Sign in to use this feature.

Years

Between: -

Subjects

remove_circle_outline
remove_circle_outline
remove_circle_outline
remove_circle_outline
remove_circle_outline
remove_circle_outline
remove_circle_outline
remove_circle_outline
remove_circle_outline

Journals

Article Types

Countries / Regions

Search Results (66)

Search Parameters:
Keywords = cascade hydropower station

Order results
Result details
Results per page
Select all
Export citation of selected articles as:
15 pages, 1944 KiB  
Article
Coordination of Hydropower Generation and Export Considering River Flow Evolution Process of Cascade Hydropower Systems
by Pai Li, Hui Lu, Lu Nan and Jiayi Liu
Energies 2025, 18(15), 3917; https://doi.org/10.3390/en18153917 - 23 Jul 2025
Viewed by 139
Abstract
Focusing the over simplification of existing models in simulating river flow evolution process and lack of coordination of hydropower generation and export, this paper proposes a hydropower generation and export coordinated optimal operation model that, at the same time, incorporates dynamic water flow [...] Read more.
Focusing the over simplification of existing models in simulating river flow evolution process and lack of coordination of hydropower generation and export, this paper proposes a hydropower generation and export coordinated optimal operation model that, at the same time, incorporates dynamic water flow delay by finely modeling the water flow evolution process among cascade hydropower stations within a river basin. Specifically, firstly, a dynamic water flow evolution model is built based on the segmented Muskingum method. By dividing the river into sub-segments and establishing flow evolution equation for individual sub-segments, the model accurately captures the dynamic time delay of water flow. On this basis, integrating cascade hydropower systems and the transmission system, a hydropower generation and export coordinated optimal operation model is proposed. By flexibly adjusting the power export, the model balances local consumption and external transmission of hydropower, enhancing the utilization efficiency of hydropower resources and achieving high economic performance. A case study verified the accuracy of the dynamic water flow evolution model and the effectiveness of the proposed hydropower generation and export coordinated optimal operation model. Full article
Show Figures

Figure 1

17 pages, 2066 KiB  
Article
A Mid-Term Scheduling Method for Cascade Hydropower Stations to Safeguard Against Continuous Extreme New Energy Fluctuations
by Huaying Su, Yupeng Li, Yan Zhang, Yujian Wang, Gang Li and Chuntian Cheng
Energies 2025, 18(14), 3745; https://doi.org/10.3390/en18143745 - 15 Jul 2025
Viewed by 191
Abstract
Continuous multi-day extremely low or high new energy outputs have posed significant challenges in relation to power supply and new energy accommodations. Conventional reservoir hydropower, with the advantage of controllability and the storage ability of reservoirs, can represent a reliable and low-carbon flexibility [...] Read more.
Continuous multi-day extremely low or high new energy outputs have posed significant challenges in relation to power supply and new energy accommodations. Conventional reservoir hydropower, with the advantage of controllability and the storage ability of reservoirs, can represent a reliable and low-carbon flexibility resource to safeguard against continuous extreme new energy fluctuations. This paper proposes a mid-term scheduling method for reservoir hydropower to enhance our ability to regulate continuous extreme new energy fluctuations. First, a data-driven scenario generation method is proposed to characterize the continuous extreme new energy output by combining kernel density estimation, Monte Carlo sampling, and the synchronized backward reduction method. Second, a two-stage stochastic hydropower–new energy complementary optimization scheduling model is constructed with the reservoir water level as the decision variable, ensuring that reservoirs have a sufficient water buffering capacity to free up transmission channels for continuous extremely high new energy outputs and sufficient water energy storage to compensate for continuous extremely low new energy outputs. Third, the mathematical model is transformed into a tractable mixed-integer linear programming (MILP) problem by using piecewise linear and triangular interpolation techniques on the solution, reducing the solution complexity. Finally, a case study of a hydropower–PV station in a river basin is conducted to demonstrate that the proposed model can effectively enhance hydropower’s regulation ability, to mitigate continuous extreme PV outputs, thereby improving power supply reliability in this hybrid renewable energy system. Full article
(This article belongs to the Special Issue Optimal Schedule of Hydropower and New Energy Power Systems)
Show Figures

