Sign in to use this feature.

Years

Between: -

Subjects

remove_circle_outline
remove_circle_outline
remove_circle_outline
remove_circle_outline
remove_circle_outline
remove_circle_outline
remove_circle_outline
remove_circle_outline
remove_circle_outline

Journals

Article Types

Countries / Regions

remove_circle_outline
remove_circle_outline
remove_circle_outline
remove_circle_outline

Search Results (213)

Search Parameters:
Keywords = slope excavation

Order results
Result details
Results per page
Select all
Export citation of selected articles as:
7 pages, 1182 KiB  
Comment
Comment on Tzampoglou, P.; Loupasakis, C. Hydrogeological Hazards in Open Pit Coal Mines–Investigating Triggering Mechanisms by Validating the European Ground Motion Service Product with Ground Truth Data. Water 2023, 15, 1474
by Georgios Louloudis, Christos Roumpos, Eleni Mertiri and Petros Kostaridis
Water 2025, 17(15), 2343; https://doi.org/10.3390/w17152343 - 7 Aug 2025
Abstract
The commented paper uses arbitrary and unsubstantiated hypotheses to attribute land subsidence phenomena in the Amyntaion basin to the operations of the Public Power Corporation (PPC) surface coal mine, disregarding, or at least grossly underestimating, the effect of about 600 pumped deep wells [...] Read more.
The commented paper uses arbitrary and unsubstantiated hypotheses to attribute land subsidence phenomena in the Amyntaion basin to the operations of the Public Power Corporation (PPC) surface coal mine, disregarding, or at least grossly underestimating, the effect of about 600 pumped deep wells for irrigation purposes all over the basin. In addition to the huge difference in the pumped quantities of water from the aquifer, ground water table lowering due to the PPC mine has negligible influence at distances over 500 m from the edge of the mine, while the areas examined in the paper are at distances of several kilometers from the edge of the mine. Furthermore, the authors attribute the landslide that occurred in the mine in 2017 to the steep excavation slopes of the mine and the increased groundwater pore pressure due to reduced peripheral pumping, which is completely inaccurate. To build their case, the authors of the commented paper disregard multiple references in research publications on the above issues, as explained in the main text of this discussion. Full article
Show Figures

Figure 1

17 pages, 2979 KiB  
Article
Discussion on the Design of Sprayed Eco-Protection for Near-Slope Roads Along Multi-Level Slopes
by Haonan Chen and Jianjun Ye
Appl. Sci. 2025, 15(15), 8408; https://doi.org/10.3390/app15158408 - 29 Jul 2025
Viewed by 138
Abstract
This study proposes a design method for near-slope roads along multi-level slopes that integrates excavation requirements and post-construction ecological restoration through sprayed eco-protection. Firstly, the design principles and procedural steps for near-slope roads are established. The planar layouts of multi-level slopes are categorized, [...] Read more.
This study proposes a design method for near-slope roads along multi-level slopes that integrates excavation requirements and post-construction ecological restoration through sprayed eco-protection. Firstly, the design principles and procedural steps for near-slope roads are established. The planar layouts of multi-level slopes are categorized, including mixing areas, turnaround areas, berms, and access ramps. Critical technical parameters, such as curve radii and widths of berms and ramps, as well as dimensional specifications for turnaround areas, are systematically formulated with corresponding design formulas. The methodology is applied to the ecological restoration project of multi-level slopes in the Huamahu mountainous area, and a comparative technical-economic analysis is conducted between the proposed design and the original scheme. Results demonstrate that the optimized design reduces additional maintenance costs caused by near-slope roads by 6.5–8.0% during the curing period. This research advances the technical framework for multi-level slope governance and enhances the ecological design standards for slope protection engineering. Full article
(This article belongs to the Section Earth Sciences)
Show Figures

