Skip to Content
Applied SciencesApplied Sciences
  • Article
  • Open Access

18 March 2026

17 Pages

Real-Time Mechanical Modeling for Bridge Construction Based on Digital Twins and Parameter Inversion

,
,
,
,
and
1
Jiangxi Ganyue Expressway Co., Ltd., Nanchang 330025, China
2
School of Infrastructure Engineering, Nanchang University, Nanchang 330031, China
*
Author to whom correspondence should be addressed.

Abstract

Real-time mechanical analysis within digital twin (DT) systems requires high-fidelity models that synchronize with the “as-built” state of physical structures. This paper proposes a technical framework for constructing a “mechanical-core” DT by integrating computer vision (CV) sensing with automated finite element model (FEM) updating. Utilizing the Midas API, we developed a platform that automates data acquisition, modeling, and parameter inversion. A momentum-based optimization algorithm is implemented to invert the instantaneous elastic modulus of bridge segments during cantilever construction. The system was validated through a case study of a continuous box-girder bridge. Quantitative results indicate that the initial theoretical model, based on design-phase assumptions, exhibited a mean relative error of approximately 21.9% in vertical displacement. Following the real-time parameter inversion, this error was significantly reduced to less than 0.2% across all monitored construction stages. The rapid convergence (typically within three iterations) and the substantial increase in predictive accuracy demonstrate that the proposed framework effectively bridges the gap between raw sensing data and structural analysis, providing a reliable basis for proactive engineering decision-making.

1. Introduction

With the deepening advancement of the “Industry 4.0” paradigm, the construction industry is accelerating its transformation towards intelligence and lean practices [1,2,3,4]. As a core driver of digital transformation, Digital Twin (DT) technology—since the concept was proposed by Grieves and applied by NASA in the aerospace field [5,6]—has gradually become a crucial link connecting the physical world with the virtual space. Compared with traditional Building Information Modeling (BIM), which focuses on static data integration and geometric representation, digital twins emphasize real-time data interaction, dynamic mapping, and feedback control between physical entities and virtual models [7,8]. In the field of bridge engineering, this characteristic offers a new pathway for multi-source data fusion, precise state prediction, and decision optimization in complex construction scenarios.
Currently, the exploration of DT technology in the transportation infrastructure sector presents a multi-dimensional development trend, primarily concentrating on three aspects: top-level architecture design, health monitoring during the operation phase, and visual virtual construction. Regarding architecture design, Yang [9] addressed the challenge of fusing multi-source heterogeneous data by proposing a DT technical architecture for transportation infrastructure that covers data acquisition, transmission, and processing, laying a platform foundation for collaborative management. In terms of operational health monitoring, Chang et al. [10] utilized massive data from Structural Health Monitoring (SHM) systems to construct a bridge DT system driven by measured traffic flow loads and established a health evaluation system for cable-stayed bridges based on limit states, effectively enhancing the intelligence level of operation and maintenance management. Regarding construction and modeling, Wu et al. [11] developed a fully parametric intelligent modeling method, achieving 3D visual delivery of bridge models. Zhou [12] built a virtual construction platform for long-span bridges, providing safety rehearsal support for complex construction processes. However, as pointed out by Mihai [13], current bridge DTs generally suffer from being “heavy on geometric appearance but light on the mechanical core”. Existing systems predominantly rely on manual data entry or static BIM overlays, which creates an operational disconnect between high-frequency sensing and structural analysis [14]. Specifically, the technical gap lies in three areas: (i) the high latency in translating raw monitoring data into executable Finite Element Model (FEM) inputs; (ii) the lack of a closed-loop mechanism that automates the modeling of complex construction stages (e.g., segment hanging and prestress tensioning); and (iii) the computational burden of traditional inversion algorithms that struggle to achieve near-instantaneous convergence during active construction cycles [15,16]. Consequently, transitioning DTs from “visual representation” to “practical utility” requires a seamless, automated pipeline that bridges these functional silos.
In the cantilever construction process of bridges, especially large-span prestressed concrete continuous beam bridges, structural safety and alignment accuracy are highly dependent on the precise mastery of core mechanical parameters (e.g., concrete elastic modulus, material unit weight, instantaneous prestress loss) [17,18]. However, these parameters exhibit significant time-varying characteristics and uncertainty. On the one hand, as a heterogeneous material, the elastic modulus of concrete evolves dynamically with the hydration heat reaction and curing time. On the other hand, due to the huge difference between the temperature and humidity environment at the construction site and standard laboratory curing conditions, material parameters measured based on laboratory test blocks often lag behind and deviate from the actual performance of the girder body, resulting in a typical “discrepancy between sample and entity”. If design parameters or laboratory parameters are directly used to drive the DT model, the finite element analysis results will be seriously distorted compared to the real state of the entity, thereby misleading construction decisions [19,20]. Therefore, moving away from reliance on offline design parameters and utilizing real-time response data from the construction site to deduce intrinsic structural mechanical parameters through parameter inversion technology—thereby constructing a “real-time mechanical model” that reflects the true physical state of the structure—is the core prerequisite for achieving high-precision closed-loop control of digital twins.
To obtain accurate structural parameters, the FEM updating method has become a bridge connecting theoretical models with engineering entities and has accumulated rich results in the field of damage identification. Zhang et al. [21] proposed a regularized model updating method combining wavelet denoising to address noise interference in modal parameters, significantly improving the robustness of structural damage identification. Combining the substructure FEM updating method with the response surface model updating method, Shan et al. [22] proposed a FEM updating method of bridge structure for updating the FEM of a certain combined cable-stayed suspension model bridge. To improve the efficiency and accuracy of FEM calibration, Zhang et al. [23] introduced a surrogate model-based Bayesian updating framework, which optimizes the FEM calibration process in motor design by reducing computational burden and enhancing prediction accuracy. However, these traditional updating methods are mostly applied to offline analysis after the structure is built or for damage diagnosis at specific moments. They typically rely on contact-based, low-frequency traditional measurement data (such as total stations), making it difficult to meet the stringent requirements of “real-time” and “automation” for DT systems [24]. While non-contact high-frequency visual measurement has emerged as a promising tool for structural deformation capture, its integration into the ‘digital twin loop’ remains fragmented. Recent studies have explored CV for localized displacement monitoring [25] and surface crack detection [26], yet there is a significant lack of research on the automated, multi-tier synchronization between machine vision data streams and full-scale finite element engines like Midas Civil in a real-time environment [27,28,29]. Most current applications still require manual data pre-processing or secondary modeling, which fails to meet the operational demands of dynamic construction control [30,31]. This study addresses this reproducible software architecture gap by establishing a direct communication bridge between vision-based perception and finite element calculation.
In view of this, this paper proposes a bridge construction DT system framework based on parameter inversion functions. This study aims to break through the limitations of traditional construction monitoring, such as “lagging monitoring and difficult model updates”. The specific contributions are as follows:
(1)
Introducing machine vision technology as a means of physical perception to solve the problem of poor timeliness in traditional measurement data;
(2)
Developing an automated simulation engine using Midas API to eliminate manual intervention in stage-by-stage mechanical modeling;
(3)
Implementing an online parameter inversion pipeline driven by a momentum optimization algorithm, which allows for the instantaneous updating of the mechanical core (e.g., elastic modulus) during balanced cantilever construction.
The system achieves a high-fidelity fusion of physical entities and virtual models in terms of geometry, physics, and behavior, providing a precise theoretical basis and technical support for intelligent decision-making in the bridge construction process.
The remainder of this paper is organized as follows: Section 2 introduces relevant basic theories and methods; Section 3 presents the overall framework and algorithmic implementation of the proposed method; Section 4 verifies the effectiveness and superiority of the method through an engineering case study; Section 5 summarizes the full text and looks forward to future research directions.

