Sign in to use this feature.

Years

Between: -

Subjects

remove_circle_outline
remove_circle_outline
remove_circle_outline
remove_circle_outline
remove_circle_outline
remove_circle_outline
remove_circle_outline
remove_circle_outline
remove_circle_outline

Journals

remove_circle_outline
remove_circle_outline
remove_circle_outline
remove_circle_outline
remove_circle_outline
remove_circle_outline

Article Types

Countries / Regions

remove_circle_outline
remove_circle_outline
remove_circle_outline
remove_circle_outline
remove_circle_outline
remove_circle_outline

Search Results (628)

Search Parameters:
Keywords = settlement projects

Order results
Result details
Results per page
Select all
Export citation of selected articles as:
24 pages, 10199 KiB  
Article
How Does Eco-Migration Influence Habitat Fragmentation in Resettlement Areas? Evidence from the Shule River Resettlement Project
by Lucang Wang, Ting Liao and Jing Gao
Land 2025, 14(8), 1514; https://doi.org/10.3390/land14081514 - 23 Jul 2025
Abstract
Eco-migration (EM) constitutes a specialized form of migration aimed at enhancing living environments and alleviating ecological pressure. Nevertheless, large-scale external migration has intensified habitat fragmentation (HF) in resettlement areas. This paper takes the Shule River Resettlement Project (SRRP) as a case, based on [...] Read more.
Eco-migration (EM) constitutes a specialized form of migration aimed at enhancing living environments and alleviating ecological pressure. Nevertheless, large-scale external migration has intensified habitat fragmentation (HF) in resettlement areas. This paper takes the Shule River Resettlement Project (SRRP) as a case, based on the China Land Cover Dataset (CLCD) data of the resettlement area from 1996 to 2020, using the Landscape Pattern Index (LPI) and the land use transfer matrix (LTM) to clearly define the stages of migration and the types of resettlement areas and to quantitative explore how EM affects HF. The results show that (1) EM accelerates the transformation of natural habitats (NHs) to artificial habitats (AHs) and shows the characteristics of sudden changes in the initial stage (1996–2002), with stability in the middle stage (2002–2006) and late stage (2007–2010) and dramatic changes in the post-migration stage (2011–2020). In IS, MS, LS, and PS, AH increased by 26.145 km2, 21.573 km2, 22.656 km2, and 16.983 km2, respectively, while NH changed by 73.116 km2, −21.575 km2, −22.655 km2, −121.82 km2, and −213.454 km2, respectively. The more dispersed the resettlement areas are the more obvious the expansion of AH will be, indicating that the resettlement methods for migrants have a significant effect on habitat changes. (2) During the resettlement process, the total number of plaques (NP), edge density (ED), diversity (SHDI), and dominance index (SHEI) all continued to increase, while the contagion index (C) and aggregation index (AI) continued to decline, indicating that the habitat is transforming towards fragmentation, diversification, and complexity. Compared with large-scale migration bases (LMBs), both small-scale migration bases (SMBs), and scattered migration settlement points (SMSPs) exhibit a higher degree of HF, which reflects how the scale of migration influences the extent of habitat fragmentation. While NHs are experiencing increasing fragmentation, AHs tend to show a decreasing trend in fragmentation. Ecological migrants play a dual role: they contribute to the alteration and fragmentation of natural habitat patterns, while simultaneously promoting the formation and continuity of artificial habitat structures. This study offers valuable practical insights and cautionary lessons for the resettlement of ecological migrants. Full article
Show Figures

