors in the USA, focusing on the BV selection process, and gathered data from 167 DBB contracts. The results indicated that BV contractors were selected 52% of the time over the lowest bid contractors, and 67% of these contractors also ranked within the top two for lowest bids, highlighting the preference for a balance between cost and quality, where people often prioritize the efficiency of a qualified contractor over the desire for greater quality at an expensive cost [30]. BV criteria are not only applicable in contractor selection but have also been utilized in many other sectors of the construction industry [31]. One of the most common techniques used in BV criteria is AHP, which has found application in many construction management problems. It has been used in risk management, sustainable construction, bidding processes, contractor prequalification, and more [32].
Different techniques have been applied for contractor selection. Cheng and Li [13] used the analytical network process (ANP) and the multiple-layer fuzzy pattern recognition (MFPR) approach to solve the contractor selection problem [14]. Another study incorporated quantitative and qualitative factors in selection criteria, developing a framework through generalized comparative linguistic ELECTRE III [18]. A 2013 study analyzed text from design-build contractor RFPs. RFPs samples included residential, commercial, heavy civil work, institutional, industrial, and renovation work. The study identified 23 factors across 10 different categories, with price and experience being the most frequent considerations. Price was considered 91% of the time, followed by experience at 83%. Technical approach, management approach, qualification, and schedule had 72%, 68%, 62%, and 60%, respectively, while past performance, financial capability, responsiveness to RFP, and legal status had 54%, 37%, 37%, and 14%, respectively [16]. Another study was carried out in 2017 on the procurement methods of contractors, with a focus on factors considered in the literature. Results reveal that quality is most important at 9.2%, followed by cost, staff features, financials, company management, experience, and time at 8.2%, 7.9%, 7.9%, 7.6%, 6.5%, and 6%, respectively [17].
Studies on maintenance contractor selection have used various methodologies. Zavadskas et al. [33] used a simulation approach using data from 15 maintenance contractors to identify best practices for enhancing the maintenance contractor selection process. In a subsequent study in 2006, a multi criteria evaluation of a maintenance contractor was conducted through a case study. Sixteen maintenance firms and 11 client data sets were analyzed to create a statistical model linking client satisfaction and maintenance performance. Clients ranked cost as the highest priority, followed by maintenance level, quality standard of service, reliability of the firm, employee qualification, and implementation of needs [11]. Another study was conducted to determine the criteria prioritized by all parties involved in the selection of maintenance contractors. This study evaluated maintenance contractors by ranking attributes that would be acceptable to all parties during both the selection process and the execution of maintenance tasks [19]. Hadidi and Khater [20] concluded that maintenance contractors should be procured based on their past performance, expertise, technical plans, and health and safety plans. Zubair and Zhang [21] developed a framework for elevator maintenance contractors through text analysis of RFPs. This study focused on improving the current practices for maintenance contractor selection through content analysis of existing RFPs.
Analytic Hierarchy Process (AHP) is an easy-to-use Multi-Criteria Decision-Making (MCDM) method that uses hierarchy and pairwise comparisons. It ensures consistency by calculating the consistency index before establishing rankings. Other MCDM methods, like Simple Additive Weighting (SAW) and Weighted Product (WP) methods, rely on a weighted average approach but lack built-in consistency checks. AHP is user-friendly, but for more complex scenarios with numerous criteria and alternatives, it becomes less practical due to the increased effort and time required [34]. SAW and WP, while less intricate, provide alternative decision-making approaches without the same consistency as AHP [35]. AHP was chosen for this study due to its ease of implementation and the limited number of attributes in this paper. Its simplicity makes it a practical choice for decision-making with fewer criteria.
In conclusion, current maintenance contractor selection frameworks emphasize a multi-criteria approach; however, there is a lack of robust strategies for evaluating these criteria. The proposed study identifies the different attributes and their weights in the selection of a maintenance contractor through AHP. Additionally, substantiation strategies for these attributes are identified by industry expert consultants.
3. Research Methodology
This chapter presents the research method used to analyze and achieve our objectives. The proposed methodology starts with a detailed literature review aimed at identifying the attributes/factors for the selection of a maintenance contractor. Following this, a preliminary questionnaire survey is conducted to validate these attributes from industry professionals and consultants. After that, a final questionnaire survey is conducted, which facilitates the pairwise comparison of attributes. The analytical hierarchy process is employed in this step as a multi criteria decision making (MCDM) technique. This final questionnaire also helps in the substantiation of attributes. Survey participants were identified via LinkedIn, specifically targeting individuals with extensive expertise in the relevant field. The methodology adopted in this research is shown in Figure 1. The following sections below explain the methodology in detail.
Figure 1.
Research Methodology.