2. Model Modification Theory

FEM updating methods are generally categorized into two types, each with a distinct focus. Parametric updating targets the structural physical parameters. It solves for optimal parameters based on the mapping of “parameter-response error”. This method possesses clear physical significance and requires low computational volume, making it suitable for small-to-medium structures and scenarios requiring high interpretability. However, it is prone to non-unique solutions when multiple parameters are coupled. Matrix updating, on the other hand, directly adjusts core matrices such as stiffness and mass without requiring prior information on physical parameters. While it adapts well to large, complex structures and scenarios involving matrix distortion, the updating process lacks clear physical meaning and involves high computational cost. Consequently, it is less commonly applied today.
During the deflection monitoring of cantilever box girder construction, the pre-camber for each construction segment must be calculated. This first requires establishing an ideal model based on the design drawings [32]. Subsequently, parameter identification theories are employed to reduce the discrepancy between the design structural parameters and the actual structural parameters, thereby minimizing the error between the model response and the actual bridge response.
Based on experience, the parameters initially selected for updating primarily include cross-sectional geometric dimensions, concrete material density, concrete elastic modulus, and concrete shrinkage and creep effects. These are then filtered according to the actual construction conditions and sensitivity analysis to identify the parameters that have a significant impact on the actual bridge response as the final targets for updating. These uncertain parameters are treated as unknown variables and identified in a timely manner at different construction stages. The updated parameter results are then substituted into the analysis calculation for the next stage [33]. Through repeated cycles of calculation and measurement correction over several construction stages, the parameter values of the system model gradually approach their true values. This process ensures the model is precise, reasonable, and reflective of the actual situation.
Using a specific difference between test results and calculation results (such as nodal displacement difference) as the optimization objective, appropriate constraints are introduced to optimize relevant structural parameters (e.g., concrete elastic modulus, prestress magnitude, concrete creep parameters). This ensures the optimization results reflect the true state of the actual structural parameters. Optimization is defined as a mathematical method for selecting the most reasonable scheme from all possible options to achieve an optimal goal. Thus, parametric finite element model updating can ultimately be reduced to a constrained optimization problem, which can be solved using constrained optimization theory [34]. The objective function f ( x ) is defined as the weighted sum of squared residuals between the measured structural responses and the FEM outputs:
f ( x ) = ∑ j = 1 m w j y j m e a s − y j c a l c x 2
where x = x 1 ,   x 2 , … ,   x n T is the vector of parameters to be updated (e.g., elastic modulus); y j m e a s represents the displacement at the j-th measurement point captured by computer vision; y j c a l c ( x ) is the corresponding displacement calculated by the FEM given the parameter set x ; w j is the weighting factor for the j-th observation; and m is the total number of measurement points.
The updated parametric FEM optimization is thus formulated as a constrained optimization problem:
min f ( x )
Subject to:
x i m i n ≤ x ≤ x i m a x , i = 1,2 , 3 , … , n
g i x ≤ g i m a x , i = 1,2 , 3 , … , m 1
h i m i n ≤ h i x , i = 1,2 , 3 , … , m 2
w i m i n ≤ w i x ≤ w i m a x , i = 1,2 , 3 , … , m 3
where x i represents the parameters to be updated; g i , h i , and w i are state variables; and m 1 , m 2 , and m 3 are the numbers of state variables following different upper and lower bound constraints.
Convergence is achieved when the change in the objective function value between the current update cycle and the previous cycle is less than the objective function tolerance. Alternatively, it is achieved when the difference between the target update value and the current objective function value is less than the tolerance. These conditions are expressed as:
f n − f n − 1 ≤ ε
f n − f b ≤ ε
where ε is the objective function tolerance, set to a relatively small value.
Based on constrained optimization theory, commonly used optimization methods are primarily classified into zero-order methods and first-order methods.
  • Zero-order methods, also known as “derivative-free optimization methods”, perform optimization searches using only the function values of the objective function (and constraint functions) without involving any first-order (or higher-order) derivative calculations. This approach has the advantage of strong versatility, but its disadvantage is relatively lower optimization precision.
  • First-order methods, also known as “gradient optimization methods”, utilize the first-order partial derivative (gradient) information of the objective function (and constraint functions) to guide the search direction, thereby achieving optimization approximation. This method offers high precision, particularly yielding better results when the dependent variables vary significantly and the design space is relatively large.
This paper adopts the momentum method, a first-order method, for the optimization of the FEM. The flowchart of the model updating process combined with the momentum method is shown in Figure 1.
Figure 1. Flowchart of the momentum method model correction process.