Figure 1

18 pages, 3199 KiB  
Article
Geomechanical Basis for Assessing Open-Pit Slope Stability in High-Altitude Gold Mining
by Farit Nizametdinov, Rinat Nizametdinov, Denis Akhmatnurov, Nail Zamaliyev, Ravil Mussin, Nikita Ganyukov, Krzysztof Skrzypkowski, Waldemar Korzeniowski, Jerzy Stasica and Zbigniew Rak
Appl. Sci. 2025, 15(15), 8372; https://doi.org/10.3390/app15158372 - 28 Jul 2025
Viewed by 283
Abstract
The development of mining operations in high-altitude regions is associated with a number of geomechanical challenges caused by increased rock fracturing, adverse climatic conditions, and high seismic activity. These issues are particularly relevant for the exploitation of gold ore deposits, where the stability [...] Read more.
The development of mining operations in high-altitude regions is associated with a number of geomechanical challenges caused by increased rock fracturing, adverse climatic conditions, and high seismic activity. These issues are particularly relevant for the exploitation of gold ore deposits, where the stability of open-pit slopes directly affects both safety and extraction efficiency. The aim of this study is to develop and practically substantiate a comprehensive approach to assessing and ensuring slope stability, using the Bozymchak gold ore deposit—located in a high-altitude and seismically active zone—as a case study. The research involves the laboratory testing of rock samples obtained from engineering–geological boreholes, field shear tests on rock prisms, laser scanning of pit slopes, and digital geomechanical modeling. The developed calculation schemes take into account the structural features of the rock mass, geological conditions, and the design contours of the pit. In addition, special bench excavation technologies with pre-shear slotting and automated GeoMoS monitoring are implemented for real-time slope condition tracking. The results of the study make it possible to reliably determine the strength characteristics of the rocks under natural conditions, identify critical zones of potential collapse, and develop recommendations for optimizing slope parameters and mining technologies. The implemented approach ensures the required level of safety. Full article
(This article belongs to the Special Issue Latest Advances in Rock Mechanics and Geotechnical Engineering)
Show Figures

Figure 1

25 pages, 4994 KiB  
Article
Dynamic Slope Stability Assessment Under Blast-Induced Ground Vibrations in Open-Pit Mines: A Pseudo-Static Limit Equilibrium Approach
by Sami Ullah, Gaofeng Ren, Yongxiang Ge, Muhammad Burhan Memon, Eric Munene Kinyua and Theoneste Ndayiragije
Sustainability 2025, 17(14), 6642; https://doi.org/10.3390/su17146642 - 21 Jul 2025
Viewed by 506
Abstract
Blasting is one of the most widely used and cost-effective techniques for rock excavation and fragmentation in open-pit mining, particularly for large-scale operations. However, repeated or poorly controlled blasting can generate excessive ground vibrations that threaten slope stability by causing structural damage, fracturing [...] Read more.
Blasting is one of the most widely used and cost-effective techniques for rock excavation and fragmentation in open-pit mining, particularly for large-scale operations. However, repeated or poorly controlled blasting can generate excessive ground vibrations that threaten slope stability by causing structural damage, fracturing of the rock mass, and potential failure. Evaluating the effects of blast-induced vibrations is essential to ensure safe and sustainable mining operations. This study investigates the impact of blasting-induced vibrations on slope stability at the Saindak Copper-Gold Open-Pit Mine in Pakistan. A comprehensive dataset was compiled, including field-monitored ground vibration measurements—specifically peak particle velocity (PPV) and key blast design parameters such as spacing (S), burden (B), stemming length (SL), maximum charge per delay (MCPD), and distance from the blast point (D). Geomechanical properties of slope-forming rock units were validated through laboratory testing. Slope stability was analyzed using pseudo-static limit equilibrium methods (LEMs) based on the Mohr–Coulomb failure criterion, employing four approaches: Fellenius, Janbu, Bishop, and Spencer. Pearson and Spearman correlation analyses quantified the influence of blasting parameters on slope behavior, and sensitivity analysis determined the cumulative distribution of slope failure and dynamic response under increasing seismic loads. FoS values were calculated for both east and west pit slopes under static and dynamic conditions. Among all methods, Spencer consistently yielded the highest FoS values. Under static conditions, FoS was 1.502 for the east slope and 1.254 for the west. Under dynamic loading, FoS declined to 1.308 and 1.102, reductions of 12.9% and 11.3%, respectively, as calculated using the Spencer method. The east slope exhibited greater stability due to its gentler angle. Correlation analysis revealed that burden had a significant negative impact (r = −0.81) on stability. Sensitivity analysis showed that stability deteriorates notably when PPV exceeds 10.9 mm/s. Although daily blasting did not critically compromise stability, the west slope showed greater vulnerability, underscoring the need for stricter control of blasting energy to mitigate vibration-induced instability and promote long-term operational sustainability. Full article
Show Figures

