Next Article in Journal
An Experimental Study on the Bond–Slip Relationship between Rebar and Ultra-High-Performance Concrete Grouted in Bellows
Next Article in Special Issue
Collaborative BIM-Based Construction Coordination Progress Modeling Using Extended Collaborative Process Modeling (exCPM)
Previous Article in Journal
Effect of an Artificial Sound-Based Index on the Perception of Historical Block Environments
Previous Article in Special Issue
Investigating the Source of Claims with the Importance of BIM Application on Reducing Construction Disputable Claims in KSA
 
 
Article

Article Versions Notes

Buildings 2023, 13(9), 2373; https://doi.org/10.3390/buildings13092373
Action Date Notes Link
article xml file uploaded 18 September 2023 13:41 CEST Original file -
article xml uploaded. 18 September 2023 13:41 CEST Update https://www.mdpi.com/2075-5309/13/9/2373/xml
article pdf uploaded. 18 September 2023 13:41 CEST Version of Record https://www.mdpi.com/2075-5309/13/9/2373/pdf
article html file updated 18 September 2023 13:44 CEST Original file https://www.mdpi.com/2075-5309/13/9/2373/html
Back to TopTop