Davari, N.; Veloso, B.; Costa, G.d.A.; Pereira, P.M.; Ribeiro, R.P.; Gama, J.
A Survey on Data-Driven Predictive Maintenance for the Railway Industry. Sensors 2021, 21, 5739.
https://doi.org/10.3390/s21175739
AMA Style
Davari N, Veloso B, Costa GdA, Pereira PM, Ribeiro RP, Gama J.
A Survey on Data-Driven Predictive Maintenance for the Railway Industry. Sensors. 2021; 21(17):5739.
https://doi.org/10.3390/s21175739
Chicago/Turabian Style
Davari, Narjes, Bruno Veloso, Gustavo de Assis Costa, Pedro Mota Pereira, Rita P. Ribeiro, and João Gama.
2021. "A Survey on Data-Driven Predictive Maintenance for the Railway Industry" Sensors 21, no. 17: 5739.
https://doi.org/10.3390/s21175739
APA Style
Davari, N., Veloso, B., Costa, G. d. A., Pereira, P. M., Ribeiro, R. P., & Gama, J.
(2021). A Survey on Data-Driven Predictive Maintenance for the Railway Industry. Sensors, 21(17), 5739.
https://doi.org/10.3390/s21175739