Graphical abstract

20 pages, 9284 KiB  
Article
Tunnels in Gediminas Hill (Vilnius, Lithuania): Evaluation of a New Tunnel Found in 2019
by Šarūnas Skuodis, Mykolas Daugevičius, Jurgis Medzvieckas, Arnoldas Šneideris, Aidas Jokūbaitis, Justinas Rastenis and Juozas Valivonis
Buildings 2025, 15(14), 2383; https://doi.org/10.3390/buildings15142383 - 8 Jul 2025
Viewed by 262
Abstract
This article provides a concise overview of the existing tunnels located within the historic cultural heritage site of Gediminas Hill in Vilnius, with particular emphasis on the implications of a recently discovered tunnel. This newly identified tunnel is of particular interest due to [...] Read more.
This article provides a concise overview of the existing tunnels located within the historic cultural heritage site of Gediminas Hill in Vilnius, with particular emphasis on the implications of a recently discovered tunnel. This newly identified tunnel is of particular interest due to its location beneath a retaining wall in close proximity to an adjacent structure. Long-term structural monitoring data indicate that the building has experienced displacement away from the retaining wall. Although the precise cause of this movement remains undetermined, the discovery of the tunnel adjacent to the structure has raised concerns regarding its potential role in the observed displacements. To investigate this hypothesis, a previously developed numerical model was employed to simulate the tunnel’s impact. The simulation results suggest that the tunnel’s construction was executed with careful consideration. During the excavation phase, the retaining wall exhibited displacements in a direction opposite to the expected ground pressure, indicating effective utilization of the wall’s gravitational mass. However, historical records indicate that no retaining structures were present in the area during the tunnel’s initial period of existence. Consequently, an additional simulation phase was introduced to model the behavior of the surrounding loose soil in the absence of retaining support. The results from this phase revealed that the deformations of the retaining wall and the adjacent building were elastically interdependent. The simulated deformation patterns closely matched the temporal trends observed in the monitoring data. These findings support the hypothesis that the tunnel’s construction may have contributed to the displacement of the nearby building. Full article
(This article belongs to the Section Construction Management, and Computers & Digitization)
Show Figures

Figure 1

18 pages, 6847 KiB  
Article
Numerical Simulation of Slope Excavation and Stability Under Earthquakes in Cataclastic Loose Rock Mass of Hydropower Station on Lancang River
by Wenjing Liu, Hui Deng and Shuo Tian
Appl. Sci. 2025, 15(13), 7480; https://doi.org/10.3390/app15137480 - 3 Jul 2025
Viewed by 446
Abstract
This study investigates the excavation of the cataclastic loose rock slope at the mixing plant on the right bank of the BDa Hydropower Station, which is situated in the upper reaches of Lancang River. The dominant structural plane of the cataclastic loose rock [...] Read more.
This study investigates the excavation of the cataclastic loose rock slope at the mixing plant on the right bank of the BDa Hydropower Station, which is situated in the upper reaches of Lancang River. The dominant structural plane of the cataclastic loose rock mass was obtained using unmanned aerial vehicle tilt photography and 3D point cloud technology. The actual 3D numerical model of the study area was developed using the 3DEC discrete element numerical simulation software. The excavation response characteristics and overall stability of the cataclastic loose rock slope were analyzed. The support effect was evaluated considering the preliminary shaft micropile and Macintosh reinforced mat as slope support measures, and the stability was assessed by applying seismic waves. The results showed the main deformation and failure area after slope cleaning excavation at the junction of the cataclastic loose rock mass and Qedl deposits in the shallow surface of the excavation face. Moreover, the maximum total displacement could reach 18.3 cm. Subsequently, the overall displacement of the slope was significantly reduced, and the maximum total displacement decreased to 2.78 cm. The support effect was significant. Under an earthquake load, the slope with support exhibited considerable displacement in the shallow surface of the excavation slope, with collapse deformation primarily occurring through shear failure. Full article
(This article belongs to the Section Civil Engineering)
Show Figures

