Bhushan, K.; Chattopadhyaya, S.; Sharma, S.; Sharma, K.; Li, C.; Zhang, Y.; Eldin, E.M.T.
Analyzing Reliability and Maintainability of Crawler Dozer BD155 Transmission Failure Using Markov Method and Total Productive Maintenance: A Novel Case Study for Improvement Productivity. Sustainability 2022, 14, 14534.
https://doi.org/10.3390/su142114534
AMA Style
Bhushan K, Chattopadhyaya S, Sharma S, Sharma K, Li C, Zhang Y, Eldin EMT.
Analyzing Reliability and Maintainability of Crawler Dozer BD155 Transmission Failure Using Markov Method and Total Productive Maintenance: A Novel Case Study for Improvement Productivity. Sustainability. 2022; 14(21):14534.
https://doi.org/10.3390/su142114534
Chicago/Turabian Style
Bhushan, Kartick, Somnath Chattopadhyaya, Shubham Sharma, Kamal Sharma, Changhe Li, Yanbin Zhang, and Elsayed Mohamed Tag Eldin.
2022. "Analyzing Reliability and Maintainability of Crawler Dozer BD155 Transmission Failure Using Markov Method and Total Productive Maintenance: A Novel Case Study for Improvement Productivity" Sustainability 14, no. 21: 14534.
https://doi.org/10.3390/su142114534
APA Style
Bhushan, K., Chattopadhyaya, S., Sharma, S., Sharma, K., Li, C., Zhang, Y., & Eldin, E. M. T.
(2022). Analyzing Reliability and Maintainability of Crawler Dozer BD155 Transmission Failure Using Markov Method and Total Productive Maintenance: A Novel Case Study for Improvement Productivity. Sustainability, 14(21), 14534.
https://doi.org/10.3390/su142114534