3. Experimental Verification

Although definitions of DT systems vary across different application domains, they all share common characteristics: (1) a physical entity, (2) a virtual entity, and (3) the connection between the physical and virtual entities. These elements are regarded as the core components of a DT system. Communication between the physical and virtual entities is established through a bidirectional automated data connection. This allows the physical entity to transmit data or status updates to the virtual entity, while enabling the virtual entity to send commands or control the physical entity. Consequently, a DT system can be described as a virtual mapping of a physical system, maintaining synchronization with the physical entity through real-time data interaction.

3.1. System Architecture

Combining the concept of DTs with the five-dimensional DT structural model, this paper proposes a bridge DT system integrating parameter inversion functions. By combining DT technology with parameter inversion algorithms, this system achieves real-time mechanical analysis and calculation during bridge construction using input monitoring data. It further inverts the mechanical parameters of the bridge entity to accurately map the physical state in the virtual space. The architecture of this bridge DT system is designed as shown in Figure 2. The system structure primarily consists of three components: the Physical Entity Layer, the Twin Model Layer, and the Dynamic Interaction Layer.
Figure 2. System architecture diagram integrating parameter inversion functionality.
  • Physical Entity Layer: This layer includes information regarding the engineering physical entity and its various components, such as material properties and component dimensions. It also encompasses various sensing systems, such as stress meters, total stations, and thermometers, to realize real-time monitoring of environmental data and operational status. In particular, to address the challenge of real-time structural deformation capture during construction—where traditional contact-based sensors struggle to meet the requirements for full-field synchronous monitoring—this system introduces a machine vision module as a key sensing method within the Physical Entity Layer.
  • Twin Model Layer: This layer is composed of the twin model, twin data, and corresponding twin functions. The twin model includes the BIM model and the mechanical analysis model. Twin data comprises physical entity monitoring data and calculation result data. The twin functions involve real-time mechanical analysis and FEM updating modules developed in conjunction with the Dynamic Interaction Layer. These functions achieve high-frequency synchronization with the physical engineering entity and ensure high-fidelity mapping between the DT information model and the physical entity.
  • Dynamic Interaction Layer: Acting as the transmission artery of the DT, this layer manages data transmission and fusion between various system levels. It provides monitoring and simulation data for visualization and human–machine interaction interfaces, while supplying parameter sources for real-time mechanical analysis and FEM updating modules. This layer realizes data collection, simulation prediction, transmission, and algorithm fusion, supporting the operation of the DT through continuous data interaction, updating, and optimization.

3.2. Real-Time Perception of Structural Deformation Based on Machine Vision

In the process of bridge construction, accurate and high-frequency structural deformation data serve as the prerequisite for driving the DT model to perform parameter inversion and state updates. To overcome the time lag associated with traditional monitoring methods, this paper constructs a non-contact, multi-point synchronous monitoring system based on industrial machine vision. Integrated into the Physical Entity Layer, this system achieves millisecond-level capture of displacements at key bridge segment measurement points.
The core of machine vision monitoring lies in establishing an accurate mapping relationship between the 2D image pixel coordinate system and the 3D world coordinate system. The system adopts the Pinhole Imaging Model. By utilizing compact homogeneous notation, the relationship is expressed as:
s u = A R | t X w
where s is the scale factor; u = u , v , 1 T represents the projected pixel coordinates in homogeneous form; A is the camera intrinsic matrix containing the focal lengths and principal point; R | t is the extrinsic matrix representing the rotation and translation of the camera coordinate system; and X w = X w , Y w , Z w , 1 T denotes the world coordinates of the spatial measurement point P .
In the engineering field deployment, high-contrast black-and-white concentric circle artificial markers were installed at the corresponding girder top elevation measurement points. High-resolution industrial cameras were mounted on a relatively static platform in the construction area. Camera intrinsic parameters were pre-acquired using Zhang’s calibration method, and extrinsic parameters were solved using control points to construct a complete visual measurement space.
To ensure robustness under complex construction lighting environments, this study employs sub-pixel edge detection and template matching algorithms. The specific processing flow is as follows:
  • Image Preprocessing: Gaussian filtering is applied to the captured video stream frames to denoise sensor thermal noise and environmental dust interference, followed by binarization to highlight marker features.
  • Sub-pixel Localization: The Canny operator is used to extract marker edges. The ellipse center is fitted using the least squares method to obtain the sub-pixel coordinates ( u t , v t ) of the marker in the image, achieving a positioning accuracy of 0.01~0.05 pixels.
  • Displacement Calculation: Based on the pre-calibrated Homography Matrix, the time-series pixel coordinates of each point are converted to physical coordinates in real time. Letting P 0 be the initial coordinate at time t 0 and P i be the coordinate at current time   t i , the instantaneous displacement vector ∆ D can be calculated as: ∆ D = P i − P 0 .
While visual sensors offer the advantage of high-frequency sampling (typically >30 fps), environmental factors such as mechanical vibrations and atmospheric turbulence at the construction site inevitably introduce high-frequency noise. To mitigate this, a Moving Average Filter is integrated at the front end to smooth raw displacement time-history data, effectively isolating random errors while preserving the underlying structural deformation trends. Specifically, the system employs a hierarchical data architecture: raw image data is captured at 30 fps to ensure high-precision motion tracking through temporal filtering, whereas the processed displacement results are transmitted to the DT platform at a 1 Hz interval. This dual-frequency design strategically captures the quasi-static mechanical response of the cantilever bridge while optimizing the computational efficiency of the real-time parameter inversion engine.
The processed clean displacement data is no longer an offline file but is accessed as a real-time data stream into the digital twin system. The visual monitoring module encapsulates the three-directional displacement data of each point in JSON format, including Timestamp, Node ID, and Value, and pushes them to the twin platform database at a frequency of 1 Hz via the RESTful API described later. This not only provides high-timeliness input parameters for the parameter inversion algorithm but also ensures that the virtual model can reproduce the geometric morphological changes of the physical entity with zero latency.

