Zhao, M.; Wang, X.; Yu, J.; Bi, L.; Xiao, Y.; Zhang, J.
Optimization of Construction Duration and Schedule Robustness Based on Hybrid Grey Wolf Optimizer with Sine Cosine Algorithm. Energies 2020, 13, 215.
https://doi.org/10.3390/en13010215
AMA Style
Zhao M, Wang X, Yu J, Bi L, Xiao Y, Zhang J.
Optimization of Construction Duration and Schedule Robustness Based on Hybrid Grey Wolf Optimizer with Sine Cosine Algorithm. Energies. 2020; 13(1):215.
https://doi.org/10.3390/en13010215
Chicago/Turabian Style
Zhao, Mengqi, Xiaoling Wang, Jia Yu, Lei Bi, Yao Xiao, and Jun Zhang.
2020. "Optimization of Construction Duration and Schedule Robustness Based on Hybrid Grey Wolf Optimizer with Sine Cosine Algorithm" Energies 13, no. 1: 215.
https://doi.org/10.3390/en13010215
APA Style
Zhao, M., Wang, X., Yu, J., Bi, L., Xiao, Y., & Zhang, J.
(2020). Optimization of Construction Duration and Schedule Robustness Based on Hybrid Grey Wolf Optimizer with Sine Cosine Algorithm. Energies, 13(1), 215.
https://doi.org/10.3390/en13010215