Figure 1

25 pages, 9567 KiB  
Article
Mechanical Characterization and Theoretical Study of Friction Pile Groups in Coastal Areas Based on Finite Element Analysis
by Jun Wu, Yanfeng Li, Jia Zhao, Guangzuo Feng, Yuanhui Li, Jialong Li and Jiaxu Jin
Buildings 2025, 15(14), 2556; https://doi.org/10.3390/buildings15142556 - 20 Jul 2025
Viewed by 126
Abstract
Field foundation pile loading tests were conducted in the context of an actual bridge pile foundation project. The test data were analyzed to determine the reasons for the variation in the complex geological conditions of the seashore. Moreover, finite element analysis was conducted [...] Read more.
Field foundation pile loading tests were conducted in the context of an actual bridge pile foundation project. The test data were analyzed to determine the reasons for the variation in the complex geological conditions of the seashore. Moreover, finite element analysis was conducted to evaluate the influence of pile length and diameter on the settlement of coastal friction foundation piles. Increasing the pile length from 65 m to 75 m reduced the settlement by 25.7%, while increasing the diameter from 1.5 m to 2.0 m led to a 35.9% reduction. Increasing the pile spacing reduced the amount of structural settlement. Group pile foundation pile spacings should be 2.5–3.0 D. Pile group superposition reduced the most obvious effects and the settlement reduction rate was the fastest. Under seismic conditions, the pile group foundation exhibited 5.60 times greater horizontal displacement, 3.57 times higher bending moment, and 5.30 times increased shear force relative to static loading. The formula for predicting the settlement of oversized friction pile group foundations was modified based on settlement values calculated using finite elements. The revised formula is suitable for calculating the settlement of friction pile group foundations in coastal areas. Full article
(This article belongs to the Section Building Energy, Physics, Environment, and Systems)
Show Figures

Figure 1

22 pages, 7152 KiB  
Article
Comprehensive Substantiation of the Impact of Pre-Support Technology on a 50-Year-Old Subway Station During the Construction of Undercrossing Tunnel Lines
by Bin Zhang, Shaohui He, Jianfei Ma, Jiaxin He, Yiming Li and Jinlei Zheng
Infrastructures 2025, 10(7), 183; https://doi.org/10.3390/infrastructures10070183 - 11 Jul 2025
Viewed by 156
Abstract
Due to the long operation period of Beijing Metro Line 2 and the complex surrounding building environment, this paper comprehensively studied the mechanical properties of new tunnels using close-fitting undercrossing based on pre-support technology. To control structural deformation caused by the expansion project, [...] Read more.
Due to the long operation period of Beijing Metro Line 2 and the complex surrounding building environment, this paper comprehensively studied the mechanical properties of new tunnels using close-fitting undercrossing based on pre-support technology. To control structural deformation caused by the expansion project, methods such as laboratory tests, numerical simulation, and field tests were adopted to systematically analyze the tunnel mechanics during the undercrossing of existing metro lines. First, field tests were carried out on the existing Line 2 and Line 3 tunnels during the construction period. It was found that the close-fitting construction based on pre-support technology caused small deformation displacement in the subway tunnels, with little impact on the smoothness of the existing subway rail surface. The fluctuation range was −1 to 1 mm, ensuring the safety of existing subway operations. Then, a refined finite difference model for the close-fitting undercrossing construction process based on pre-support technology was established, and a series of field and laboratory tests were conducted to obtain calculation parameters. The reliability of the numerical model was verified by comparing the monitored deformation of existing structures with the simulated structural forces and deformations. The influence of construction methods on the settlement changes of existing line tracks, structures, and deformation joints was discussed. The research results show that this construction method effectively controls the settlement deformation of existing lines. The settlement deformation of existing lines is controlled within 1~3 cm. The deformation stress of the existing lines is within the concrete strength range of the existing structure, and the tensile stress is less than 3 MPa. The maximum settlement and maximum tensile stress of the station in the pre-support jacking scheme are −5.27 mm and 2.29 MPa. The construction scheme with pre-support can more significantly control structural deformation, reduce stress variations in existing line structures, and minimize damage to concrete structures. Based on the monitoring data and simulation results, some optimization measures were proposed. Full article
(This article belongs to the Special Issue Recent Advances in Railway Engineering)
Show Figures

