Skip Content
You are currently on the new version of our website. Access the old version .

5 Results Found

  • Article
  • Open Access
1,059 Views
11 Pages

23 May 2025

The erosion of Pelton turbine components in mountainous areas with high sediment input is a major challenge for energy- and cost-efficient operation. Quantitative data on possible efficiency losses associated with local damage are needed. A systemati...

  • Article
  • Open Access
1 Citations
1,190 Views
22 Pages

Efficiency Testing of Pelton Turbines with Artificial Defects—Part 1: Buckets

  • Florian Fahrni,
  • Thomas Staubli and
  • Ernesto Casartelli

23 May 2025

Pelton turbines are susceptible to hydro-abrasive erosion from sediment-laden flows, resulting in a progressive loss of efficiency. Typical defect classes can be derived from the analysis of such damage observed in hydropower plants. A systematic str...

  • Review
  • Open Access
9 Citations
7,995 Views
16 Pages

Discrepancies in Embryonic Staging: Towards a Gold Standard

  • Sander Flierman,
  • Melanie Tijsterman,
  • Melek Rousian and
  • Bernadette S. de Bakker

26 April 2023

For over half a century, the Carnegie staging system has been used for the unification of chronology in human embryo development. Despite the system’s establishment as a “universal” system, Carnegie staging reference charts display...

  • Article
  • Open Access
12 Citations
3,676 Views
22 Pages

Reduced-Scale Models of Variable Speed Hydro-Electric Plants for Power Hardware-in-the-Loop Real-Time Simulations

  • Baoling Guo,
  • Amgad Mohamed,
  • Seddik Bacha,
  • Mazen Alamir,
  • Cédric Boudinet and
  • Julien Pouget

3 November 2020

Variable Speed Hydro-Electric Plant (VS-HEP) equipped with power electronics has been increasingly introduced into the hydraulic context. This paper is targeting a VS-HEP Power Hardware-In-the-Loop (PHIL) real-time simulation system, which is dedicat...

  • Article
  • Open Access
5 Citations
5,634 Views
17 Pages

23 August 2024

Investigating the flow performance of Francis turbines from model to prototype is a complex but essential process for ensuring reliable and efficient turbine operation in hydropower plants. It ensures that Francis turbine designs operate efficiently...