Next Article in Journal
A Study on Rational Pre-Tensioning Schemes for 60 m Prefabricated Railway Box Girders Considering Steel Formwork Constraints
Previous Article in Journal
Characterizing the Effects of Cloud-Based BIM Collaboration Tools on Design Coordination Processes
Previous Article in Special Issue
Artificial Intelligence (AI) in Construction Safety: A Systematic Literature Review
 
 
Article

Article Versions Notes

Buildings 2026, 16(7), 1318; https://doi.org/10.3390/buildings16071318
Action Date Notes Link
article html file updated 26 March 2026 12:28 CET Original file https://www.mdpi.com/2075-5309/16/7/1318/html
article pdf uploaded. 26 March 2026 12:25 CET Version of Record https://www.mdpi.com/2075-5309/16/7/1318/pdf
article xml uploaded. 26 March 2026 12:25 CET Update https://www.mdpi.com/2075-5309/16/7/1318/xml
article xml file uploaded 26 March 2026 12:25 CET Original file -
Back to TopTop