Figure 1

15 pages, 22263 KiB  
Article
Application of a Bi-Mamba Model for Railway Subgrade Settlement Prediction During Pipe-Jacking Tunneling
by Yipu Peng, Ning Zhou, Bin Wang and Hongjun Gan
Appl. Sci. 2025, 15(14), 7790; https://doi.org/10.3390/app15147790 - 11 Jul 2025
Viewed by 218
Abstract
To explore a more accurate prediction method for subgrade settlement induced by underpass construction, this study takes the existing railway project of Ningbo Yuanyi Road underpass as a case to construct a subgrade settlement prediction model based on the Mamba neural network. Using [...] Read more.
To explore a more accurate prediction method for subgrade settlement induced by underpass construction, this study takes the existing railway project of Ningbo Yuanyi Road underpass as a case to construct a subgrade settlement prediction model based on the Mamba neural network. Using monitoring data collected using on-site automated monitoring robots as the data foundation, the prediction results of the improved transformer, long short-term memory (LSTM), time-series dense encoder (Tide), and decomposition-linear (Dlinear) neural networks are compared. The research results show that the Mean Squared Error (MSE) and Mean Absolute Error (MAE) of the proposed Bi-Mamba model are 0.279 and 0.276, respectively, demonstrating higher prediction accuracy than comparative models such as iTransformer and LSTM. Additionally, ablation experiments verify that the attention gating module in the model reduces the MSE by 9.1%, serving as a key component for improving accuracy. This study provides an advanced data-driven prediction method for subgrade settlement forecasting, offering technical references for similar engineering projects. Full article
Show Figures

Figure 1

22 pages, 4091 KiB  
Article
Research on the Deformation Laws of Adjacent Structures Induced by the Shield Construction Parameters
by Jinhua Wang, Nengzhong Lei, Xiaolin Tang and Yulin Wang
Buildings 2025, 15(14), 2426; https://doi.org/10.3390/buildings15142426 - 10 Jul 2025
Viewed by 173
Abstract
Taking the shield construction of Xiamen Metro Line 2 tunnel side-crossing the Tianzhushan overpass and under-crossing the Shen-Hai Expressway as the engineering background, FLAC3D 6.0 software was used to examine the deformation of adjacent structures based on shield construction parameters in upper-soft and [...] Read more.
Taking the shield construction of Xiamen Metro Line 2 tunnel side-crossing the Tianzhushan overpass and under-crossing the Shen-Hai Expressway as the engineering background, FLAC3D 6.0 software was used to examine the deformation of adjacent structures based on shield construction parameters in upper-soft and lower-hard strata. The reliability of the numerical simulation results was verified by comparing measured and predicted deformations. The study results indicate that deformation of the pile will occur during the construction of the tunnel shield next to the pile foundation. The shape of the pile deformation curve in the horizontal direction is significantly influenced by the distance from the pile foundation to the adjacent tunnel’s centerline, as well as by soil bin pressure, grouting layer thickness, and stress release coefficient. During the tunnel shield construction beneath the expressway, increasing the soil bin pressure, the grouting layer thickness, and reducing the stress release coefficient can effectively minimize surface deformation and differential settlement on both sides of the deformation joints between the bridge and the roadbed. The practice shows that, by optimizing shield construction parameters in upper-soft and lower-hard strata, the deformation of nearby bridges and pavements can be kept within allowable limits. This is significant for reducing construction time and costs. The findings offer useful references for similar projects. Full article
(This article belongs to the Special Issue Urban Renewal: Protection and Restoration of Existing Buildings)
Show Figures