Figure 1

33 pages, 15773 KiB  
Article
Surface Change and Stability Analysis in Open-Pit Mines Using UAV Photogrammetric Data and Geospatial Analysis
by Abdurahman Yasin Yiğit and Halil İbrahim Şenol
Drones 2025, 9(7), 472; https://doi.org/10.3390/drones9070472 - 2 Jul 2025
Cited by 1 | Viewed by 716
Abstract
Significant morphological transformations resulting from open-pit mining activities always present major problems with site safety and slope stability. This study investigates an active marble quarry in Dinar, Türkiye by combining geospatial analysis and photogrammetry based on unmanned aerial vehicles (UAV). Acquired in 2024 [...] Read more.
Significant morphological transformations resulting from open-pit mining activities always present major problems with site safety and slope stability. This study investigates an active marble quarry in Dinar, Türkiye by combining geospatial analysis and photogrammetry based on unmanned aerial vehicles (UAV). Acquired in 2024 and 2025, high-resolution images were combined with dense point clouds produced by Structure from Motion (SfM) methods. Iterative Closest Point (ICP) registration (RMSE = 2.09 cm) and Multiscale Model-to-Model Cloud Comparison (M3C2) analysis was used to quantify the surface changes. The study found a volumetric increase of 7744.04 m3 in the dump zones accompanied by an excavation loss of 8359.72 m3, so producing a net difference of almost 615.68 m3. Surface risk factors were evaluated holistically using a variety of morphometric criteria. These measures covered surface variation in several respects: their degree of homogeneity, presence of any unevenness or texture, verticality, planarity, and linearity. Surface variation > 0.20, roughness > 0.15, and verticality > 0.25 help one to identify zones of increased instability. Point cloud modeling derived from UAVs and GIS-based spatial analysis were integrated to show that morphological anomalies are spatially correlated with possible failure zones. Full article
Show Figures

Figure 1

26 pages, 6219 KiB  
Article
A Multi-Method Approach to the Stability Evaluation of Excavated Slopes with Weak Interlayers: Insights from Catastrophe Theory and Energy Principles
by Tao Deng, Xin Pang, Jiwei Sun, Chengliang Zhang, Daochun Wan, Shaojun Zhang and Xiaoqiang Zhang
Appl. Sci. 2025, 15(13), 7304; https://doi.org/10.3390/app15137304 - 28 Jun 2025
Viewed by 268
Abstract
As open-pit mining extends to greater depths, slope stability is becoming a critical factor in ensuring safe production. This issue is particularly pronounced in geological settings with weak interlayers, where sudden slope failures are more likely to occur, demanding precise and reliable stability [...] Read more.
As open-pit mining extends to greater depths, slope stability is becoming a critical factor in ensuring safe production. This issue is particularly pronounced in geological settings with weak interlayers, where sudden slope failures are more likely to occur, demanding precise and reliable stability assessment methods. In this study, a typical open-pit slope with weak interlayers was investigated. Acoustic testing and ground-penetrating radar were employed to identify rock mass structural features and delineate loose zones, enabling detailed rock mass zoning and the development of numerical simulation models for stability analysis. The results indicate that (1) the slope exhibits poor overall integrity, dominated by blocky to fragmented structures with well-developed joints and significant weak interlayers, posing a severe threat to stability; (2) in the absence of support, the slope’s dissipated energy, displacement, and plastic zone volume all exceeded the failure threshold (Δ < 0), and the safety factor was only 0.962, indicating a near-failure state; after implementing support measures, the safety factor increased to 1.31, demonstrating a significant improvement in stability; (3) prior to excavation, the energy damage index (ds) in the 1195–1240 m platform zone reached 0.82, which dropped to 0.48 after reinforcement, confirming the effectiveness of support in reducing energy damage and enhancing slope stability; (4) field monitoring data of displacement and anchor rod forces further validated the stabilizing effect of the support system, providing strong assurance for safe mine operation. By integrating cusp catastrophe theory with energy-based analysis, this study establishes a comprehensive evaluation framework for slope stability under complex geological conditions, offering substantial practical value for deep open-pit mining projects. Full article
(This article belongs to the Special Issue Slope Stability and Earth Retaining Structures—2nd Edition)
Show Figures