3.1. Factors Identification
A detailed literature review regarding the selection of maintenance contractors was conducted to identify the factors. Various databases, such as Science Direct, Google Scholar, Scopus, and Web of Science, were utilized to gather a comprehensive set of studies on the given topic. Multiple combinations of keywords, including maintenance contractor, best value selection, and contractor selection factors, as well as synonymous terms, were utilized to ensure the retrieval of a maximum number of results. After a literature review, a total of 21 factors were identified. These factors and their respective sources are shown in Table 1.
Table 1.
Factor identification through a literature review.
3.2. Analytical Hierarchy Process (AHP)
Analytical Hierarchy Process (AHP) is a decision support model that was introduced by Saaty [51]. It is a mathematical technique renowned for its effectiveness in solving complex decision-making problems. AHP is the method for making the best decision when the decision-maker has many criteria [52]. This technique helps in disintegrating problems into a hierarchy of criteria and sub-criteria, allowing for a comparative analysis. This process includes both qualitative and quantitative elements and helps structure complex decision problems into a stepwise decision model. It assumes that relationships between clusters are unidirectional across different decision levels in the hierarchy and that there are no correlations between clusters and elements within each cluster or sub-cluster.
The AHP process works as follows: AHP involves identifying criteria and their corresponding sub-criteria. This helps in breaking down the decision into specific factors for consideration. Following this, pairwise comparisons are made between the components, providing a relative scale of their importance. Experts in their respective fields are asked to compare the importance of each pair of elements at every level of the hierarchy. This involves assessing the relative significance of each criterion compared to others at the second level. Similarly, experts compare the importance of each pair of sub-criteria under the same criterion at the second level and continue this process throughout the hierarchy. Since AHP uses subjective judgments from decision-makers, there is no automatic assurance of consistency in these judgments. Hence, it becomes essential to conduct consistency checks to ensure an optimized outcome. Results from these comparisons are normalized, a process where values are adjusted for accurate weight calculations. Subsequently, weights are determined for the decision components (criteria/sub-criteria), and in the end, the weights assigned to the decision components are combined, effectively aggregating all the factors into a final decision.
3.3. Questionnaire Design
After shortlisting factors from the literature review, a preliminary questionnaire was developed to gather expert opinions on the importance of these factors in selecting a maintenance contractor. The questionnaire was distributed to 5 industrial professionals associated with consultancies with 10–25 years of experience. This questionnaire aimed to validate the identified factors and determine their sustainability. Participants were asked to identify the factors they deemed unimportant in selecting a maintenance contractor. Factors marked as unimportant by three or more consultants were subsequently discarded. Four factors received low ratings from industry experts and were discarded. The remaining 17 were shortlisted, and these factors are given in Table 2. These 17 factors were distributed into 5 different categories based on their nature. Using these factors, a final questionnaire was developed aimed at determining the weights of these attributes and exploring the substantiation techniques in the decision-making process of selecting a maintenance contractor. For assigning weights to attributes, a multi-criteria decision making technique is employed due to its significance in solving complex problems. AHP participants compare pairs of evaluation criteria to establish their prioritization. Then they compare each sub-criteria for each criterion.
Table 2.
Shortlisted factors.
3.4. Pairwise Comparisons
Pairwise comparisons were determined through a survey with experts, which included the final questionnaire for experts to make pairwise comparisons. Alongside AHP’s pairwise comparison section for criteria and sub-criteria, this questionnaire contains another section aimed at identifying strategies to substantiate the attributes. As per the literature, a sample size of one qualified expert can be used [53,54]. Other researchers have used sample sizes ranging from four to nine [55,56,57]. These findings indicate that AHP can be implemented with a few experts to achieve useful decision models. For the survey, our sample size consisted of seven experts. Their details are shown in Figure 2. To aggregate the individual judgments of experts, the literature suggests taking a geometric mean [58] or an arithmetic mean [59]. By taking the geometric mean, pairwise comparisons were identified, along with various strategies that can be used to evaluate specific attributes.
Figure 2.
Details of the experts (a) Expertise (b) Education (c) Experience.
Satty et al. [60] presented a nine-point relative scale. The given scale assigns numeric values to denote the importance of options in a decision-making context. A score of 1 implies equal importance, while 3, 5, 7, and 9 indicate increasing levels of importance for one option over the other. Intermediate judgments are expressed using even numbers (2, 4, 6, 8). Pairwise comparisons are made according to this scale. Table 3 shows the questionnaire section for pairwise comparison of criteria. A similar format is utilized for pairwise comparison of sub-criteria. Another section of the final questionnaire asks the experts to suggest strategies that can be used to substantiate the identified factors.
Table 3.
Questionnaire section for the relative importance of Criteria.
4. Results and Discussion
This section presents an AHP analysis of the data collected from questionnaire surveys, along with an in-depth analysis of the findings. The proposed framework uses the Analytical Hierarchy Process (AHP) model for the selection of a maintenance contractor and strategies for evaluating the identified attributes. Utilizing AHP, weights can be assigned to the identified factors derived from the literature review.