Figure 1

15 pages, 3581 KiB  
Article
eDNA Metabarcoding Reveals Homogenization of Fish in Fujiang Segments Isolated by Cascading Hydroelectric Stations
by Chao Deng, Shixia Huang, Bolin Chen, Rong Huang, Jiaqi Zhang, Zhihui Xiao, Chengcheng Ma, Zhijian Wang and Xiaohong Liu
Animals 2025, 15(14), 2031; https://doi.org/10.3390/ani15142031 - 10 Jul 2025
Viewed by 284
Abstract
Background: The Fujiang River, a first-order branch of Jialing River, has for years been separated into six segments by six cascading hydropower stations in its downstream. However, the impact of cascading hydropower stations on its aquatic biota communities remains unclear. Methods: eDNA samples [...] Read more.
Background: The Fujiang River, a first-order branch of Jialing River, has for years been separated into six segments by six cascading hydropower stations in its downstream. However, the impact of cascading hydropower stations on its aquatic biota communities remains unclear. Methods: eDNA samples were collected in the upper, middle, and lower reaches of each river fragment during March, May, July, and December 2023, and after species identification, various statistical analyses including β-diversity, NMDS and MantelTest were performed using the R platform. Results: A total of 82 fish species belonging to 15 families were identified. The fish communities in the six fragments of the downstream Fujiang River showed a high degree of overlap, and a notable aggregation of fish communities between the upper, middle, and lower areas within each river section was also observed. Flow velocity (FV) and water temperature (TEMP) were found to be important factors in shaping fish distribution. Conclusion: Fish composition and distribution trend towards homogenization in the downstream of the Fujiang River. Full article
Show Figures

Figure 1

19 pages, 3731 KiB  
Article
Impact of Daily Operations of Cascade Hydropower Stations on Reservoir Flow Fluctuation Characteristics
by Jia Zhu, Hao Fan, Yun Deng, Min Chen and Jingying Lu
Water 2025, 17(11), 1608; https://doi.org/10.3390/w17111608 - 26 May 2025
Viewed by 441
Abstract
The daily operation of cascade hydropower stations induces periodic water level fluctuations (WLFs) that propagate as gravity waves, significantly affecting the hydrodynamics of reservoirs. Previous studies have mainly focused on the effects of individual stations, with little attention paid to the combined impacts [...] Read more.
The daily operation of cascade hydropower stations induces periodic water level fluctuations (WLFs) that propagate as gravity waves, significantly affecting the hydrodynamics of reservoirs. Previous studies have mainly focused on the effects of individual stations, with little attention paid to the combined impacts of upstream and downstream operations. Taking the Wudongde Reservoir on the Jinsha River as a case study, we used a one-dimensional hydrodynamic model and cross-correlation analysis to simulate flow fluctuation patterns under joint daily operations. The results show that fluctuations from upstream stations attenuate rapidly in the reservoir, with greater attenuation during the dry season. Under joint operations, wave energy decayed exponentially near the reservoir tail and linearly in the main reservoir area, leading to a further reduction in the WLF amplitudes. The interactions between upstream- and downstream-propagating waves enhance energy dissipation. The wave type transitioned from kinematic to dynamic as the water depth increased. During the wet and dry seasons, the average wave velocities were approximately six and nine times higher, respectively, than those under natural conditions. Joint operations expand the range of potential slope instability but reduce the WLF rate compared to natural flows. These findings provide a scientific reference for optimising the daily operations of cascade hydropower stations and mitigating their ecological impacts. Full article
(This article belongs to the Section Water Resources Management, Policy and Governance)
Show Figures

