Ju, Y.; Sun, Y.; Ning, W.; Li, Q.; Lin, Y.; Chen, H.; Yang, S.
Cost Apportionment Method for Transmission and Distribution Projects Based on Multiple Apportionment Factors. Sustainability 2024, 16, 8844.
https://doi.org/10.3390/su16208844
AMA Style
Ju Y, Sun Y, Ning W, Li Q, Lin Y, Chen H, Yang S.
Cost Apportionment Method for Transmission and Distribution Projects Based on Multiple Apportionment Factors. Sustainability. 2024; 16(20):8844.
https://doi.org/10.3390/su16208844
Chicago/Turabian Style
Ju, Yongsheng, Yongyan Sun, Wenqin Ning, Qingguo Li, Yiya Lin, Hao Chen, and Shuxia Yang.
2024. "Cost Apportionment Method for Transmission and Distribution Projects Based on Multiple Apportionment Factors" Sustainability 16, no. 20: 8844.
https://doi.org/10.3390/su16208844
APA Style
Ju, Y., Sun, Y., Ning, W., Li, Q., Lin, Y., Chen, H., & Yang, S.
(2024). Cost Apportionment Method for Transmission and Distribution Projects Based on Multiple Apportionment Factors. Sustainability, 16(20), 8844.
https://doi.org/10.3390/su16208844