4.1. Pairwise Matrices
Through a pairwise comparison, a matrix is created where the diagonal values are equal to 1 and the off-diagonal values are reciprocal of each other, implying that if factor j is “1/q times” as important as factor i, then factor i is “q times” as important as component j. To determine the weights of criteria and attributes for selecting a maintenance contractor, the five criteria and subfactors in each category are compared with each other by the experts using a nine-point scale. Their priorities are calculated, and a matrix is formed resulting from this pairwise comparison. Matrix is shown in Table 4, Table 5, Table 6, Table 7, Table 8 and Table 9, showing their sub criteria. These matrices are formed after taking the geometric mean of the answers given by the experts.
Table 4.
Pairwise matrix of criteria.
Table 5.
Pairwise matrix of work approach attributes.
Table 6.
Pairwise comparison of experience attributes.
Table 7.
Pairwise comparison of past performance attributes.
Table 8.
Pairwise comparison of personal record and resource attributes.
Table 9.
Pairwise comparison of financial and legal status attributes.
4.2. Normalization and Weight Calculation
In normalization, matrix values are normalized to accurately calculate the weights of criteria and attributes. Normalization is applied to make the data comparable or to bring it to a common scale. Normalization involves summing the columns of the matrix, and then each element of the matrix for a given column is divided by the sum of that column [61]. Equations (1) and (2) show an example of the process of normalization for Table 4, resulting in Table 10.
Table 10.
Normalized matrix for criteria.
Table 10, Table 11, Table 12, Table 13, Table 14 and Table 15 show the normalized matrices. After normalization of matrices, the weights of attributes are calculated, considering both their criteria and the overall goal of the study. These weights are known as local weights and global weights, respectively. If an attribute is a sub-criterion, then the local weight of that attribute shows its importance with respect to its specific criteria. After local weights are calculated, the next step is to calculate the weight of the attribute with respect to the main goal. If an attribute is a criteria, then its global weight is its importance with respect to the main goal of the study. The score for the criteria is given by Equation (3). Equation (4) shows an example of a score calculation for the work approach in Table 10. Similarly, local weights of sub-criteria are calculated. The global weight of a sub-criteria is given by [62]. The local and global weights of criteria and attributes are shown in Table 16 in descending order according to weights.
Table 11.
Normalized matrix for work attribute.
Table 12.
Normalized matrix for experience.
Table 13.
Normalized matrix for past performance.
Table 14.
Normalized matrix for personal record and resources.
Table 15.
Normalized matrix for financial and legal status.
Table 16.
Local and Global weightages.
4.3. Consistency Check
For matrices of 3 × 3 or larger size in AHP, it is important to perform consistency checks to ensure that judgment for decision making is of high consistency [61]. This process starts with calculating λmax value using pairwise comparison data and the final scores of criteria and attributes. The consistency index (CI) is then calculated using the λmax, and then this index is compared with a random index to assess the rationality of the evaluator’s pairwise comparisons. The requirement states that the consistency ratio should not be more than 10% or 0.1 [63].
where:
CI = Consistency Index
CR = Consistency Ratio
IR = Index Random Consistency
λmax = Maximum eigenvalue
n = Number of elements in criteria/sub-criteria
IR values are given by Saaty [64]. When n equals 1 and 2, the reciprocal index (RI) value is 0. As n increases, RI varies with values such as 0.58 for n = 3, 0.89 for n = 4, 1.12 for n = 5, 1.24 for n = 6, 1.32 for n = 7, 1.41 for n = 8, and 1.45 for n = 9. The consistency ratio of the criteria matrix and sub-criteria matrices of pairwise comparison are all checked based on Equations (5)–(7). CR is within the range, i.e., less than 0.1.
The consistency ratio of the criteria matrix is shown in Table 17 and Equation (12). The weighted sum and eigenvalue are calculated for each criteria/sub-criteria as shown in Equations (8)–(11) [62,65]. In a similar manner, the CR of sub-criteria is calculated with local scores as their weighted scores.
Table 17.
Consistency check for criteria using eigenvalue.
From Equations (5)–(7), CR is less than 0.1.
4.4. Substantiation Strategies
To help in the evaluation of attributes, the study also gives substantiation guidelines for the above attributes. The evaluation strategies have been identified through a survey questionnaire with seven experts. The evaluation strategies will help the decision makers assign scores to attributes easily and make the selection process more reliable and time-saving. The evaluation strategies for all 17 attributes are given in Table 18.
Table 18.
Substantiation strategies.
