Dotres-Zúñiga, S.; Zúñiga-Igarza, L.M.; Sánchez-RodrÃguez, A.; GarcÃa-Vidal, G.; MartÃnez-Vivar, R.; Pérez-Campdesuñer, R.
A Data-Driven Procedure for Cost and Risk Control in Construction Investments: Quantifying Budget Gaps via Expert Scoring and Probabilistic Simulation—Evidence from a Heritage Hotel Project. Buildings 2026, 16, 1410.
https://doi.org/10.3390/buildings16071410
AMA Style
Dotres-Zúñiga S, Zúñiga-Igarza LM, Sánchez-RodrÃguez A, GarcÃa-Vidal G, MartÃnez-Vivar R, Pérez-Campdesuñer R.
A Data-Driven Procedure for Cost and Risk Control in Construction Investments: Quantifying Budget Gaps via Expert Scoring and Probabilistic Simulation—Evidence from a Heritage Hotel Project. Buildings. 2026; 16(7):1410.
https://doi.org/10.3390/buildings16071410
Chicago/Turabian Style
Dotres-Zúñiga, Silvia, Libys Martha Zúñiga-Igarza, Alexander Sánchez-RodrÃguez, Gelmar GarcÃa-Vidal, Rodobaldo MartÃnez-Vivar, and Reyner Pérez-Campdesuñer.
2026. "A Data-Driven Procedure for Cost and Risk Control in Construction Investments: Quantifying Budget Gaps via Expert Scoring and Probabilistic Simulation—Evidence from a Heritage Hotel Project" Buildings 16, no. 7: 1410.
https://doi.org/10.3390/buildings16071410
APA Style
Dotres-Zúñiga, S., Zúñiga-Igarza, L. M., Sánchez-RodrÃguez, A., GarcÃa-Vidal, G., MartÃnez-Vivar, R., & Pérez-Campdesuñer, R.
(2026). A Data-Driven Procedure for Cost and Risk Control in Construction Investments: Quantifying Budget Gaps via Expert Scoring and Probabilistic Simulation—Evidence from a Heritage Hotel Project. Buildings, 16(7), 1410.
https://doi.org/10.3390/buildings16071410