Figure 1

21 pages, 4100 KiB  
Article
Enhancing Pumped Hydro Storage Regulation Through Adaptive Initial Reservoir Capacity in Multistage Stochastic Coordinated Planning
by Chao Chen, Shan Huang, Yue Yin, Zifan Tang and Qiang Shuai
Energies 2025, 18(11), 2707; https://doi.org/10.3390/en18112707 - 23 May 2025
Viewed by 394
Abstract
Hybrid pumped hydro storage plants, by integrating pump stations between cascade hydropower stations, have overcome the challenges associated with site selection and construction of pure pumped hydro storage systems, thereby becoming the optimal large-scale energy storage solution for enhancing the absorption of renewable [...] Read more.
Hybrid pumped hydro storage plants, by integrating pump stations between cascade hydropower stations, have overcome the challenges associated with site selection and construction of pure pumped hydro storage systems, thereby becoming the optimal large-scale energy storage solution for enhancing the absorption of renewable energy. However, the multi-energy conversion between pump stations, hydropower, wind power, and photovoltaic plants poses challenges to both their planning schemes and operational performance. This study proposes a multistage stochastic coordinated planning model for cascade hydropower-wind-solar-thermal-pumped hydro storage (CHWS-PHS) systems. First, a Hybrid Pumped Hydro Storage Adaptive Initial Reservoir Capacity (HPHS-AIRC) strategy is developed to enhance the system’s regulation capability by optimizing initial reservoir levels that are synchronized with renewable generation patterns. Then, Non-anticipativity Constraints (NACs) are incorporated into this model to ensure the dynamic adaptation of investment decisions under multi-timescale uncertainties, including inter-annual natural water inflow (NWI) variations and hourly fluctuations in wind and solar power. Simulation results on the IEEE 118-bus system show that the proposed MSSP model reduces total costs by 6% compared with the traditional two-stage approach (TSSP). Moreover, the HPHS-AIRC strategy improves pumped hydro utilization by 33.8%, particularly benefiting scenarios with drought conditions or operational constraints. Full article
(This article belongs to the Section F1: Electrical Power System)
Show Figures

Figure 1

27 pages, 4119 KiB  
Article
Optimizing Automatic Voltage Control Collaborative Responses in Chain-Structured Cascade Hydroelectric Power Plants Using Sensitivity Analysis
by Li Zhang, Jie Yang, Jun Wang, Lening Wang, Haiming Niu, Xiaobing Liu, Simon X. Yang and Kun Yang
Energies 2025, 18(11), 2681; https://doi.org/10.3390/en18112681 - 22 May 2025
Viewed by 377
Abstract
Southwestern China has abundant hydropower networks, wherein neighboring cascade hydropower stations within the same river basin are typically connected to the power system in a chain-structured configuration. However, when such chain-structured cascade hydroelectric power plants (CC-HPPs) participate in automatic voltage control (AVC), problems [...] Read more.
Southwestern China has abundant hydropower networks, wherein neighboring cascade hydropower stations within the same river basin are typically connected to the power system in a chain-structured configuration. However, when such chain-structured cascade hydroelectric power plants (CC-HPPs) participate in automatic voltage control (AVC), problems such as reactive power interactions among stations and unreasonable voltage gradients frequently arise. To address these issues, this study proposes an optimized multi-station coordinated response control strategy based on sensitivity analysis and hierarchical AVC. Firstly, based on the topology of the chain-structured hydropower sending-end network, a reactive power–voltage sensitivity matrix is constructed. Subsequently, a regional-voltage-coordinated regulation model is developed using sensitivity analysis, followed by the establishment of a mathematical model, solution algorithm, and operational procedure for multi-station AVC-coordinated response optimization. Finally, case studies based on the actual operational data of a CC-HPP network validate the effectiveness of the proposed strategy, and simulation results demonstrate that the approach reduces the interstation reactive power pulling up to 97.76% and improves the voltage gradient rationality by 16.67%. These results substantially improve grid stability and operational efficiency while establishing a more adaptable voltage control framework for large-scale hydropower integration. Furthermore, they provide a practical foundation for future advancements in multi-scenario hydropower regulation, enhanced coordination strategies, and predictive control capabilities within clean energy systems. Full article
Show Figures