3.3. Key Technologies and Functional Integration Methods for Digital Twins

Building upon the system architecture and the machine vision perception module described in the previous sections, this section proposes core technologies for data processing and interaction. It specifically elucidates the integration methods for mechanical analysis and parameter inversion functions within the DT system. The implementation steps specifically include: (1) API script development; (2) frontend-backend data interaction and command request processing; and (3) real-time frontend interface updates and functional module integration.
The platform adopts a RESTful API architecture with separated frontend and backend. The frontend utilizes HTML5 as the foundational structure and Tailwind CSS for styling. The backend is built upon Python 3.11’s Flask framework and the HTTP protocol, enabling data transmission and function invocation through well-defined interfaces (APIs). The API program controls the alteration of model calculation parameters and the execution of calculations by modifying parameters within JSON files. During the development of the API program for the parameter inversion function, the process follows the momentum method model updating workflow. Combined with Midas API operation commands, it achieves the automation of core processes, including finite element model parameter modification, post-modification calculation, convergence assessment, and iterative parameter adjustment and calculation. Data transmission between the frontend and backend, as well as programmatic data transfer—encompassing monitoring device data, calculation inputs, and output data—utilizes JSON or XML formatted files as bridges to realize real-time data transfer and updates.
Based on these rules, the fundamental path of data transmission is defined, as illustrated in Figure 3. Upon accessing the bridge physical entity monitoring equipment (structural sensors) and acquiring monitoring data, the bridge digital twin platform processes and stores various types of monitoring data (e.g., displacement, stress) to enable visual mapping of this data on the interactive interface. In the calculation function module, monitoring data can be selected as calculation input parameters or inversion target parameters for real-time calculation. For instance, after inputting or accessing static and dynamic load data via the interactive interface, the program automatically invokes general-purpose finite element software for real-time analysis. Regarding the parameter inversion function, monitored data such as displacement and stress of the bridge entity serve as calculation parameters. The system implements a cyclic operation involving parameter modification, finite element analysis, result export and comparison, and inversion parameter correction. This automatically realizes the correction of inversion function parameters and multiple invocations of the finite element analysis software for parameter adjustment and calculation. Calculation results, inversion outcomes, and operation logs are backed up and archived. Upon completion, users can display the calculation or inversion results as charts or visually map them onto the model via the interactive interface.
Figure 3. Basic data transmission route of the digital twin system.
By constructing the DT system based on the aforementioned methods, integrated management of various physical entity data can be achieved on the human–machine interface hosting the DT information model. Leveraging the API instruction set on the interface, the dynamic conversion from physical entity data to mechanical calculation parameters is realized, along with the automated execution of mechanical analysis and parameter inversion functions. Finally, through button operations on the interface, the synchronous mapping of mechanical analysis results and state prediction of the physical entity are achieved following the completion of parameter inversion. The FEM, once updated through parameter inversion, more accurately represents the state of the physical entity, thereby providing more precise support for project management and decision-making in engineering construction.

4. Case Study

This paper takes a concrete continuous beam bridge currently under construction as a case study to construct a DT platform that integrates Midas Civil general analysis software and finite element model updating theory.

