Behind-the-meter (BTM) generation is growing rapidly worldwide. Peak demand can be significantly reduced through the increasing installation of rooftop photovoltaic (PV) systems and battery energy storage systems (BESSs). The rate of this reduction is expected to increase with the quality of the solar resource. Transmission expansion plans can therefore benefit from avoided and deferred investment, which must be properly evaluated. These savings, from infrastructure no longer needed, can be passed on to end users through lower network tariffs. This article presents a new methodology for valuing the transmission investment deferred or avoided by BTM generation. BTM generation is represented as a nodal reduction in annual peak demand in static and multi-period DC mixed-integer linear expansion models, and a BTM Index (BTMI) ranks the nodes (substations) where BTM deployment should be promoted. Applied to the Garver system and the Colombian 500 kV backbone, the methodology shows that the required transmission investment decreases as BTM penetration grows, and that part of it is postponed: in Colombia, a 5% penetration removes 30% of the base plan, and final penetrations of 10% and 20% reduce its present value by 27.5% and 53.7%, respectively.