4.5. BV-Substantiated Framework
The final model represents the criteria along with attributes and their percentage weights, along with substantiation strategies, as illustrated in Figure 3. It has been observed that the criteria “Past Performance” is the most significant, holding 23.5% weight. This highlights that a maintenance contractor’s previous work is a major deciding factor in the selection process, suggesting that contractors should emphasize their past project successes to stand out in competitive bids. Among its sub-criteria, performance in a similar type of project holds 6% of the weight. Limiting the past performance evaluation to maintenance projects of similar scale and complexity ensures a more relevant assessment of the contractor’s capability for the current project. Refining past performance evaluation by assessing previous work quality, client satisfaction, and work safety record establishes specific sub-criteria, enhancing the assessment. Following past performance, the second most important criteria in the selection of a maintenance contractor is “Experience”, which holds 21.8% of the total weightage. Experience includes general work experience, availability of technical staff, experience of similar works, and employee qualification. Among the experience sub-criteria, the availability of technical staff holds the most importance at 9%, showing that the importance of skilled technical labor and employees is the most important factor to consider for maintenance work. General experience holds 4%, similar project experience holds 6%, and employee qualification holds 7%. “Work Approach” is the third, with 21% of the total weightage. Having attributes like a proposed maintenance plan and understanding client and project needs shows how important it is to understand the work to formulate a proper execution plan.
Figure 3.
Best value framework.
According to the global weights of attributes shown in Figure 3, the attribute ‘Understanding of Client and Project Needs’ holds the highest importance at 13% of the total weightage. This shows that understanding the project requirements and client requirements is significant to proceed further accordingly. Following this, having inventory in stock for maintenance work is crucial. Having the required machinery, equipment, and supplies not only saves cost but also time. The third key attribute is the availability of technical staff, which has a global weight of 11%. It emphasizes the need for skilled personnel to carry out the work efficiently and safely. To assist in evaluating these attributes, the study provides guidelines developed through a questionnaire survey with experts. The evaluation strategies will help the decision makers assign a specific score to attributes and make the selection process more reliable and time-saving. The final framework shows the documents that will help in the substantiation of attributes in front of each attribute along with their percentages, e.g., for attribute “understanding client need”, the documents required to be evaluated are “tender documents and technical proposal” along with subsequent meetings. This approach helps in assessing the contractor’s grasp of project requirements. Similarly, the “experience” of a contractor can be assessed through a list of completed projects. This documented evidence helps evaluators accurately assign scores to contractors in the AHP selection model. Overall, these substantiation strategies simplify the adoption of the best value criteria model, making it more practical for selecting maintenance contractors. Figure 4 shows the global weights of attributes.
Figure 4.
Global weightages.
The developed framework for maintenance contractor selection, employing the Analytic Hierarchy Process (AHP), presents a systematic decision-making approach. The identified criteria, encompassing past performance, experience, work approach, personal record, and financial/legal considerations, collectively contribute to a comprehensive evaluation process. In addition to their direct application in the selection process, this framework’s findings have the potential to influence broader industry practices. By establishing benchmarks, improving risk mitigation strategies, underscoring the significance of client–contractor relationships, and promoting transparency and accountability, the framework becomes a valuable tool for organizations seeking enhanced decision making in contractor selection processes. It contributes to the ongoing discourse on effective decision making within industry.
5. Conclusions
Maintenance plays an important role in prolonging the life of buildings and their facilities. Proper maintenance not only keeps a building in good condition but also prevents major issues down the line. It acts as a preventative measure against gradual degradation that can compromise a building’s functionality and safety. In extreme cases, a lack of maintenance can result in the premature failure of building components. By periodically maintaining a building, we can mitigate the risk of costly and unforeseen repairs. To ensure proper maintenance, choosing the right maintenance contractor is essential.
Therefore, this study proposed a contractor selection framework that identified the attributes required in contractor selection and assigned weights to them through the process of AHP. The proposed framework uses a best-value selection approach and considers wider criteria like experience, past work, and cost-effectiveness. This study has made the following contributions: (1) Identification of the factors influencing the selection criteria of maintenance contractors. (2) Developed a framework for employing maintenance contractors. (3) Devised strategies to aid owners in substantiating factors in the best-value process.
In conclusion, the framework presented in this study offers a comprehensive and reliable approach for selecting maintenance contractors. The application of the Analytical Hierarchy Process (AHP) in the maintenance contractor selection process, informed by a comprehensive literature review, not only refines the understanding of best-value criteria but also provides a framework that can be adapted and extended to similar decision-making contexts. It ensures an optimal balance of cost, experience, and performance while bringing clarity into the process. The proposed framework holds practical utility for project managers, procurement professionals, and decision makers involved in maintenance contractor selection. The detailed substantiation strategies derived from expert judgments and the emphasis on past performance criteria offer tangible guidance for practitioners. This approach not only enhances the decision-making process but also ensures a more informed and strategic selection of maintenance contractors, optimizing both value and efficiency, ultimately contributing to the longevity and sustainability of building projects.
