Cueto, M.; De la Puente, P.; López-Fernández, C.; Pando, L.; Arias, D.
Karst Detection, Prevention and Correction: A Case Study along the Riyadh Metro Line 3 (Saudi Arabia). Proceedings 2018, 2, 1429.
https://doi.org/10.3390/proceedings2231429
AMA Style
Cueto M, De la Puente P, López-Fernández C, Pando L, Arias D.
Karst Detection, Prevention and Correction: A Case Study along the Riyadh Metro Line 3 (Saudi Arabia). Proceedings. 2018; 2(23):1429.
https://doi.org/10.3390/proceedings2231429
Chicago/Turabian Style
Cueto, Manuel, Pablo De la Puente, Carlos López-Fernández, Luis Pando, and Daniel Arias.
2018. "Karst Detection, Prevention and Correction: A Case Study along the Riyadh Metro Line 3 (Saudi Arabia)" Proceedings 2, no. 23: 1429.
https://doi.org/10.3390/proceedings2231429
APA Style
Cueto, M., De la Puente, P., López-Fernández, C., Pando, L., & Arias, D.
(2018). Karst Detection, Prevention and Correction: A Case Study along the Riyadh Metro Line 3 (Saudi Arabia). Proceedings, 2(23), 1429.
https://doi.org/10.3390/proceedings2231429