Next Article in Journal
SWOT-AHP Analysis of BIM Technology Utilization in the Japanese Construction Industry
Next Article in Special Issue
Influence of Stress Level on the Determination of In Situ Stress by DRA Method
Previous Article in Journal
Methodology for 3D Management of University Faculties Using Integrated GIS and BIM Models: A Case Study
Previous Article in Special Issue
Experimental Study on the Influence of Sidewall Excavation Width and Rock Wall Slope on the Stability of the Surrounding Rock in Hanging Tunnels
 
 
Article

Article Versions Notes

Buildings 2024, 14(11), 3548; https://doi.org/10.3390/buildings14113548
Action Date Notes Link
article xml file uploaded 7 November 2024 06:39 CET Original file -
article xml uploaded. 7 November 2024 06:39 CET Update https://www.mdpi.com/2075-5309/14/11/3548/xml
article pdf uploaded. 7 November 2024 06:39 CET Version of Record https://www.mdpi.com/2075-5309/14/11/3548/pdf
article html file updated 7 November 2024 06:41 CET Original file -
article html file updated 29 June 2025 02:40 CEST Update -
article html file updated 28 August 2025 03:27 CEST Update -
article html file updated 14 September 2025 08:39 CEST Update https://www.mdpi.com/2075-5309/14/11/3548/html
Back to TopTop