Next Article in Journal
Construction Progress Monitoring through the Integration of 4D BIM and SLAM-Based Mapping Devices
Previous Article in Journal
The Impact of Measurable Findings from Pre- and Post-Occupancy Evaluations of Indoor Environmental Quality in the Primary Workspace
Previous Article in Special Issue
Defect Repair Cost and Home Warranty Deposit, Korea
 
 
Article

Article Versions Notes

Buildings 2023, 13(10), 2487; https://doi.org/10.3390/buildings13102487
Action Date Notes Link
article xml file uploaded 30 September 2023 07:44 CEST Original file -
article xml uploaded. 30 September 2023 07:44 CEST Update -
article pdf uploaded. 30 September 2023 07:44 CEST Version of Record https://www.mdpi.com/2075-5309/13/10/2487/pdf-vor
article html file updated 30 September 2023 07:46 CEST Original file -
article xml file uploaded 9 October 2023 03:03 CEST Update -
article xml uploaded. 9 October 2023 03:03 CEST Update https://www.mdpi.com/2075-5309/13/10/2487/xml
article pdf uploaded. 9 October 2023 03:03 CEST Updated version of record https://www.mdpi.com/2075-5309/13/10/2487/pdf
article html file updated 9 October 2023 03:05 CEST Update https://www.mdpi.com/2075-5309/13/10/2487/html
Back to TopTop