Barrientos-Orellana, A.; Ballesteros-Pérez, P.; Mora-Melià , D.; Cerezo-Narváez, A.; Gutiérrez-Bahamondes, J.H.
Comparison of the Stability and Accuracy of Deterministic Project Cost Prediction Methods in Earned Value Management. Buildings 2023, 13, 1206.
https://doi.org/10.3390/buildings13051206
AMA Style
Barrientos-Orellana A, Ballesteros-Pérez P, Mora-Melià D, Cerezo-Narváez A, Gutiérrez-Bahamondes JH.
Comparison of the Stability and Accuracy of Deterministic Project Cost Prediction Methods in Earned Value Management. Buildings. 2023; 13(5):1206.
https://doi.org/10.3390/buildings13051206
Chicago/Turabian Style
Barrientos-Orellana, Alexis, Pablo Ballesteros-Pérez, Daniel Mora-Melià , Alberto Cerezo-Narváez, and Jimmy H. Gutiérrez-Bahamondes.
2023. "Comparison of the Stability and Accuracy of Deterministic Project Cost Prediction Methods in Earned Value Management" Buildings 13, no. 5: 1206.
https://doi.org/10.3390/buildings13051206
APA Style
Barrientos-Orellana, A., Ballesteros-Pérez, P., Mora-Melià , D., Cerezo-Narváez, A., & Gutiérrez-Bahamondes, J. H.
(2023). Comparison of the Stability and Accuracy of Deterministic Project Cost Prediction Methods in Earned Value Management. Buildings, 13(5), 1206.
https://doi.org/10.3390/buildings13051206