However, there are limitations to using the Analytical Hierarchy Process (AHP) for maintenance contractor selection. The study relies heavily on having access to good and reliable data, which can be challenging due to the dynamic and sometimes unpredictable nature of project-related information. Recognizing how quickly the construction industry changes with new technologies, regulations, and project needs is important. This could make the proposed framework difficult to stay relevant and effective over time. In the future, there is a need to establish a systematic process for continuous refinement of the framework. Continuously evaluating and updating the criteria and parameters of the AHP-based model will ensure its adaptability to the changing construction industry landscape. This iterative approach will ensure that the framework remains relevant and effective over time. Additionally, the framework has not been applied in any case studies in the proposed paper. This presents an opportunity for future research to explore and work on this aspect.
Author Contributions
M.U.Z. carried out conceptualization, worked on methodology, writing-original draft, validation, and funding acquisition. O.F. conducted formal analysis, data curation, and the writing-original draft. M.U.H. was responsible for writing-review and editing, validation, and investigation. T.A. was associated with formal analysis, validation, and writing-review and editing. S.U.-D. did project administration, data curation, and validation. All authors have read and agreed to the published version of the manuscript.
Funding
This work was supported by the Deanship of Scientific Research, Vice Presidency for Graduate Studies and Scientific Research, King Faisal University, Saudi Arabia (Project No. GRANT5976). The APC was funded by the same “Project No. GRANT5976”.
Institutional Review Board Statement
Not applicable.
Informed Consent Statement
Informed consent was obtained from all subjects involved in the study.
Data Availability Statement
The data presented in this study are available on request from the corresponding author.
Acknowledgments
The authors acknowledge the Deanship of Scientific Research, Vice Presidency for Graduate Studies and Scientific Research, King Faisal University, Saudi Arabia (Project No. GRANT5976). The authors extend their appreciation for the financial support that has made this study possible.
Conflicts of Interest
The authors declare no conflicts of interest.
References
- Musa, Z.N.; Wan Abd Aziz, W.N.A.; Zyed, Z.A.S.; Hanif, N.R.; Mohd Aini, A.; Tedong, P.A.; Sarip, A.G. Vertical living satisfaction of homeowners in a medium-cost residential building in Klang Valley, Malaysia. J. Facil. Manag. 2020, 18, 283–296. [Google Scholar] [CrossRef] [Scilit]
- Au-Yong, C.P.; Ali, A.S.; Chua, S.J.L. A literature review of routine maintenance in high-rise residential buildings: A theoretical framework and directions for future research. J. Facil. Manag. 2019, 17, 2–17. [Google Scholar] [CrossRef] [Scilit]
- Au-Yong, C.P.; Azmi, N.F.; Mahassan, N.A. Maintenance of lift systems affecting resident satisfaction in low-cost high-rise residential buildings. J. Facil. Manag. 2018, 16, 17–25. [Google Scholar] [CrossRef] [Scilit]
- Lam, E.W.; Chan, A.P.; Chan, D.W. Benchmarking success of building maintenance projects. Facilities 2010, 28, 290–305. [Google Scholar] [CrossRef] [Scilit]
- El-Haram, M.A.; Marenjak, S.; Horner, M.W. Development of a generic framework for collecting whole life cost data for the building industry. J. Qual. Maint. Eng. 2002, 8, 144–151. [Google Scholar] [CrossRef] [Scilit]
- Wood, B. Towards innovative building maintenance. Struct. Surv. 2005, 23, 291–297. [Google Scholar] [CrossRef] [Scilit]
- Peng, A.Y.C. The Relationship between Preventive Maintenance Characteristics and the Maintenance Performance of High-Rise Office Buildings in Malaysia. 2013. Available online: https://core.ac.uk/download/268877054.pdf (accessed on 2 November 2023).