Figure 1

6 pages, 1798 KiB  
Proceeding Paper
Mineralogical Mapping of Pyroxene and Anorthosite in Dryden Crater Using M3 Hyperspectral Data
by Iskren Ivanov and Lachezar Filchev
Eng. Proc. 2025, 94(1), 3; https://doi.org/10.3390/engproc2025094003 - 19 Jun 2025
Viewed by 304
Abstract
This study investigates the mineral composition of the lunar Dryden Crater using Moon Mineralogy Mapper (M3) data. A RGB false-color composite reveals distinct pyroxene, anorthosite, and possibly spinel distribution patterns. Orthopyroxenes, excavated from deep crustal layers, dominate steep slopes, while plagioclase-rich [...] Read more.
This study investigates the mineral composition of the lunar Dryden Crater using Moon Mineralogy Mapper (M3) data. A RGB false-color composite reveals distinct pyroxene, anorthosite, and possibly spinel distribution patterns. Orthopyroxenes, excavated from deep crustal layers, dominate steep slopes, while plagioclase-rich materials align with magma ocean models of lunar crustal formation. Minor clinopyroxenes indicate impact melt origins. While space weathering and shock metamorphism pose analytical challenges, integrating spectral data with geological context elucidates the crater’s complex history. The resulting mineral distribution map supports targeted exploration during upcoming lunar missions, resource prospecting and resource utilization initiatives within this geologically complex region. Full article
Show Figures

Figure 1

14 pages, 2477 KiB  
Article
Comparative Assessment of Woody Species for Runoff and Soil Erosion Control on Forest Road Slopes in Harvested Sites of the Hyrcanian Forests, Northern Iran
by Pejman Dalir, Ramin Naghdi, Sanaz Jafari and Petros A. Tsioras
Forests 2025, 16(6), 1013; https://doi.org/10.3390/f16061013 - 17 Jun 2025
Viewed by 328
Abstract
Soil erosion and surface runoff on forest road slopes are major environmental concerns, especially in harvested areas, making effective mitigation strategies essential for sustainable forest management. The study compared the effectiveness of three selected woody species on forest road slopes as a possible [...] Read more.
Soil erosion and surface runoff on forest road slopes are major environmental concerns, especially in harvested areas, making effective mitigation strategies essential for sustainable forest management. The study compared the effectiveness of three selected woody species on forest road slopes as a possible mitigating action for runoff and soil erosion in harvested sites. Plots measuring 2 m × 3 m were set up with three species—alder (Alnus glutinosa (L.) Gaertn.), medlar (Mespilus germanica L.) and hawthorn (Crataegus monogyna Jacq.)—on the slopes of forest roads. Within each plot, root abundance, root density, canopy percentage, canopy height, herbaceous cover percentage, and selected soil characteristics were measured and analyzed. Root frequency and Root Area Ratio (the ratio between the area occupied by roots in a unit area of soil) measurements were conducted by excavating 50 × 50 cm soil profiles at a 10-cm distance from the base of each plant in the four cardinal directions. The highest root abundance and RAR values were found in hawthorn, followed by alder and medlar in both cases. The same order of magnitude was evidenced in runoff (255.42 mL m−2 in hawthorn followed by 176.81 mL m−2 in alder and 67.36 mL m−2 in medlar) and the reverse order in terms of soil erosion (8.23 g m−2 in hawthorn compared to 22.5 g m−2 in alder and 50.24 g m−2 in medlar). The results of the study confirm that using plant species with dense and deep roots, especially hawthorn, significantly reduces runoff and erosion, offering a nature-based solution for sustainable forest road management. These results highlight the need for further research under diverse ecological and soil conditions to optimize species selection and improve erosion mitigation strategies. Full article
(This article belongs to the Special Issue New Research Developments on Forest Road Planning and Design)
Show Figures