Figure 1

25 pages, 4641 KiB  
Article
Progressive Linear Programming Optimality Method Based on Decomposing Nonlinear Functions for Short-Term Cascade Hydropower Scheduling
by Jia Lu, Zhou Fang, Zheng Zhang, Yaxin Liu, Yang Xu, Tao Wang and Yuqi Yang
Water 2025, 17(10), 1441; https://doi.org/10.3390/w17101441 - 10 May 2025
Viewed by 443
Abstract
Short-term optimal scheduling of cascade hydropower stations enhances their flexible regulation and power generation capabilities. However, nonlinear function relationships and multistage and hydraulic interdependencies present significant challenges, resulting in considerable solution errors, premature convergence, and high computational demands. This study proposes a progressive [...] Read more.
Short-term optimal scheduling of cascade hydropower stations enhances their flexible regulation and power generation capabilities. However, nonlinear function relationships and multistage and hydraulic interdependencies present significant challenges, resulting in considerable solution errors, premature convergence, and high computational demands. This study proposes a progressive linear programming method that decomposes nonlinear functions to address these challenges. First, to accurately represent nonlinear functions and mitigate computational complexity, the entire feasible domain is partitioned into multiple contiguous subdomains in which nonconvex nonlinear functions within each subdomain can be equivalently replaced by linear relationships. Second, a progressive linear programming optimization algorithm is devised to prevent premature convergence, utilizing continuous subdomains rather than discrete points as state variables and incorporating the progressive optimality principle. Finally, to increase the solution efficiency, a dimensionality reduction strategy via the feasible domain state dynamic acquisition method is presented and optimized after excluding the infeasible states in each stage. The simulation of three cascade hydropower stations in a river basin in southwest China shows that the proposed method can achieve a superior peak regulation effect compared to the conventional mixed integer linear programming and progressive optimality algorithm. During the dry and wet seasons, the residual load peak–valley differences at the three stations are reduced by 612 MW and 521 MW compared to the MILP and 1889 MW and 2439 MW compared to the POA, which underscores the effectiveness of the method in optimizing the short-term scheduling of cascade hydropower stations. Full article
(This article belongs to the Special Issue Research Status of Operation and Management of Hydropower Station)
Show Figures

Figure 1

21 pages, 2977 KiB  
Article
Research on Typical Market Mode of Regulating Hydropower Stations Participating in Spot Market
by Mengfei Xie, Xiangrui Liu, Huaxiang Cai, Dianning Wu and Yanhe Xu
Water 2025, 17(9), 1288; https://doi.org/10.3390/w17091288 - 25 Apr 2025
Viewed by 316
Abstract
As the second largest power source in the world, hydropower plays a crucial role in the operation of power systems. This paper focuses on the key issues of regulating hydropower stations participating in the spot market. It aims at the core challenges, such [...] Read more.
As the second largest power source in the world, hydropower plays a crucial role in the operation of power systems. This paper focuses on the key issues of regulating hydropower stations participating in the spot market. It aims at the core challenges, such as the conflict of cascade hydro plants’ joint clearing, the lack of adaptability for different types of power supply bidding on the same platform, and the contradiction between long-term operation and the spot market. Through the construction of a water spillage management strategy and settlement compensation mechanism, the competitive abandoned water problem caused by mismatched quotations of cascade hydro plants can be solved. In order to achieve reasonable recovery of the power cost, a separate bidding mechanism and capacity cost recovery model are designed. Subsequently, the sufficient electricity supply constraint of the remaining period is integrated into the spot-clearing model, which can coordinate short-term hydropower dispatch with long-term energy storage demand. The operation of the Yunnan electricity spot market is being simulated to verify the effectiveness of the proposed method. Full article
(This article belongs to the Section Hydraulics and Hydrodynamics)
Show Figures