- Tayeh, B.A.; Al-Hallaq, K.; Yusuf, M.O.; Sabha, F. Effects of construction phase errors on maintenance of school buildings in Gaza Strip. Int. J. Manag. Inf. Technol. Eng. (BEST IJMITE) 2017, 5, 21–34. [Google Scholar]
- Jaskowski, P.; Biruk, S.; Bucon, R. Assessing contractor selection criteria weights with fuzzy AHP method application in group decision environment. Autom. Constr. 2010, 19, 120–126. [Google Scholar] [CrossRef] [Scilit]
- Olaniran, O.J. The effects of cost-based contractor selection on construction project performance. J. Financ. Manag. Prop. Constr. 2015, 20, 235–251. [Google Scholar] [CrossRef] [Scilit]
- Zavadskas, E.K.; Vilutienė, T. A multiple criteria evaluation of multi-family apartment block’s maintenance contractors: I—Model for maintenance contractor evaluation and the determination of its selection criteria. Build. Environ. 2006, 41, 621–632. [Google Scholar] [CrossRef] [Scilit]
- Huang, X. An analysis of the selection of project contractor in the construction management process. Int. J. Bus. Manag. 2011, 6, 184. [Google Scholar] [CrossRef] [Scilit]
- Cheng, E.W.L.; Li, H. Contractor selection using the analytic network process. Constr. Manag. Econ. 2004, 22, 1021–1032. [Google Scholar] [CrossRef] [Scilit]
- Singh, D.; Tiong, R. A Fuzzy Decision Framework for Contractor Selection. J. Constr. Eng. Manag. 2005, 131, 62–70. [Google Scholar] [CrossRef] [Scilit]
- Hosny, O.; Nassar, K.; Esmail, Y. Prequalification of Egyptian construction contractors using fuzzy-AHP models. Eng. Constr. Archit. Manag. 2013, 20, 381–405. [Google Scholar] [CrossRef] [Scilit]
- Xia, B.; Chan, A.; Zuo, J.; Molenaar, K. Analysis of selection criteria for design-builders through the analysis of requests for proposal. J. Manag. Eng. 2013, 29, 19–24. [Google Scholar] [CrossRef] [Scilit]
- De Araújo, M.C.B.; Alencar, L.H.; de Miranda Mota, C.M. Project procurement management: A structured literature review. Int. J. Proj. Manag. 2017, 35, 353–377. [Google Scholar] [CrossRef] [Scilit]
- Chen, Z.-S.; Zhang, X.; Rodríguez, R.M.; Pedrycz, W.; Martínez, L. Expertise-based bid evaluation for construction-contractor selection with generalized comparative linguistic ELECTRE III. Autom. Constr. 2021, 125, 103578. [Google Scholar] [CrossRef] [Scilit]
- Zavadskas, E.K.; Kaklauskas, A.; Vilutiene, T. Multicriteria evaluation of apartment blocks maintenance contractors: Lithuanian case study. Int. J. Strateg. Prop. Manag. 2009, 13, 319–338. [Google Scholar] [CrossRef] [Scilit]
- Hadidi, L.A.; Khater, M.A. Loss prevention in turnaround maintenance projects by selecting contractors based on safety criteria using the analytic hierarchy process (AHP). J. Loss Prev. Process Ind. 2015, 34, 115–126. [Google Scholar] [CrossRef] [Scilit]
- Zubair, M.U.; Zhang, X. Investigation and Improvements of the Existing Best-Value Selection Criteria for Elevator Maintenance Contractors. J. Manag. Eng. 2022, 38, 04021083. [Google Scholar] [CrossRef] [Scilit]
- Chau, C.K.; Sing, W.; Leung, T. An analysis on the HVAC maintenance contractors selection process. Build. Environ. 2003, 38, 583–591. [Google Scholar] [CrossRef] [Scilit]
- Adhikary, P.; Roy, P.; Mazumdar, A. Maintenance Contractor Selection for Small Hydropower Project: A Fuzzy Multi-Criteria Optimization Technique Approach. Int. Rev. Mech. Eng. 2015, 9, 174–181. [Google Scholar] [CrossRef] [Scilit]
- Fawzy, M.M.; Elsharkawy, A.S.; Khalifa, Y.A.; Hassan, A.A. Contractor selection by using multi-criteria decision-making for Egyptian road maintenance. Int. J. Syst. Assur. Eng. Manag. 2024. [Google Scholar] [CrossRef] [Scilit]
- Bertolini, M.; Bevilacqua, M.; Braglia, M.; Frosolini, M. An analytical method for maintenance outsourcing service selection. Int. J. Qual. Reliab. Manag. 2004, 21, 772–788. [Google Scholar] [CrossRef] [Scilit]
- Hasnain, M.; Thaheem, M.J.; Ullah, F. Best Value Contractor Selection in Road Construction Projects: ANP-Based Decision Support System. Int. J. Civ. Eng. 2017, 16, 695–714. [Google Scholar] [CrossRef] [Scilit]
- Le, C.; Jeong, H.D.; Le, T.; Kang, Y. Evaluating contractors’ production performance in highway projects using historical daily work report data. J. Manag. Eng. 2020, 36, 04020015. [Google Scholar] [CrossRef] [Scilit]
- Lines Brian, C.; Nguyen Phuong, H.D.; Kakarapalli, R. An Empirical Analysis of Project Performance Outcomes for Best-Value Procurement in Design–Bid–Build Projects. J. Manag. Eng. 2021, 37, 04021005. [Google Scholar] [CrossRef] [Scilit]
- Yu, W.-d.; Wang, K.-W. Best value or lowest bid? A quantitative perspective. J. Constr. Eng. Manag. 2012, 138, 128–134. [Google Scholar] [CrossRef] [Scilit]
- Nguyen, P.H.; Lines, B.C.; Tran, D.Q. Best-value procurement in design-bid-build construction projects: Empirical analysis of selection outcomes. J. Constr. Eng. Manag. 2018, 144, 04018093. [Google Scholar] [CrossRef] [Scilit]
- Gransberg, D.D.; Shane, J.S. Defining best value for construction manager/general contractor projects: The CMGC learning curve. J. Manag. Eng. 2015, 31, 04014060. [Google Scholar] [CrossRef] [Scilit]
- Darko, A.; Chan, A.P.C.; Ameyaw, E.E.; Owusu, E.K.; Pärn, E.; Edwards, D.J. Review of application of analytic hierarchy process (AHP) in construction. Int. J. Constr. Manag. 2019, 19, 436–452. [Google Scholar] [CrossRef] [Scilit]
- Zavadskas, E.; Turskis, Z.; Vilutienė, T. Simulation of multi-criteria selection of buildings’ maintenance contractor using the game theory. Comput. Model. New Technol. 2005, 9, 7–16. [Google Scholar]
- Hadikurniawati, W.; Winarno, E.; Cahyono, T.; Abdullah, D. Comparison of AHP-TOPSIS Hybrid Methods, WP and SAW for Multi-Attribute Decision-Making to Select The Best Electrical Expert. J. Phys. Conf. Ser. 2018, 1114, 012100. [Google Scholar] [CrossRef] [Scilit]
- Oguztimur, S. Why Fuzzy Analytic Hierarchy Process Approach for Transport Problems? 2011. Available online: https://www.researchgate.net/publication/254457609_WHY_FUZZY_ANALYTIC_HIERARCHY_PROCESS_APPROACH_FOR_TRANSPORT_PROBLEMS (accessed on 10 November 2023).
