Next Article in Journal
Computational Precedent-Based Instruction (CPBI): Integrating Precedents and BIM-Based Parametric Modeling in Architectural Design Studio
Next Article in Special Issue
Concrete Carbonization Prediction Method Based on Bagging and Boosting Fusion Framework
Previous Article in Journal
Research on Dynamic Optimization of a Critical Path Based on Stochastic Duration and the Earned Value Method
Previous Article in Special Issue
Cost-Effectiveness of Reinforced Recycled Aggregate Concrete Structures with Fly Ash and Basalt Fibres Under Corrosion: A Life Cycle Cost Analysis
 
 
Article

Article Versions Notes

Buildings 2025, 15(8), 1286; https://doi.org/10.3390/buildings15081286
Action Date Notes Link
article xml file uploaded 14 April 2025 13:12 CEST Original file -
article xml uploaded. 14 April 2025 13:12 CEST Update -
article pdf uploaded. 14 April 2025 13:12 CEST Version of Record -
article html file updated 14 April 2025 13:13 CEST Original file -
article xml file uploaded 14 April 2025 14:27 CEST Update -
article xml uploaded. 14 April 2025 14:27 CEST Update https://www.mdpi.com/2075-5309/15/8/1286/xml
article pdf uploaded. 14 April 2025 14:27 CEST Updated version of record https://www.mdpi.com/2075-5309/15/8/1286/pdf
article html file updated 14 April 2025 14:29 CEST Update -
article html file updated 25 June 2025 00:17 CEST Update https://www.mdpi.com/2075-5309/15/8/1286/html
Back to TopTop