Figure 1

23 pages, 3569 KiB  
Article
Optimal Economic Dispatch Strategy for Cascade Hydropower Stations Considering Electric Energy and Peak Regulation Markets
by Fan Liu, Wentao Huang, Jingjing Ma, Jun He, Can Lv and Yukun Yang
Energies 2025, 18(7), 1762; https://doi.org/10.3390/en18071762 - 1 Apr 2025
Viewed by 454
Abstract
With the evolution of the power market and the increase in the new energy penetration rate, the power industry will present diversified characteristics. The continuous development of the electric energy market (EEM) and the peak regulation market (PRM) is also affecting the economic [...] Read more.
With the evolution of the power market and the increase in the new energy penetration rate, the power industry will present diversified characteristics. The continuous development of the electric energy market (EEM) and the peak regulation market (PRM) is also affecting the economic benefits of cascade hydropower stations, in which the EEM, as a market for electric energy trading in the power market, develops synergistically with the PRM and creates the conditions for the consumption of new energy sources; for this reason, this paper, while considering the benefits of cascade hydropower stations in the EEM in different time scales and the impact of the spot market, combines the compensation mechanism and apportionment principle of the PRM. This paper proposes an optimal economic scheduling strategy for cascade hydropower stations. Specifically, firstly, the strategy adopts multi-objective optimization. The objective function takes into account the generation capacity of the cascade hydropower stations, the benefits of the EEM, the influence of the spot market, the compensatory benefits of peaking, and the sharing expenses of peaking; secondly, the constraints at the level of the power grid, the level of the cascade hydropower stations, and the level of the market are taken into account comprehensively, and the Harris Hawk Algorithm is used to solve the model; lastly, by comparing different schemes, it is observed that under varying inflow conditions, the proposed dispatch strategy in this paper yields slightly lower revenue in the EEM than other schemes. However, due to its comprehensive consideration of the synergy between the PRM and the EEM, its overall economic benefits surpass those of other schemes. This fully validates the effectiveness and economic efficiency of the proposed dispatch strategy. Full article
(This article belongs to the Section F1: Electrical Power System)
Show Figures

Figure 1

18 pages, 5214 KiB  
Article
Picoplankton Groups and Their Responses to Environmental Factors in Small Cascade Hydropower Stations
by Peiquan Li, Zhongxin Luo, Xianfang Zhu, Zhengzhu Dang, Daxin Zhang and Xin Sui
Water 2025, 17(6), 903; https://doi.org/10.3390/w17060903 - 20 Mar 2025
Viewed by 457
Abstract
Hydropower is a clean and renewable energy source, and cascade hydropower stations have been developed to enhance water energy utilization efficiency. While small hydropower stations have a smaller scale and environmental impact compared to large ones, the cumulative effects of cascade development on [...] Read more.
Hydropower is a clean and renewable energy source, and cascade hydropower stations have been developed to enhance water energy utilization efficiency. While small hydropower stations have a smaller scale and environmental impact compared to large ones, the cumulative effects of cascade development on river ecosystems should not be overlooked. In this study, flow cytometry was used to classify picoplankton from water samples collected at four small cascade hydropower stations on a Pearl River tributary into six microbial groups: Virus, LNA (Low Nucleic Acid), HNA (High Nucleic Acid), Cyanobacteria, Algae, and Fungi. Four ecological assessment indices were calculated: Photosynthetic Autotrophic Capacity (PAC), Bacterial Activity Index (BAI), Virus Regulatory Capacity (VRC), and Fungal Metabolic Capacity (FMC). By analyzing trends in microbial abundance and ecological indices and their correlations with environmental factors, the results showed that along the small cascade hydropower stations, dissolved oxygen (DO) and electrical conductivity (EC) increased from 5.71 mg/L and 49.87 μS/cm upstream to 6.80 mg/L and 56.18 μS/cm downstream, respectively. In contrast, oxidation-reduction potential (ORP) and total organic carbon (TOC) concentrations decreased from 3.81 mV and 1.59 mg/L to −8.05 mV and 1.08 mg/L, respectively. Among the microbial groups, the abundance of Virus, LNA, and Fungi decreased by 30.9%, 30.5%, and 34.9%, respectively, along the cascade system. EC, TOC, and NO3-N were identified as key drivers of changes in the abundance of the Virus, LNA, and Fungi groups. The concentrations of carbon and nitrogen nutrients significantly influenced the ecological assessment indices. Cascade hydropower stations had a significant impact on PAC, BAI, and VRC, while their influence on FMC was relatively small. The VRC showed a decreasing trend, suggesting a weakening effect of the stations on VRC. This study offers new perspectives and methods that facilitate the rapid and quantitative assessment of the ecological impacts of cascade hydropower stations. Full article
Show Figures