4.1. Project Overview

The case study focuses on a three-span prestressed concrete (PC) continuous box-girder bridge with a total length of 324 m and a span configuration of 84 + 152 + 84 m. The structure features a variable cross-section and was constructed using the balanced cantilever method. The design specifications prescribe C55 grade concrete for the main girder and a control tensioning stress of 1395 MPa for the prestressing tendons. Based on these parameters, the DT informational model and the corresponding finite element analysis model were established. The general layout of the bridge is illustrated in Figure 4, while the detailed material properties and design parameters are summarized in Table 1. These baseline values serve as the initial input for the FEM prior to the real-time parameter inversion process.
Figure 4. General plan of the main bridge of the continuous beam bridge (unit: mm).
Table 1. Summary of material properties for the case study bridge.
During the construction process, for each poured segment, horizontal observation points are established at the centerline of the girder top surface and on both the upstream and downstream sides to continuously observe elevation changes at various cross-sections throughout the entire girder construction. Elevation changes at the observation points are measured in a timely manner before concrete pouring, after pouring (avoiding temperature effects), before tensioning, and after tensioning (avoiding temperature effects) to continuously check the actual deflection of the observed girder segments. The bridge construction site is shown in Figure 5.
Figure 5. General plan of the main bridge of the continuous beam bridge. (a) Bridge construction; (b) Suspended basket construction.
Girder top elevation measurement points are arranged on the top surface of the main girder body. A test cross-section is set at the front end of each girder segment, with five measurement points arranged on the top surface of each cross-section. The layout of the measurement points is shown in Figure 6. Measurement points D1 and D2 are primarily used to measure the settlement of the bottom formwork, while measurement points 1~5 are used to measure the camber values before and after tensioning, and can also serve as alignment measurement points after the bridge is completed.
Figure 6. Layout of elevation measurement points (unit: mm).

4.2. Modification of Bridge Mechanical Parameters During the Construction Phase

Considering the project’s specific characteristics, the vertical deflection of constructed segments is defined as the objective function for FEM updating. Guided by experience and sensitivity analysis, the elastic modulus is prioritized as the primary inversion target. This prioritization is justified by two factors: first, the elastic modulus exhibits the highest sensitivity to the instantaneous displacement of cantilever segments; second, focusing on this core parameter ensures the convergence and stability of the momentum optimization algorithm within the DT’s real-time interaction layer. Unlike long-term effects such as shrinkage and creep, which remain relatively stable within millisecond-level data capture windows, the elastic modulus serves as a dynamic indicator of “as-built” structural health. Furthermore, the elastic modulus directly influences the stress distribution and strength estimation of the bridge. Since standard laboratory tests and surface-level rebound hammer measurements fail to capture the real-time, in situ state of mass concrete, sequentially updating the elastic modulus for each segment is essential. This approach allows for precise stiffness correction, enabling the DT system to accurately reproduce the deformation behavior at segment joints, specifically the displacement and strain at beam element nodes, throughout the construction process.
Midas Civil 2024v1.1 is adopted as the general-purpose finite element calculation software to simulate and analyze the entire construction process of the bridge [35]. Midas Civil can fully consider the prestress load effects, calculate prestress losses, and account for the effects of concrete shrinkage and creep through time-dependent material properties. The subsequent part of this section outlines the general steps for parameter inversion using Midas Civil and the principles for parameter determination.
The cross-sectional dimensions and material properties of the baseline model are established based on design specifications, as illustrated in Figure 7. Given the bridge’s structural symmetry, this case study initially adopts a symmetric modeling approach to validate the proposed framework, thereby enhancing computational efficiency. However, the DT system possesses the intrinsic flexibility to accommodate asymmetric environmental influences and construction deviations. By designating independent virtual sensor nodes and discrete updating zones for the left and right cantilever arms, the system can perform concurrent, multi-zone parameter inversion. This capability ensures that real-world asymmetries—such as non-uniform thermal gradients or localized construction errors—are accurately captured and reflected in the mechanical state of the twin.
Figure 7. The FEM of the continuous beam bridge main bridge.
The finite element model of the bridge is established using Midas Civil. The construction of each box girder segment is divided into three stages: pouring, tensioning of prestressing tendons, and form traveller movement. The specific time settings for the construction stages are shown in Table 2.
Table 2. Construction stage time settings.
To meet the needs of construction monitoring, data is collected after the completion of each girder segment to update the elastic modulus of the previously constructed segment. The updated elastic modulus is regarded as the true value, and subsequent updates are performed using the previously updated elastic modulus as the true material parameter for the corresponding segment. All box girder segment structures are activated in the corresponding pouring stage. The activation age for the 0# segment is 30 days, while for segments 1# to 20#, it is 3 days. The segment age ( A a g e ) at the time of updating is calculated as:
A a g e = C e n d − P e n d + 10
where C e n d represents the end date of the updating construction stage; P e n d represents the end date of the pouring of the segment being updated.
The elastic modulus updating process for bridge segments 1# to 3# is detailed here as a representative case, with subsequent segments following an identical procedure. The comprehensive updating results are summarized in Table 3. To rigorously assess the performance of the proposed system, predictive accuracy was quantified using Mean Absolute Error (MAE), Root Mean Square Error (RMSE), and Mean Relative Error (MRE). For the baseline model—representing the initial theoretical calculation prior to updating—the MAE and RMSE of the vertical deflections were 0.0755 mm and 0.0796 mm, respectively, yielding a substantial MRE of 21.95%. Upon implementing real-time parameter inversion, these discrepancies were remarkably mitigated: both MAE and RMSE dropped to 0.0004 mm, while the MRE was reduced to a mere 0.11%. This significant enhancement in model fidelity underscores the system’s capacity to synchronize the virtual model with the as-built structure in real-time. Additionally, the convergence behavior of the momentum-based optimization was analyzed. In contrast to standard gradient descent methods, which often exhibit stochastic oscillations, the momentum method achieved a stable and monotonic reduction in the objective function, reaching the convergence tolerance within four iterations. This rapid convergence validates the algorithm’s efficacy for the 1 Hz interaction layer of the digital twin. The consistent performance across various construction stages demonstrates the robustness of the framework in capturing “as-built” structural responses despite initial modeling discrepancies. Moreover, while this study prioritizes the elastic modulus, the optimization framework is inherently scalable; the parameter dimensionality can be readily expanded to incorporate other critical variables, such as concrete unit weight or prestressing tension, to accommodate diverse construction scenarios.
Table 3. Elastic modulus updating table for bridge segments 0#–3#.
If the actual construction stage is at the 5# form traveller movement stage, the measured vertical nodal displacements at measurement point 3# are 0.4837 mm and 0.4835 mm. Using these measured displacement values as the response target values for the momentum method update, the elastic modulus of the 3# segment is corrected to 28,465 N/mm−2. If the mechanical analysis were performed using the design value of 35,500 N/mm−2, the theoretical vertical nodal displacements at measurement point 3# would be 0.3773 mm and 0.3771 mm. The updated elastic modulus value of the 3# segment indicates that substandard construction quality occurred during the pouring of the 3# segment, leading to partial failure of the elastic modulus of the 3# element. Under normal circumstances, concrete and steel reinforcement work synergistically, and stress is distributed evenly across the cross-section. However, when material stiffness is abnormal, stress tends to concentrate in areas with relatively higher stiffness. At this point, the axial compressive strength of the concrete in the 3# segment would also decrease due to substandard construction quality. If not addressed in time, the load on the 3# segment will gradually increase during subsequent construction, and local stress may exceed the tensile strength of the concrete, leading to cracks or even safety accidents. Therefore, this segment should be inspected, and a more refined mechanical analysis should be conducted.