- Assaf, S.; Hassanain, M.A.; Al-Hammad, A.M.; Al-Nehmi, A. Factors affecting outsourcing decisions of maintenance services in Saudi Arabian universities. Prop. Manag. 2011, 29, 195–212. [Google Scholar] [CrossRef] [Scilit]
- Araújo, M.; Alencar, L.H.; Mota, C.M. Decision criteria for contractor selection in construction industry: A literature review. In Proceedings of the 2018 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM), Bangkok, Thailand, 16–19 December 2018; pp. 637–640. [Google Scholar] [CrossRef] [Scilit]
- Ahmed, S.M.; Kangari, R. Analysis of client-satisfaction factors in construction industry. J. Manag. Eng. 1995, 11, 36–44. [Google Scholar] [CrossRef] [Scilit]
- Enshassi, A.; Mohamed, S.; Modough, Z. Contractors’ selection criteria: Opinions of Palestinian construction professionals. Int. J. Constr. Manag. 2013, 13, 19–37. [Google Scholar] [CrossRef] [Scilit]
- Tan, Y.; Shen, L.; Langston, C.; Lu, W.; CHYam, M. Critical success factors for building maintenance business: A Hong Kong case study. Facilities 2014, 32, 208–225. [Google Scholar] [CrossRef] [Scilit]
- Al-Hammad, A.-M.; Assaf, S. Assessment of work performance of maintenance contractors in Saudi Arabia. J. Manag. Eng. 1996, 12, 44–49. [Google Scholar] [CrossRef] [Scilit]
- Arslan, G.; Kivrak, S.; Birgonul, M.T.; Dikmen, I. Improving sub-contractor selection process in construction projects: Web-based sub-contractor evaluation system (WEBSES). Autom. Constr. 2008, 17, 480–488. [Google Scholar] [CrossRef] [Scilit]
- Egemen, M.; Mohamed, A.N. Clients’ needs, wants and expectations from contractors and approach to the concept of repetitive works in the Northern Cyprus construction market. Build. Environ. 2006, 41, 602–614. [Google Scholar] [CrossRef] [Scilit]
- Naji, K.K.; Gunduz, M.; Falamarzi, M.H. Assessment of Construction Project Contractor Selection Success Factors considering Their Interconnections. KSCE J. Civ. Eng. 2022, 26, 3677–3690. [Google Scholar] [CrossRef] [Scilit]
- Bintoro, I.; Malani, R. Modelling of contractor selection using fuzzy-TOPSIS. In Proceedings of the 2017 5th International Conference on Electrical, Electronics and Information Engineering (ICEEIE), Malang, Indonesia, 6–8 October 2017; pp. 140–145. [Google Scholar] [CrossRef] [Scilit]
- Watt, D.; Kayis, B.; Willey, K. Identifying key factors in the evaluation of tenders for projects and services. Int. J. Proj. Manag. 2009, 27, 250–260. [Google Scholar] [CrossRef] [Scilit]
- Puri, D.; Tiwari, S. Evaluating the criteria for contractors’ selection and bid evaluation. Int. J. Eng. Sci. Invent. 2014, 3, 44–48. [Google Scholar]
- Topcu, Y.I. A decision model proposal for construction contractor selection in Turkey. Build. Environ. 2004, 39, 469–481. [Google Scholar] [CrossRef] [Scilit]
- Wireman, T. Developing Performance Indicators for Managing Maintenance. 2005. Available online: https://dl.mpedia.ir/e-books/10-[Terry-Wireman]Indicators-for-Managing-Maintenance[mpedia.ir].PDF (accessed on 20 November 2023).
