Next Article in Journal
A Comparison of the Project Management Methodologies PRINCE2 and PMBOK in Managing Repetitive Construction Projects
Next Article in Special Issue
Bias in the Estimation of Seismic Risk for Municipal Building Stocks Due to Limited Data
Previous Article in Journal
A Dynamic Model for Effective and Optimal Planning of Formwork in Construction Projects
Previous Article in Special Issue
Energy-Based Prediction of the Peak and Cumulative Response of a Reinforced Concrete Building with Steel Damper Columns
 
 
Article

Article Versions Notes

Buildings 2023, 13(7), 1795; https://doi.org/10.3390/buildings13071795
Action Date Notes Link
article xml file uploaded 14 July 2023 13:46 CEST Original file -
article xml uploaded. 14 July 2023 13:46 CEST Update https://www.mdpi.com/2075-5309/13/7/1795/xml
article pdf uploaded. 14 July 2023 13:46 CEST Version of Record https://www.mdpi.com/2075-5309/13/7/1795/pdf
article html file updated 14 July 2023 13:47 CEST Original file -
article html file updated 14 July 2023 13:48 CEST Update -
article html file updated 14 July 2023 13:50 CEST Update -
article html file updated 20 July 2023 22:24 CEST Update -
article html file updated 6 September 2025 17:37 CEST Update https://www.mdpi.com/2075-5309/13/7/1795/html
Back to TopTop