4.3. Building a Digital Twin System

As demonstrated in the previous subsection, utilizing “gradient optimization methods” for parameter inversion of the FEM yields elastic modulus material parameters with high precision. This subsection details the construction of a bridge DT system that integrates parameter inversion functions, combining the DT concept, parameter inversion algorithms, and the system platform architecture.
By integrating the key DT technologies and functional integration methods mentioned earlier, a bridge DT platform incorporating parameter inversion capabilities is established. The interface and functional modules are illustrated in Figure 8. In this example, parameter inversion calculations are performed based on displacement data acquired from bridge monitoring equipment to obtain elastic modulus parameters that more accurately reflect the true state of the bridge.
Figure 8. Human–machine interaction interface of the digital twin platform.
During the operation of the calculation function, the monitored bridge displacement values serve as the target updating parameters. Until the target parameters are matched, the API program continuously invokes the Midas software to perform calculations, export displacement results, assess convergence, update the elastic modulus, and re-calculate. The objective is to iteratively adjust the elastic modulus and compare the calculated displacement with the target parameters. Upon function convergence, the calculation ceases, yielding the updated elastic modulus, which represents material parameters that are more consistent with the physical bridge entity. The stress and strain data obtained from the analysis of the updated FEM align more closely with the actual state of the physical bridge entity. The figure below displays the stress data calculated by the updated model.
Through the aforementioned process, this platform achieves full-process integrated management of the bridge on the DT platform side, ranging from physical entity monitoring data acquisition to finite element mechanical analysis and parameter inversion. By means of real-time perception of the physical entity’s state and automated parameter inversion analysis, high-fidelity mapping among the DT information model, the mechanical analysis model, and the physical entity is realized. This provides construction decision-makers with real-time, effective, and accurate information, thereby facilitating construction management and the prevention of construction safety issues.

5. Conclusions

Addressing the issues of poor timeliness, data fragmentation, and lagging model updates in bridge construction monitoring, this paper proposes a DT system architecture based on parameter inversion functions. The effectiveness of this method is validated using a long-span continuous beam bridge as an engineering background. The main conclusions are as follows:
(1)
This study transcends the limitations of traditional static BIM by establishing a five-dimensional architecture comprising the Physical Entity Layer, Twin Model Layer, and Dynamic Interaction Layer. Through secondary development using the Midas API and Python, an automated link ranging from monitoring data input and finite element model parameter updating to mechanical analysis result feedback is established, realizing real-time “monitoring-calculation-evaluation” closed-loop management.
(2)
To address the difficulty of traditional contact-based measurements in meeting the high-frequency data interaction requirements of DTs, machine vision technology is introduced as the core sensing method for the Physical Entity Layer. By constructing a visual imaging model and employing sub-pixel edge detection algorithms, millisecond-level capture and streaming transmission of bridge segment deformations are achieved, providing a high-precision and high-efficiency input source for subsequent parameter inversion.
(3)
The momentum-based optimization method successfully inverted the material constitutive parameters (elastic modulus) during the cantilever construction phases. Quantitative assessment demonstrates that the system is highly effective in correcting modeling discrepancies: the Mean Relative Error (MRE) of vertical deflections was reduced from 21.95% in the initial design model to 0.11% in the updated DT model. Furthermore, the system demonstrated robustness by accurately identifying segments with abnormal stiffness (e.g., segment #3), providing an objective basis for detecting potential construction quality issues.
(4)
The developed DT platform integrates 3D visualization scenes with data chart analysis functions. It not only achieves an intuitive mapping of the construction status but also enables proactive prediction and safety warning based on the updated high-fidelity model, providing project managers with a more reliable decision-making basis than traditional monitoring.
Despite the progress made in DT-based bridge construction monitoring, this research has limitations. The current inversion process is restricted to the elastic modulus and does not yet incorporate the coupled effects of temperature and creep. Future efforts will focus on implementing deep learning techniques, such as Physics-Informed Neural Networks (PINNs), to resolve multi-parameter identification and improve applicability in extreme environments. Moreover, integrating multi-physics coupling models—specifically addressing non-uniform temperature gradients and long-term creep—will refine the high-fidelity simulation capabilities of the real-time mechanical model. This advancement will ultimately transition the system from short-term state prediction to holistic, full-lifecycle structural health management.