Figure 1

24 pages, 6641 KiB  
Article
Optimal Dispatching Rules for Peak Shaving of Cascaded Hydropower Stations in Response to Large-Scale New Energy Integration
by Zhanxing Xu, Qiang Liu, Lingjun Xu, Li Mo, Yongchuan Zhang and Xin Zhang
Processes 2025, 13(3), 612; https://doi.org/10.3390/pr13030612 - 21 Feb 2025
Cited by 2 | Viewed by 538
Abstract
Fully tapping into the load regulation capacity of cascade hydropower stations on a river, in coordination with wind and photovoltaic power stations, can effectively suppress power fluctuations in new energy and promote grid integration and the consumption of new energy. To derive the [...] Read more.
Fully tapping into the load regulation capacity of cascade hydropower stations on a river, in coordination with wind and photovoltaic power stations, can effectively suppress power fluctuations in new energy and promote grid integration and the consumption of new energy. To derive the peak shaving dispatching rules for cascaded hydropower stations in provincial power systems with a high proportion of new energy integration, a short-term peak shaving dispatching model for cascaded hydropower stations was first established considering large-scale new energy consumption; secondly, based on statistical learning methods, the peak shaving and dispatching rules of cascade hydropower stations in response to large-scale new energy integration were derived. Finally, taking wind farms, photovoltaic power stations, and the Qingjiang cascade hydropower stations in the power grid of Hubei Province, China, as research objects, the compensation effect of Qingjiang cascade hydropower stations on new energy output and the peak shaving performance for the power grid load were verified. The research results indicate that cascade hydropower can effectively reduce the peak valley load difference in provincial power grids and improve the overall smoothness of power grid loads while suppressing fluctuations in new energy output. After peak regulation by cascade hydropower, the residual load fluctuation indices of the power grid are improved by more than 20% compared to those after the integration of new energy. The probabilistic dispatching decisions for the facing period’s output through the optimal dispatching rules of cascade hydropower stations can provide dispatchers with richer decision-making support information and have guiding significance for the actual peak shaving dispatch of cascade hydropower stations. Full article
Show Figures