Figure 1

17 pages, 5238 KiB  
Article
Study on Reinforcement Technology of Shield Tunnel End and Ground Deformation Law in Shallow Buried Silt Stratum
by Jia Zhang and Xiankai Bao
Appl. Sci. 2025, 15(14), 7657; https://doi.org/10.3390/app15147657 - 8 Jul 2025
Viewed by 247
Abstract
With the rapid advancement of urban underground space development, shield tunnel construction has seen a significant increase. However, at the initial launching stage of shield tunnels in shallow-buried weak strata, engineering risks such as face instability and sudden surface settlement frequently occur. At [...] Read more.
With the rapid advancement of urban underground space development, shield tunnel construction has seen a significant increase. However, at the initial launching stage of shield tunnels in shallow-buried weak strata, engineering risks such as face instability and sudden surface settlement frequently occur. At present, there are relatively few studies on the reinforcement technology of the initial section of shield tunnel in shallow soft ground and the evolution law of ground disturbance. This study takes the launching section of the Guanggang New City depot access tunnel on Guangzhou Metro Line 10 as the engineering background. By applying MIDAS/GTS numerical simulation, settlement monitoring, and theoretical analysis, the reinforcement technology at the tunnel face, the spatiotemporal evolution of ground settlement, and the mechanism of soil disturbance transmission during the launching process in muddy soil layer are revealed. The results show that: (1) the reinforcement scheme combining replacement filling, high-pressure jet grouting piles, and soil overburden counterpressure significantly improves surface settlement control. The primary influence zone is concentrated directly above the shield machine and in the forward excavation area. (2) When the shield machine reaches the junction between the reinforced and unreinforced zones, a large settlement area forms, with the maximum ground settlement reaching −26.94 mm. During excavation in the unreinforced zone, ground deformation mainly occurs beneath the rear reinforced section, with subsidence at the crown and uplift at the invert. (3) The transverse settlement trough exhibits a typical Gaussian distribution and the discrepancy between the measured maximum settlement and the numerical and theoretical values is only 3.33% and 1.76%, respectively. (4) The longitudinal settlement follows a trend of initial increase, subsequent decrease, and gradual stabilization, reaching a maximum when the excavation passes directly beneath the monitoring point. The findings can provide theoretical reference and engineering guidance for similar projects. Full article
Show Figures

Figure 1

18 pages, 4449 KiB  
Article
Analysis and Application of Critical Pressure Prediction Model for Surface Leakage of Underwater Shallow Buried Jacking-Pipe Grouting
by Ziguang Zhang, Yong He, Xiaopeng Li, Xiang Li, Lin Wei and Feifei Chen
Buildings 2025, 15(13), 2359; https://doi.org/10.3390/buildings15132359 - 5 Jul 2025
Viewed by 227
Abstract
Jacking-pipe construction has the advantages of high mechanization, low environmental impact and fast construction speed. It is widely used in the project of underground pipeline under river. However, jacking-pipe grouting under shallow burial conditions is prone to cause surface bubbling problems. Based on [...] Read more.
Jacking-pipe construction has the advantages of high mechanization, low environmental impact and fast construction speed. It is widely used in the project of underground pipeline under river. However, jacking-pipe grouting under shallow burial conditions is prone to cause surface bubbling problems. Based on the jacking-pipe project of Meichong Lake in Changfeng County, Hefei, this paper discussed the mechanism of grouting surface leakage, and defined the relationship between the critical pressure of jacking-pipe grouting and the ultimate pressure of shear damage of mud jacket. Mechanical model of surface leakage from shallow buried jacking-pipe grouting was established. A general mathematical expression for the grouting critical pressure was derived and a sensitivity analysis was performed. A numerical model was established based on the background engineering, and multiple sets of grouting pressure conditions for simulation and analysis were set up. The results showed that the cohesive force c, the angle of internal friction φ, and the overburden thickness hs were all approximately linearly and positively correlated with the critical pressure of grouting. When the grouting pressure was less than 197.54 kPa the surface settlement increased. When this value was exceeded the surface displacement changed from settlement to uplift and the risk of slurry bubbling increased significantly. The theoretical calculation matched the value of grouting critical pressure from numerical simulation. The actual grouting pressure in the project was lower than the theoretical grouting critical pressure value and no slurry bubbling occurred during construction, which had verified the reliability of the theoretical model. This study can provide theoretical basis and investigation ideas for the setting of reasonable grouting pressure in similar projects. Full article
(This article belongs to the Section Building Structures)
Show Figures