Author Contributions

X.Y.: Writing—review and editing, Writing—original draft, Methodology. X.W.: Writing—review and editing. J.N.: Resources. G.S.: Writing—review and editing. A.Y.: Writing—review and editing, Supervision. J.Y.: Writing—review and editing, Visualization. All authors have read and agreed to the published version of the manuscript.

Funding

This research was funded by the Science and Technology Project of Jiangxi Provincial Department of Transportation grant number No. 2024ZG007. And The APC was funded by Xiaoqing Yu.

Institutional Review Board Statement

Not applicable.

Data Availability Statement

Data will be made available upon request.

Acknowledgments

The authors gratefully acknowledge the financial support provided by the Science and Technology Project of Jiangxi Provincial Department of Transportation (No. 2024ZG007).

Conflicts of Interest

Authors Xiaoqing Yu, Xiaoyun Wan, Jianchun Nie, Anjun Yu were employed by the Jiangxi Ganyue Expressway Co., Ltd. The remaining authors declare that the research was conducted in the absence of any commercial or financial relationships that could be construed as a potential conflict of interest.

References

  1. Amrani, A.Z.; Ortega, I.U.; Vallespir, B. Industry 4.0 technologies and lean production combination: A strategic methodology based on links quantification. Int. J. Technol. Innov. Manag. (IJTIM) 2024, 4, 1–18. [Google Scholar] [CrossRef] [Scilit]
  2. Elnadi, M.; Abdallah, Y.O. Industry 4.0: Critical investigations and synthesis of key findings. Manag. Rev. Q. 2024, 74, 711–744. [Google Scholar] [CrossRef] [Scilit]
  3. Khan, T.; Emon, M.M.H.; Rahman, M.A. A systematic review on exploring the influence of Industry 4.0 technologies to enhance supply chain visibility and operational efficiency. Rev. Bus. Econ. Stud. 2024, 12, 6–27. [Google Scholar] [CrossRef] [Scilit]
  4. Pongboonchai-Empl, T.; Antony, J.; Garza-Reyes, J.A.; Komkowski, T.; Tortorella, G.L. Integration of Industry 4.0 technologies into Lean Six Sigma DMAIC: A systematic review. Prod. Plan. Control 2024, 35, 1403–1428. [Google Scholar] [CrossRef] [Scilit]
  5. Singh, M.; Fuenmayor, E.; Hinchy, E.P.; Qiao, Y.; Murray, N.; Devine, D. Digital twin: Origin to future. Appl. Syst. Innov. 2021, 4, 36. [Google Scholar] [CrossRef] [Scilit]
  6. Tao, F.; Xiao, B.; Qi, Q.; Cheng, J.; Ji, P. Digital twin modeling. J. Manuf. Syst. 2022, 64, 372–389. [Google Scholar] [CrossRef] [Scilit]
  7. Rehman, I.U.; Mazher, K.M.; Wuni, I.Y. Systematic review of 4D BIM benefits in construction projects. Results Eng. 2025, 28, 107091. [Google Scholar] [CrossRef] [Scilit]
  8. Yue, H.; Wang, Q.; Zhao, Z.; Lai, S.; Huang, G. Interactions between BIM and robotics: Towards intelligent construction engineering and management. Comput. Ind. 2025, 169, 104299. [Google Scholar] [CrossRef] [Scilit]
  9. Yang, L.T.; Zhao, R.; Liu, D.; Lu, W.; Deng, X. Tensor-empowered federated learning for cyber-physical-social computing and communication systems. IEEE Commun. Surv. Tutor. 2023, 25, 1909–1940. [Google Scholar] [CrossRef] [Scilit]
  10. Chang, X.; Zhang, R.; Mao, J.; Fu, Y. Digital twins in transportation infrastructure: An investigation of the key enabling technologies, applications, and challenges. IEEE Trans. Intell. Transp. Syst. 2024, 25, 6449–6471. [Google Scholar] [CrossRef] [Scilit]
  11. Wu, S.; Ramli, M.Z.; Ngian, S.P.; Qiao, G.; Jiang, B. Review on parametric building information modelling and forward design approaches for sustainable bridge engineering. Discov. Appl. Sci. 2025, 7, 127. [Google Scholar] [CrossRef] [Scilit]
  12. Zhou, D.; Pei, B.; Li, X.; Jiang, D.; Wen, L. Innovative BIM technology application in the construction management of highway. Sci. Rep. 2024, 14, 15298. [Google Scholar] [CrossRef] [Scilit] [PubMed]
  13. Mihai, S.; Yaqoob, M.; Hung, D.V.; Davis, W.; Towakel, P.; Raza, M.; Karamanoglu, M.; Barn, B.; Shetve, D.; Prasad, R.V. Digital twins: A survey on enabling technologies, challenges, trends and future prospects. IEEE Commun. Surv. Tutor. 2022, 24, 2255–2291. [Google Scholar] [CrossRef] [Scilit]
  14. Pham, V.B.; Wong, S.P.P.; Abbasnejad, B. A systematic review of criteria influencing the integration of BIM and Immersive Technology in building projects. J. Inf. Technol. Constr. 2025, 30, 243–297. [Google Scholar] [CrossRef] [Scilit]
  15. Koo, J.; Yoon, S. Digital twin synchronization in closed-loop HVAC control for building operations. Autom. Constr. 2026, 182, 106723. [Google Scholar] [CrossRef] [Scilit]
  16. Valinejadshoubi, M.; Sacks, R.; Valdivieso, F.; Corneau-Gauvin, C.; Kaptué, A. Digital twin construction in practice: A case study of closed-loop production control integrating BIM, GIS, and IoT sensors. J. Constr. Eng. Manag. 2025, 151, 05025014. [Google Scholar] [CrossRef] [Scilit]
