- Article
5 Citations
3,871 Views
15 Pages
Pressure Drop Optimization of the Main Steam and Reheat Steam System of a 1000 MW Secondary Reheat Unit
- Yanfeng Li,
- Jingru Liu and
- Guohe Huang
The pressure drop of a main steam and reheat steam system should be optimized during the design and operation of a thermal power plant to minimize operation costs. In this study, the pressure drop of the main steam pipe and reheat steam pipe of a 100...