Figure 1

26 pages, 8827 KiB  
Article
Three-Dimensional Refined Numerical Modeling of Artificial Ground Freezing in Metro Cross-Passage Construction: Thermo-Mechanical Coupling Analysis and Field Validation
by Qingzi Luo, Junsheng Li, Wei Huang, Wanying Wang and Bingxiang Yuan
Buildings 2025, 15(13), 2356; https://doi.org/10.3390/buildings15132356 - 4 Jul 2025
Viewed by 244
Abstract
The artificial ground freezing method (AGF) is widely used in underground construction to reinforce the ground and ensure construction safety. This study systematically evaluates the implementation of the artificial ground freezing method in the construction of a metro tunnel cross-passage, with a focus [...] Read more.
The artificial ground freezing method (AGF) is widely used in underground construction to reinforce the ground and ensure construction safety. This study systematically evaluates the implementation of the artificial ground freezing method in the construction of a metro tunnel cross-passage, with a focus on analyzing the soil’s thermo-mechanical behavior and assessing safety performance throughout the construction process. A combined approach integrating field monitoring and refined three-dimensional numerical simulation using FLAC3D is adopted, considering critical factors, such as freezing pipe inclination, thermo-mechanical coupling, and ice–water phase transitions. Both field data and simulation results demonstrate that increasing the density of freezing pipes accelerates temperature reduction and intensifies frost heave-induced displacements near the pipes. After 45 days of active freezing, the freezing curtain reaches a thickness of 3.7 m with an average temperature below −10 °C. Extending the freezing duration beyond this period yields negligible improvement in curtain performance. Frost heave deformation develops rapidly during the initial phase and stabilizes after approximately 25 days, with maximum vertical displacements reaching 12 cm. Significant stress concentrations occur in the soil adjacent to the freezing pipes, with shield tunnel segments experiencing up to 5 MPa of stress. Thaw settlement is primarily concentrated in areas previously affected by frost heave, with a maximum settlement of 3 cm. Even after 45 days of natural thawing, a frozen curtain approximately 3.3 m thick remains intact, maintaining sufficient structural strength. The refined numerical model accurately captures the mechanical response of soil during the freezing and thawing processes under realistic engineering conditions, with field monitoring data validating its effectiveness. This research provides valuable guidance for managing construction risks and ensuring safety in similar cross-passage and cross-river tunnel projects, with broader implications for underground engineering requiring precise control of frost heave and thaw settlement. Full article
Show Figures

Figure 1

22 pages, 2334 KiB  
Article
Prediction of Surface Deformation Induced by Ultra-Shallow-Buried Pilot Tunnel Construction
by Caijun Liu, Xiangdong Li, Yang Yang, Xing Gao, Yupeng Shen and Peng Jing
Appl. Sci. 2025, 15(13), 7546; https://doi.org/10.3390/app15137546 - 4 Jul 2025
Viewed by 220
Abstract
The prediction of ground deformation during ultra-shallow-buried pilot tunnel construction is critical for urban rail transit projects in complex geological settings, yet existing cross-section models often lack accuracy. This study proposes an enhanced non-uniform convergence model based on stochastic medium theory, which decomposes [...] Read more.
The prediction of ground deformation during ultra-shallow-buried pilot tunnel construction is critical for urban rail transit projects in complex geological settings, yet existing cross-section models often lack accuracy. This study proposes an enhanced non-uniform convergence model based on stochastic medium theory, which decomposes surface settlement into uniform soil shrinkage and non-uniform initial support deformation. A computational formula for horseshoe-shaped sections is derived and validated through field data from Kunming Rail Transit Phase I, demonstrating a 59% improvement in maximum settlement prediction accuracy (reducing error from 7.5 mm to 3.1 mm) compared to traditional methods. Its application to Beijing Metro Line 13 reveals two distinct deformation patterns: significant ground heave occurs at 2.5 times the tunnel width from the centerline, while maximum settlement concentrates above the excavation center and diminishes radially. To mitigate heave, early strengthening of the secondary lining is recommended to control initial horizontal deformation. These findings enhance prediction reliability and provide actionable insights for deformation control in similar urban tunneling projects, particularly under ultra-shallow burial conditions. Full article
Show Figures

