Ghoroqi, M.; Ghoddousi, P.; Makui, A.; Shirzadi Javid, A.A.; Talebi, S.
An Integrated Model for Multi-Mode Resource-Constrained Multi-Project Scheduling Problems Considering Supply Management with Sustainable Approach in the Construction Industry under Uncertainty Using Evidence Theory and Optimization Algorithms. Buildings 2023, 13, 2023.
https://doi.org/10.3390/buildings13082023
AMA Style
Ghoroqi M, Ghoddousi P, Makui A, Shirzadi Javid AA, Talebi S.
An Integrated Model for Multi-Mode Resource-Constrained Multi-Project Scheduling Problems Considering Supply Management with Sustainable Approach in the Construction Industry under Uncertainty Using Evidence Theory and Optimization Algorithms. Buildings. 2023; 13(8):2023.
https://doi.org/10.3390/buildings13082023
Chicago/Turabian Style
Ghoroqi, Mahyar, Parviz Ghoddousi, Ahmad Makui, Ali Akbar Shirzadi Javid, and Saeed Talebi.
2023. "An Integrated Model for Multi-Mode Resource-Constrained Multi-Project Scheduling Problems Considering Supply Management with Sustainable Approach in the Construction Industry under Uncertainty Using Evidence Theory and Optimization Algorithms" Buildings 13, no. 8: 2023.
https://doi.org/10.3390/buildings13082023
APA Style
Ghoroqi, M., Ghoddousi, P., Makui, A., Shirzadi Javid, A. A., & Talebi, S.
(2023). An Integrated Model for Multi-Mode Resource-Constrained Multi-Project Scheduling Problems Considering Supply Management with Sustainable Approach in the Construction Industry under Uncertainty Using Evidence Theory and Optimization Algorithms. Buildings, 13(8), 2023.
https://doi.org/10.3390/buildings13082023