- Banaitiene, N.; Banaitis, A. Analysis of criteria for contractors’ qualification evaluation. Technol. Econ. Dev. Econ. 2006, 12, 276–282. [Google Scholar] [CrossRef] [Scilit]
- Saaty, R.W. The analytic hierarchy process—What it is and how it is used. Math. Model. 1987, 9, 161–176. [Google Scholar] [CrossRef] [Scilit]
- Benfares, C.; Akhrif, O.; El Bouzekri El Idrissi, Y.; Hamid, K. Multi-Criteria Decision Making Semantic for Mental Healthcare. In Research Anthology on Mental Health Stigma, Education, and Treatment; IGI Global: Hershey, PA, USA, 2021; pp. 178–192. [Google Scholar] [CrossRef] [Scilit]
- Abudayyeh, O.; Zidan, S.; Yehia, S.; Randolph, D. Hybrid Prequalification-Based, Innovative Contracting Model Using AHP. J. Manag. Eng. 2007, 23, 88–96. [Google Scholar] [CrossRef] [Scilit]
- Tavares, R.; Tavares, J.M.; Parry-Jones, S.L. The use of a mathematical multicriteria decision-making model for selecting the fire origin room. Build. Environ. 2008, 43, 2090–2100. [Google Scholar] [CrossRef] [Scilit]
- Chou, J.-S.; Pham, A.-D.; Wang, H. Bidding Strategy to Support Decision-making by Integrating Fuzzy AHP and Regression-based Simulation. Autom. Constr. 2013, 35, 517–527. [Google Scholar] [CrossRef] [Scilit]
- Zhang, G.; Zou, P. Fuzzy Analytical Hierarchy Process Risk Assessment Approach for Joint Venture Construction Projects in China. J. Constr. Eng. Manag. 2007, 133, 771–779. [Google Scholar] [CrossRef] [Scilit]
- Pan, N.-F. Fuzzy AHP approach for selecting the suitable bridge construction method. Autom. Constr. 2008, 17, 958–965. [Google Scholar] [CrossRef] [Scilit]
- Meixner, O.; Haas, R. Wissensmanagement und Entscheidungstheorie. Theorien, Methoden, Anwendungen und Fallbeispiele. 2012. Available online: https://www.researchgate.net/publication/233952749_Wissensmanagement_und_Entscheidungstheorie_Theorien_Methoden_Anwendungen_und_Fallbeispiele (accessed on 21 November 2023).
- Forman, E.; Peniwati, K. Aggregating individual judgments and priorities with the analytic hierarchy process. Eur. J. Oper. Res. 1998, 108, 165–169. [Google Scholar] [CrossRef] [Scilit]
- Satty, G.; Blakeley, T.J.; Colbert, J.G. Computing and Logic, Mathematics and Language. 1988. Available online: https://www.jstor.org/stable/j.ctv2x8v8sf (accessed on 2 December 2023).
- Cahyapratama, A.; Sarno, R. Application of Analytic Hierarchy Process (AHP) and Simple Additive Weighting (SAW) methods in singer selection process. In Proceedings of the 2018 International Conference on Information and Communications Technology (ICOIACT), Yogyakarta, Indonesia, 6–7 March 2018; pp. 234–239. [Google Scholar] [CrossRef] [Scilit]
- Mu, E.; Pereyra-Rojas, M.; Mu, E.; Pereyra-Rojas, M. Understanding the analytic hierarchy process. In Practical Decision Making Using Super Decisions v3: An Introduction to the Analytic Hierarchy Process; Springer: Cham, Switzerland, 2018; pp. 7–22. Available online: https://www.researchgate.net/profile/Seyyed-Hossein-Jafari-Petroudi/post/how_do_we_compute_consistency_ratio/attachment/5a345dceb53d2f0bba44affb/AS%3A571976892809216%401513381326103/download/AHP-page13.pdf (accessed on 3 December 2023).
- Karapetrovic, S.; Rosenbloom, E. A quality control approach to consistency paradoxes in AHP. Eur. J. Oper. Res. 1999, 119, 704–718. [Google Scholar] [CrossRef] [Scilit]
- Saaty, T.L. Fundamentals of the analytic network process—Dependence and feedback in decision-making with a single network. J. Syst. Sci. Syst. Eng. 2004, 13, 129–157. [Google Scholar] [CrossRef] [Scilit]
- Milošević, A.; Milošević, M.R.; Milošević, D.M.; Selimi, A. AHP multi–criteria method for sustainable development in construction. In Proceedings of the 4th International Conference: Contemporary Achievements in Civil Engineering, Subotica, Serbia, 22 April 2016. [Google Scholar] [CrossRef] [Scilit]
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content. |
© 2024 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/).