Djenadic, S.; Ignjatovic, D.; Tanasijevic, M.; Bugaric, U.; Jankovic, I.; Subaranovic, T.
Development of the Availability Concept by Using Fuzzy Theory with AHP Correction, a Case Study: Bulldozers in the Open-Pit Lignite Mine. Energies 2019, 12, 4044.
https://doi.org/10.3390/en12214044
AMA Style
Djenadic S, Ignjatovic D, Tanasijevic M, Bugaric U, Jankovic I, Subaranovic T.
Development of the Availability Concept by Using Fuzzy Theory with AHP Correction, a Case Study: Bulldozers in the Open-Pit Lignite Mine. Energies. 2019; 12(21):4044.
https://doi.org/10.3390/en12214044
Chicago/Turabian Style
Djenadic, Stevan, Dragan Ignjatovic, Milos Tanasijevic, Ugljesa Bugaric, Ivan Jankovic, and Tomislav Subaranovic.
2019. "Development of the Availability Concept by Using Fuzzy Theory with AHP Correction, a Case Study: Bulldozers in the Open-Pit Lignite Mine" Energies 12, no. 21: 4044.
https://doi.org/10.3390/en12214044
APA Style
Djenadic, S., Ignjatovic, D., Tanasijevic, M., Bugaric, U., Jankovic, I., & Subaranovic, T.
(2019). Development of the Availability Concept by Using Fuzzy Theory with AHP Correction, a Case Study: Bulldozers in the Open-Pit Lignite Mine. Energies, 12(21), 4044.
https://doi.org/10.3390/en12214044