Figure 1

18 pages, 16349 KiB  
Article
Research on Economic Operation of Cascade Small Hydropower Stations Within Plants Based on Refined Efficiency Models
by Daohong Wei, Chunpeng Feng and Dong Liu
Energies 2025, 18(4), 964; https://doi.org/10.3390/en18040964 - 17 Feb 2025
Viewed by 608
Abstract
In order to enhance the overall power generation efficiency of cascade hydropower, it is essential to conduct modelling optimization of its in-plant operation. However, existing studies have devoted minimal attention to the detailed modelling of turbine operating performance curves within the in-plant economic [...] Read more.
In order to enhance the overall power generation efficiency of cascade hydropower, it is essential to conduct modelling optimization of its in-plant operation. However, existing studies have devoted minimal attention to the detailed modelling of turbine operating performance curves within the in-plant economic operation model. This represents a significant challenge to the practical application of the optimization results. This study presents a refined model of a hydraulic turbine operating performance curve, which was established by combining a particle swarm optimization (PSO) algorithm and a backpropagation (BP) neural network. The model was developed using a cascade small hydropower group as an illustrative example. On this basis, an in-plant economic operation model of a cascade small hydropower group was established, which is based on the principle of ’setting electricity by water’ and has the goal of maximizing power generation. The model was optimized using a genetic algorithm, which was employed to optimize the output of the units. In order to ascertain the efficacy of the methodology proposed in this study, typical daily operational scenarios of a cascade small hydropower group were selected for comparison. The results demonstrate that, in comparison with the actual operational strategy, the proposed model and method enhance the total output by 3.38%, 2.11%, and 3.56%, respectively, across the three typical scenarios. This method enhances the efficiency of power generation within the cascade small hydropower group and demonstrates substantial engineering application value. Full article
(This article belongs to the Section B: Energy and Environment)
Show Figures

Figure 1

27 pages, 5483 KiB  
Article
Application of Black-Winged Differential-Variant Whale Optimization Algorithm in the Optimization Scheduling of Cascade Hydropower Stations
by Mi Zhang, Zixuan Liu, Rungang Bao, Shuli Zhu, Li Mo and Yuqi Yang
Sustainability 2025, 17(3), 1018; https://doi.org/10.3390/su17031018 - 26 Jan 2025
Cited by 1 | Viewed by 932
Abstract
Hydropower is a vital strategic component of China’s clean energy development. Its construction and optimized water resource allocation are crucial for addressing global energy challenges, promoting socio-economic development, and achieving sustainable development. However, the optimization scheduling of cascade hydropower stations is a large-scale, [...] Read more.
Hydropower is a vital strategic component of China’s clean energy development. Its construction and optimized water resource allocation are crucial for addressing global energy challenges, promoting socio-economic development, and achieving sustainable development. However, the optimization scheduling of cascade hydropower stations is a large-scale, multi-constrained, and nonlinear problem. Traditional optimization methods suffer from low computational efficiency, while conventional intelligent algorithms still face issues like premature convergence and local optima, which severely hinder the full utilization of water resources. This study proposed an improved whale optimization algorithm, the Black-winged Differential-variant Whale Optimization Algorithm (BDWOA), which enhanced population diversity through a Logistic-Sine-Cosine combination chaotic map, improved algorithm flexibility with an adaptive adjustment strategy, and introduced the migration mechanism of the black-winged kite algorithm along with a differential mutation strategy to enhance the global search ability and convergence capacity. The BDWOA algorithm was tested using test functions with randomly generated simulated data, with its performance compared against five related optimization algorithms. Results indicate that the BDWOA achieved the optimal value with the fewest iterations, effectively overcoming the limitations of the original whale optimization algorithm. Further validation using actual runoff data for the cascade hydropower station optimization scheduling model showed that the BDWOA effectively enhanced power generation efficiency. In high-flow years, the average power generation increased by 8.3%, 6.5%, 6.8%, 4.1%, and 8.2% compared to the five algorithms while achieving the shortest computation time. Significant improvements in power generation were also observed in normal-flow and low-flow years. The scheduling solutions generated by the BDWOA can adapt to varying inflow conditions, offering an innovative approach to solving complex hydropower station optimization scheduling problems. This contributes to the sustainable utilization of water resources and supports the long-term development of renewable energy. Full article
(This article belongs to the Section Energy Sustainability)
Show Figures

