The authors wish to make the following corrections to this paper [1]:
Figures and Tables Legend
In the original publication, “[41]” was not cited. The citation has now been inserted in “Figures 3 and 4, and Tables 2 and 3” and should read:
- “Figure 3. Construction plan of twin tunnels for (a) Project 1 and (b) Project 2 [41].”
- “Figure 4. Cross-sectional geological profiles for (a) Project 1 and (b) Project 2 (unit: m) (Kannangara et al., 2022) [41].”
- “Table 2. Soil physical properties of projects (1 and 2) [41].”
- “Table 3. List of input features and target variable considered for analysis [41].”
Text Addition
One sentence has been added to the end of “Section 2.3”:
“It is to be noted that the data preparation process were carried out as recommended by Kannangara et al. [41] and the data is further refined as explained in Section 2.4 below.”
Reference
Reference [41] has been changed to:
“41. Kannangara, K.P.M.; Zhou, W.H.; Ding, Z.; Hong, Z.H. Investigation of feature contribution to shield tunneling-induced settlement using Shapley additive explanations method. J. Rock Mech. Geotech. Eng. 2022, 14, 1052–1063.”
With this correction, there is no change in the order of references.
Missing Acknowledgments
In the original publication, the statement “The dataset used in this research consists of 264 data samples adopted from the following study by Professor Wanhuan Zhou (State Key Laboratory of Internet of Things for Smart City and Department of Civil and Environmental Engineering, University of Macau, Macau, China) and her team, to whom we are grateful: Kannangara, K.P.M.; Zhou, W.H.; Ding, Z.; Hong, Z.H. Investigation of feature contribution to shield tunneling-induced settlement using Shapley additive explanations method. J. Rock Mech. Geotech. Eng. 2022, 14, 1052–1063.” was not included.
Data Availability Statement
In the published publication, there was an error regarding the Data Availability Statement. The updated statement is:
“The dataset used in this study is available on GitHub at https://github.com/umgeotech/Database/tree/master/Surface%20Settlement (accessed on: 6 September 2022). For any inquiries, please contact the corresponding author of the current manuscript.”
The authors state that the scientific conclusions are unaffected. This correction was approved by the Academic Editor. The original publication has also been updated.
Reference
- Hussaine, S.M.; Mu, L. Intelligent Prediction of Maximum Ground Settlement Induced by EPB Shield Tunneling Using Automated Machine Learning Techniques. Mathematics 2022, 10, 4637. [Google Scholar] [CrossRef]
Disclaimer/Publisher’s Note: The statements, opinions and data contained in all publications are solely those of the individual author(s) and contributor(s) and not of MDPI and/or the editor(s). MDPI and/or the editor(s) disclaim responsibility for any injury to people or property resulting from any ideas, methods, instructions or products referred to in the content. |
© 2023 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/).