Order Article Reprints
Journal: Appl. Sci., 2025
Volume: 15
Number: 4089
Article:
An Integrated Optimization Method for Resource-Constrained Schedule Compression Under Uncertainty in Construction Projects
Authors:
by
Firas Takleef, Omar Ayadi and Faouzi Masmoudi
Link:
https://www.mdpi.com/2076-3417/15/8/4089
MDPI offers high quality article reprints with convenient shipping to destinations worldwide. Each reprint features a 270 gsm bright white cover
and 105 gsm premium white paper, bound with two stitches for durability and printed in full color. The cover design is customized to your article
and designed to be complimentary to the journal.