Zhang, K.; Zhang, Y.; Zhou, S.; Wang, W.; Huang, B.; Zhai, G.; Qin, Z.
Application of Direct Current Method and Seismic Wave Method in Advanced Detection of TBM Construction Tunnels. Buildings 2025, 15, 3201.
https://doi.org/10.3390/buildings15173201
AMA Style
Zhang K, Zhang Y, Zhou S, Wang W, Huang B, Zhai G, Qin Z.
Application of Direct Current Method and Seismic Wave Method in Advanced Detection of TBM Construction Tunnels. Buildings. 2025; 15(17):3201.
https://doi.org/10.3390/buildings15173201
Chicago/Turabian Style
Zhang, Kai, Yuwen Zhang, Shungang Zhou, Wei Wang, Bin Huang, Guansen Zhai, and Zeshuai Qin.
2025. "Application of Direct Current Method and Seismic Wave Method in Advanced Detection of TBM Construction Tunnels" Buildings 15, no. 17: 3201.
https://doi.org/10.3390/buildings15173201
APA Style
Zhang, K., Zhang, Y., Zhou, S., Wang, W., Huang, B., Zhai, G., & Qin, Z.
(2025). Application of Direct Current Method and Seismic Wave Method in Advanced Detection of TBM Construction Tunnels. Buildings, 15(17), 3201.
https://doi.org/10.3390/buildings15173201