Figure 1

23 pages, 4982 KiB  
Article
Analysis of Influence of Cut-and-Cover Method on Retaining Structures and Differential Settlement in Subway Foundation Pit Construction
by Yi Liu, Lei Huang, Xiaolin Tang, Yanbin Xue, Wenbin Ke, Yang Luo and Lingxiao Guan
Appl. Sci. 2025, 15(13), 7520; https://doi.org/10.3390/app15137520 - 4 Jul 2025
Viewed by 226
Abstract
This study established a numerical model for a foundation pit at the Zhongyilu Station of the Wuhan Metro Line 12, using Plaxis3D version 2021 finite element software to examine the horizontal displacement of the diaphragm wall, ground surface settlement, and differential settlement between [...] Read more.
This study established a numerical model for a foundation pit at the Zhongyilu Station of the Wuhan Metro Line 12, using Plaxis3D version 2021 finite element software to examine the horizontal displacement of the diaphragm wall, ground surface settlement, and differential settlement between the diaphragm wall and the lattice columns across various construction stages. A comparison with the cut-and-cover method prompted the adoption of a strategy that integrates segmental pouring of the main structure and the installation of internal supports to optimize the original scheme. The results indicated that as the foundation pit was excavated, both the horizontal displacement of diaphragm wall and the ground surface settlement gradually increased, while the differential settlement between the diaphragm wall and the lattice columns shows exhibited an initial decrease followed by an increase. In comparison to the cut-and-cover method, the cover-and-cut method demonstrated greater efficacy in controlling foundation pit deformation and minimizing disturbances to surrounding environment. As the number of segmental pouring layers and support levels increased, the overall deformation of the foundation pit showed a gradual decreasing trend, and the differential settlement between the diaphragm wall and the lattice columns continued to fluctuate. When each floor slab was poured in three layers with two supports placed in the middle, the maximum horizontal displacement of the diaphragm wall could be reduced by 22.47%, and the maximum ground surface settlement could be decreased by 19.01%. The findings in this research can provide valuable basis and reference for the design and construction of similar projects. Full article
(This article belongs to the Special Issue Advances and Challenges in Rock Mechanics and Rock Engineering)
Show Figures

Figure 1

25 pages, 16597 KiB  
Article
Earthquake Destruction and Resilience in Ancient Helike, Gulf of Corinth, Greece: A Case Study of Past Human–Environment Relationship
by Dora Katsonopoulou, Ioannis Koukouvelas and Mariza Kormann
Land 2025, 14(7), 1392; https://doi.org/10.3390/land14071392 - 2 Jul 2025
Viewed by 685
Abstract
Geoarchaeological work and excavations of the Helike Project over the last 30 years in the Helike coastal plain, Gulf of Corinth, have yielded abundant evidence on ancient settlements, as well as the surrounding landscape and environmental changes that resulted from geological phenomena and [...] Read more.
Geoarchaeological work and excavations of the Helike Project over the last 30 years in the Helike coastal plain, Gulf of Corinth, have yielded abundant evidence on ancient settlements, as well as the surrounding landscape and environmental changes that resulted from geological phenomena and catastrophic events. The research methods applied by the Helike Project followed a multidisciplinary approach, including combined archaeological excavations and palaeoseismological trenching, geophysical prospection, archaeometric, environmental, and soil micromorphology analyses, and computer-based landscape modelling. A wealth of settlement remains that were unearthed across the plain, ranging in date from the Early Helladic period (3rd millennium BC) to the Late Antiquity (5th century AD), indicates that the ancient inhabitants of the area chose to always resettle in the area by adjusting their ways of living to the geomorphology and natural hazards, prevailing each time. Our results show that disasters in the area increased between the Geometric and Roman times due to severe earthquakes that occurred approximately every 300 years. In particular, archaeological and geological finds recovered from the Late Classical–Hellenistic Helike settlement, which was revived in the western part of the plain shortly after the disastrous 373 BC earthquake, have enriched our knowledge regarding the historical seismicity of the region and past human–environment relationships. Full article
(This article belongs to the Special Issue Archaeological Landscape and Settlement II)
Show Figures

