Next Article in Journal
Exploring the Related Factors in Students’ Academic Achievement for the Sustainable Education of Rural Areas
Next Article in Special Issue
Exploring On-Site Safety Knowledge Transfer in the Construction Industry
Previous Article in Journal
Examining CEOs’ Moral Reasoning in the Automotive Industry
Previous Article in Special Issue
Sustainable Construction Project Management (SCPM) Evaluation—A Case Study of the Guangzhou Metro Line-7, PR China
 
 

Order Article Reprints

Journal: Sustainability, 2019
Volume: 11
Number: 5973

Article: Causes and Mitigation Strategies of Delay in Power Construction Projects: Gaps between Owners and Contractors in Successful and Unsuccessful Projects
Authors: by Edwin Thomas Banobi and Wooyong Jung
Link: https://www.mdpi.com/2071-1050/11/21/5973

MDPI offers high quality article reprints with convenient shipping to destinations worldwide. Each reprint features a 270 gsm bright white cover and 105 gsm premium white paper, bound with two stitches for durability and printed in full color. The cover design is customized to your article and designed to be complimentary to the journal.

Order Cost and Details

Shipping Address

Billing Address

Notes or Comments

Validate and Place Order

The order must be prepaid after it is placed

req denotes required fields.
Back to TopTop