Figure 1

18 pages, 2552 KiB  
Article
Short-Term Optimal Scheduling of a Cascade Hydro-Photovoltaic System for Maximizing the Expectation of Consumable Electricity
by Shuzhe Hu, Jinniu Miao, Jingyang Wu, Liqian Zhao, Yue Wang, Fanyan Meng, Chao Wei, Xiaoqin Zhang and Benrui Zhu
Processes 2025, 13(2), 328; https://doi.org/10.3390/pr13020328 - 24 Jan 2025
Viewed by 869
Abstract
Fully leveraging the regulatory role of cascade hydropower in river basins and realizing complementary joint power generation between cascade hydropower and photovoltaic (PV) systems is a crucial approach to promoting the consumption of clean energy. Given the uncertainty of PV outputs, this paper [...] Read more.
Fully leveraging the regulatory role of cascade hydropower in river basins and realizing complementary joint power generation between cascade hydropower and photovoltaic (PV) systems is a crucial approach to promoting the consumption of clean energy. Given the uncertainty of PV outputs, this paper introduces a short-term scheduling model for cascade hydropower–PV systems. The model aims to maximize electricity consumption by considering individual units, hydropower plant constraints, unit constraints, and grid constraints. By allocating loads among hydropower plants and periods, it optimizes hydropower’s dual roles, supporting grid power supplies and coordinating with PVs, thus boosting the overall system consumption. In terms of model solution, linearization methods and modeling techniques such as piecewise linear approximation, the introduction of 0–1 integer variables, and the discretization of generation headwater are employed to handle the nonlinear constraints in the original model, transforming it into a mixed-integer linear programming problem. Finally, taking a complementary system constructed by 15 units of 4 hydropower stations and 2 photovoltaic groups in a cascade in a river basin in Southwest China as an example, the results show that through the complementary coordination of cascade hydropower and photovoltaic power, under the same grid constraints, the expected value of the power consumption of the complementary system in the model of this paper increased by 863.2 MW·h, among which the power consumption of photovoltaic group 1 increased by 1035.7 MW·h, and the power consumption of photovoltaic group 2 decreased by 172.5 MW·h. Full article
Show Figures

Figure 1

20 pages, 3066 KiB  
Article
An Ancillary Decision-Making Method for Hydropower Station Failure Handling Based on Case-Based Reasoning and Knowledge Graph
by Peng Li, Min Zhou, Xian Lin, Liangsong Zhou and Peng Cai
Processes 2024, 12(12), 2731; https://doi.org/10.3390/pr12122731 - 2 Dec 2024
Viewed by 985
Abstract
This paper proposes an ancillary decision-making method for hydropower station failure handling based on knowledge graph and case-based reasoning. The proposed method assists the power station dispatcher to carry out accurate and timely failure handling after an accident. First, the main steps of [...] Read more.
This paper proposes an ancillary decision-making method for hydropower station failure handling based on knowledge graph and case-based reasoning. The proposed method assists the power station dispatcher to carry out accurate and timely failure handling after an accident. First, the main steps of case-based reasoning are introduced. The main difficulties and their corresponding solutions when applying case-based reasoning to hydropower station failure handling are discussed. Then, an ancillary decision-making method for hydropower station failure handling is proposed. Key steps such as case construction, case retrieval, and case revision are designed. In the proposed method, each case is represented in the form of multiple knowledge graphs, i.e., a system topology knowledge graph, a dispatching regulation knowledge graph, and an accident case knowledge graph. The flexibility of case knowledge extraction, management, and retrieval is greatly enhanced. Finally, the simulation analysis is carried out on a large-scale cascade hydropower station in China. The simulation results show that the proposed method can provide reasonable and reliable ancillary decision-making for the power station dispatcher in the failure handling process, and greatly improve the intelligence level of emergency management at a hydropower station. Full article
(This article belongs to the Special Issue Process and Modelling of Renewable and Sustainable Energy Sources)
Show Figures

Figure 1

Back to TopTop