Figure 1

14 pages, 1630 KiB  
Article
Research on the Initial Launching Technology of Subway Shield Tunneling in Complex Terrain and Numerical Simulation of Soil Deformation
by Jiangka Wang, Hui Li, Xujie Li, Xingzhong Nong, Chen Liu and Tao Yang
Buildings 2025, 15(13), 2222; https://doi.org/10.3390/buildings15132222 - 25 Jun 2025
Viewed by 376
Abstract
Using the shield project of the Cai Cang Section tunnel of the Guangzhou Metro Line 13 to solve the problem that shield construction is difficult to start in a narrow space and it is easy to disturb the surrounding buildings and pipelines, the [...] Read more.
Using the shield project of the Cai Cang Section tunnel of the Guangzhou Metro Line 13 to solve the problem that shield construction is difficult to start in a narrow space and it is easy to disturb the surrounding buildings and pipelines, the corresponding shield tunneling parameters, construction and transportation plans, residual soil management plans, and grouting reinforcement plans are designed. These are tailored according to different working conditions. Meanwhile, the MIDAS GTS 2022 numerical simulation software is applied to simulate and analyze the impact of shield tunneling construction on soil deformation, and to compare the effects before and after reinforcement of the soil layer during shield tunneling. The results show the amount of disturbance of building pipelines along the tunnel are effectively controlled by designing the corresponding shield tunneling parameters for three working conditions: contact reinforcement zone, entering reinforcement zone, and exiting reinforcement zone. In narrow spaces, three kinds of construction transportation modes (namely, horizontal transportation in the tunnel, translation transportation in the cross passage, and vertical transportation) ensure the smooth transportation of pipe segments and the smooth discharge of shield dregs. After the reinforced area is constructed, secondary grouting with cement mortar effectively reduces the erosion concrete segments by underground water. By comparing the deformation of the tunnel soil layer before and after reinforcement, it is found that the maximum surface deformation of the soil layer is significantly reduced after reinforcement. Specifically, the maximum settlement and maximum uplift are 0.782 mm and 1.87 mm respectively, which represent a reduction of 1.548 mm in the maximum surface settlement, and 0.16 mm in the maximum uplift compared with the unreinforced soil layer. This indicates that setting up a soil reinforcement zone during the initial launching stage can effectively reduce soil deformation. The Cai Cang Section tunnel shield project successfully completed the shield construction in a narrow space, which can be a reference and guide for similar projects. Full article
Show Figures

Figure 1

16 pages, 2782 KiB  
Article
Construction Scheme and Influence Analysis of Horizontal Small-Clear-Distance Shield Tunnel
by Xujie Li, Hui Li, Yabin Cheng, Bing Zhang, Ming Qiao and Tao Yang
Buildings 2025, 15(13), 2142; https://doi.org/10.3390/buildings15132142 - 20 Jun 2025
Viewed by 284
Abstract
Based on the construction project of Guangzhou Metro Line 13, this paper explores the special construction scheme for the safety of horizontal small-clear-distance shield tunnel construction, which adopts the construction of a tunnel first and a station later in the actual project to [...] Read more.
Based on the construction project of Guangzhou Metro Line 13, this paper explores the special construction scheme for the safety of horizontal small-clear-distance shield tunnel construction, which adopts the construction of a tunnel first and a station later in the actual project to reduce the impact on the tunnel segment and the existing bridge piles. At the same time, the MIDAS GTS(2022R1) geotechnical and structural finite element analysis software is used to simulate and analyze the shield excavation process by using the stratum–structure modeling method, and the effect of grouting reinforcement in the tunnel is compared and analyzed. Through the research and analysis of the displacement and deformation of the model, the rationality and effectiveness of grouting reinforcement are explored to ensure the smooth implementation of the special construction scheme. The test results show that the implementation of grouting reinforcement measures in the tunnel can effectively control the horizontal deformation of the existing bridge piles and the horizontal deformation of the left line segment of the small-clear-distance section, and the above two deformation indexes are reduced by 67.7% and 72.1%, respectively, compared with the non-reinforcement condition. The settlement deformation of the segment and the surrounding existing bridge piles meets the requirements of the code, so the construction scheme is basically feasible. Full article
Show Figures