  17. Zhou, Y. Pre-camber control of large-span prestressed concrete continuous rigid-frame bridges under cantilever construction. Arch. Civ. Eng. 2025, 71, 469–487. [Google Scholar] [CrossRef] [Scilit]
  18. Jurišić, M. Impact of Balanced Cantilever Construction on Cast-in-Place Posttensioned Concrete Bridges. 2024. Available online: https://urn.nsk.hr/urn:nbn:hr:123:265011 (accessed on 9 September 2024).
  19. Megía Cardeñoso, M. Digital Twins in Civil Engineering: Conceptual Framework and Real-World Implementations. 2024. Available online: https://www.researchgate.net/publication/385903554_Digital_Twins_in_Civil_Engineering_Conceptual_Framework_and_Real-World_Implementations (accessed on 23 April 2024).
  20. Febrianto, E.; Butler, L.; Girolami, M.; Cirak, F. Digital twinning of self-sensing structures using the statistical finite element method. Data-Centric Eng. 2022, 3, e31. [Google Scholar] [CrossRef] [Scilit]
  21. Zhang, W.; Sun, L.; Zhang, L. Local damage identification method using finite element model updating based on a new wavelet damage function. Adv. Struct. Eng. 2018, 21, 1482–1494. [Google Scholar] [CrossRef] [Scilit]
  22. Shan, D.; Li, Q.; Khan, I.; Zhou, X. A novel finite element model updating method based on substructure and response surface model. Eng. Struct. 2015, 103, 147–156. [Google Scholar] [CrossRef] [Scilit]
  23. Zhang, G.; Zhou, T. Finite Element Model Calibration with Surrogate Model-Based Bayesian Updating: A Case Study of Motor FEM Model. Innov. Appl. Eng. Technol. 2024, 3, 1–13. [Google Scholar] [CrossRef] [Scilit]
  24. Cheng, Y.; Zhang, Z.; Królczyk, G.M.; Zheng, S.; Li, Z. A LOW-cost multi-frequency testing platform for non-contact vibration measurement. IEEE Instrum. Meas. Mag. 2023, 26, 48–54. [Google Scholar] [CrossRef] [Scilit]
  25. Zhang, S.; Ni, P.; Wen, J.; Han, Q.; Du, X.; Xu, K. Automated vision-based multi-plane bridge displacement monitoring. Autom. Constr. 2024, 166, 105619. [Google Scholar] [CrossRef] [Scilit]
  26. Ai, D.; Jiang, G.; Lam, S.-K.; He, P.; Li, C. Computer vision framework for crack detection of civil infrastructure—A review. Eng. Appl. Artif. Intell. 2023, 117, 105478. [Google Scholar] [CrossRef] [Scilit]
  27. Tian, Y.; Zhang, J.; Lyu, Y.; Zhang, J. Comprehensive review of noncontact sensing technologies for bridge condition monitoring and assessment. Intell. Transp. Infrastruct. 2024, 3, liae012. [Google Scholar] [CrossRef] [Scilit]
  28. Fu, Y.; Shang, Y.; Hu, W.; Li, B.; Yu, Q. Non-contact optical dynamic measurements at different ranges: A review. Acta Mech. Sin. 2021, 37, 537–553. [Google Scholar] [CrossRef] [Scilit]
  29. Rahman, M.M.; Cook, J.; Taebi, A. Non-contact heart vibration measurement using computer vision-based seismocardiography. Sci. Rep. 2023, 13, 11787. [Google Scholar] [CrossRef] [Scilit]
  30. Naderi, H.; Shojaei, A. Digital twinning of civil infrastructures: Current state of model architectures, interoperability solutions, and future prospects. Autom. Constr. 2023, 149, 104785. [Google Scholar] [CrossRef] [Scilit]
  31. Aragón, A.; Arquier, M.; Tokdemir, O.B.; Enfedaque, A.; Alberti, M.G.; Lieval, F.; Loscos, E.; Pavón, R.M.; Novischi, D.M.; Legazpi, P.V. Seeking a definition of digital twins for construction and infrastructure management. Appl. Sci. 2025, 15, 1557. [Google Scholar] [CrossRef] [Scilit]
  32. Liu, F.; Gu, L.; Fu, H.; Li, X.; Zhao, X.; Ma, N.; Liu, S. Research on Monitoring Technology for Frame Piers of Continuous Box-Girder Bridges Constructed by the Cantilever Method. Buildings 2024, 14, 2409. [Google Scholar] [CrossRef] [Scilit]
  33. Park, W.; Park, J.; Kim, H.-K. Candidate model construction of a cable-stayed bridge using parameterised sensitivity-based finite element model updating. Struct. Infrastruct. Eng. 2015, 11, 1163–1177. [Google Scholar] [CrossRef] [Scilit]
  34. Bakir, P.G.; Reynders, E.; De Roeck, G. An improved finite element model updating method by the global optimization technique ‘Coupled Local Minimizers’. Comput. Struct. 2008, 86, 1339–1352. [Google Scholar] [CrossRef] [Scilit]
  35. Fan, X. Application and Practice of Midas Civil in Bridge Engineering Education. In Proceedings of the 2024 3rd International Conference on Educational Science and Social Culture (ESSC 2024), Chengdu, China, 27–29 December 2024; p. 152. [Google Scholar]
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content.

Article Metrics

Citations

Article Access Statistics

Multiple requests from the same IP address are counted as one view.