Figure 1

17 pages, 3061 KiB  
Article
Safety Risk Assessment of Double-Line Tunnel Crossings Beneath Existing Tunnels in Complex Strata
by Bafeng Ren, Shengbin Hu, Min Hu, Zhi Chen and Hang Lin
Buildings 2025, 15(12), 2103; https://doi.org/10.3390/buildings15122103 - 17 Jun 2025
Viewed by 290
Abstract
With the acceleration of urbanization, the development of urban rail transit networks has become an essential component of modern urban transportation. The construction of new urban rail transit lines often involves crossing existing operational lines, posing significant safety risks and technical challenges. This [...] Read more.
With the acceleration of urbanization, the development of urban rail transit networks has become an essential component of modern urban transportation. The construction of new urban rail transit lines often involves crossing existing operational lines, posing significant safety risks and technical challenges. This paper presents a comprehensive study on the safety risk assessment and control measures for the construction of new double-line shield tunnels crossing beneath existing tunnels in complex strata, using the project of Line 5 of the Nanning Urban Rail Transit crossing beneath the existing Line 2 interval tunnel as a case study. This study employs methods such as status investigation, numerical simulation, and field measurement to analyze the construction risks. Key findings include the successful identification and control of major risk sources through refined risk assessment and comprehensive technical measurement. The maximum settlement of the existing tunnel was effectively controlled at −2.55 mm, well within the deformation monitoring control values. This study demonstrates that optimized shield machine selection, improved lining design, interlayer soil reinforcement, the dynamic adjustment of shield parameters, and the precise measurement of shield posture significantly enhance the efficiency of shield tunneling and construction safety. The results provide a valuable reference for the settlement and deformation control of similar projects. Full article
(This article belongs to the Special Issue Structural Analysis of Underground Space Construction)
Show Figures

Figure 1

14 pages, 6670 KiB  
Article
Numerical Simulation of Horizontal Barrier in Controlling Groundwater and Deformation During Foundation Pit Dewatering
by Ruonan Kuang, Changjie Xu, Chaofeng Zeng, Xiuli Xue, Youwu Zhao, Bin Li and Lijuan Yi
Water 2025, 17(12), 1763; https://doi.org/10.3390/w17121763 - 12 Jun 2025
Viewed by 376
Abstract
In water-rich strata, a traditional vertical barrier exhibits certain limitations when applied to deep foundation pit construction under complex geological conditions, such as it is difficult to completely cut off deep and thick aquifer, which may pose potential risks during pit dewatering. To [...] Read more.
In water-rich strata, a traditional vertical barrier exhibits certain limitations when applied to deep foundation pit construction under complex geological conditions, such as it is difficult to completely cut off deep and thick aquifer, which may pose potential risks during pit dewatering. To address the above challenge, this study introduced a mixed barrier system in which the horizontal barrier (HB) was set at the bottom of the foundation pit and was combined with the enclosure wall to collectively retard groundwater seepage into the pit. Based on an actual project in Tianjin, this study established HB models with varying numbers of its layers using ABAQUS 6.14 software. It systematically investigated the effect of HB on groundwater drawdown, ground surface settlement, and enclosure deflection during foundation pit dewatering. The research shows that HB can significantly reduce the magnitude of external water level drawdown by altering groundwater seepage paths while effectively controlling soil settlement. Furthermore, it exhibits favorable overall restraining effects on wall deformation. Varying the number of horizontal barrier layers (L) exhibits an insignificant effect on water-blocking and subsidence-control performance. However, the constraint effect on the enclosure shows a correlation with L. Full article
(This article belongs to the Section Hydrogeology)
Show Figures

Figure 1

Back to TopTop