Figure 1

18 pages, 4797 KiB  
Article
A Practical Quantitative Tool Based on the EXCASS System for the Use of Hoek-Brown’s Disturbance Factor in Slope Excavations
by Gulseren Dagdelenler and Harun Sonmez
Appl. Sci. 2025, 15(12), 6714; https://doi.org/10.3390/app15126714 - 15 Jun 2025
Viewed by 419
Abstract
The disturbance factor (D) in the Hoek–Brown criterion quantifies excavation-induced rock mass disturbance. Although D is conceptually defined as a continuous parameter ranging from 0 to 1, the most recent Hoek–Brown guidelines provide descriptions only for boundary conditions related to slopes [...] Read more.
The disturbance factor (D) in the Hoek–Brown criterion quantifies excavation-induced rock mass disturbance. Although D is conceptually defined as a continuous parameter ranging from 0 to 1, the most recent Hoek–Brown guidelines provide descriptions only for boundary conditions related to slopes and tunnels. In slope excavations, the degree of disturbance is governed not only by the excavation method but also by the thickness of the removed overburden, with its influence becoming particularly significant in deep excavations. In recent years, the concept of a transitional disturbance factor, varying with depth from the excavation surface, has gained increasing attention. To address this need, the EXCASS system, an empirical method for selecting appropriate excavation techniques based on the Geological Strength Index (GSI) and point load strength (Is50) values, was integrated into the transitional disturbance factor framework in this study. EXCASS allows for the selection of stronger or weaker excavation methods, offering flexibility to control the degree of disturbance induced in the rock mass. Moreover, the disturbance factor at the excavation surface was determined by incorporating both the operational excavation power index and the thickness of the removed overburden. This integrated approach enables a more realistic evaluation of excavation-induced damage in slope stability analyses. Full article
(This article belongs to the Section Earth Sciences)
Show Figures

Figure 1

19 pages, 2523 KiB  
Article
Settlement Behavior Analysis of Adjacent Existing Buildings Induced by Foundation Pit Construction in River Basin
by Yanlu Zhao, Mingrui Cao, Zhigang Guo, Lifeng Zhang and Erdi Abi
Buildings 2025, 15(12), 1991; https://doi.org/10.3390/buildings15121991 - 10 Jun 2025
Viewed by 296
Abstract
The Yellow River Basin features a unique geographical environment with challenges like seawater erosion and soft soil. In this context, the construction of foundation pits can significantly impact the settlement of adjacent structures. Grounded in a real-world project, this study employs the finite [...] Read more.
The Yellow River Basin features a unique geographical environment with challenges like seawater erosion and soft soil. In this context, the construction of foundation pits can significantly impact the settlement of adjacent structures. Grounded in a real-world project, this study employs the finite element software Midas GTS to construct a 3D interaction model between foundation pit excavation and nearby buildings. Through this model, we analyze the settlement patterns of adjacent buildings influenced by variables such as foundation soil strength, slope gradient, and construction sequence. By integrating orthogonal experimental design and range analysis, we identify the sensitive factors affecting the settlement deformation and stability of foundation pits. Our analysis reveals that among the factors significantly influencing settlement deformation at the foundation pit base, groundwater levels and internal friction angles are the most critical. Slope gradient and soil cohesion also play substantial roles, whereas the compressive modulus of soil shows relatively less impact. However, a comparison with actual engineering data indicates that groundwater factors considerably affect slope deformation, underscoring the necessity for stringent control of groundwater level fluctuations. Full article
(This article belongs to the Section Building Structures)
Show Figures

Figure 1

18 pages, 4571 KiB  
Article
Study on the Evolution Process of Snow Cover in Wind-Induced Railway Embankments and the Control Effect of Snow Fences
by Shumao Qiu, Mingzhou Bai, Daming Lin, Haoying Xia and Zhenyu Tang
Appl. Sci. 2025, 15(11), 6057; https://doi.org/10.3390/app15116057 - 28 May 2025
Viewed by 317
Abstract
Snowdrift, as a natural disaster, constantly compromises railway traffic by affecting how snow accumulates on the subgrade. This paper establishes a unified set of similarity criteria for wind tunnel testing, using viscous silica sand to simulate snow particles. By employing a geometric scale [...] Read more.
Snowdrift, as a natural disaster, constantly compromises railway traffic by affecting how snow accumulates on the subgrade. This paper establishes a unified set of similarity criteria for wind tunnel testing, using viscous silica sand to simulate snow particles. By employing a geometric scale model (1:30) and similarity criteria (size, motion, dynamics, accumulation patterns, and time scales), it systematically investigates the evolution patterns of wind-induced snow accumulation on two types of roadbed structures: embankments and excavations. This study also evaluates the effectiveness of snow fences, proposing optimized placement distances and quantifying the effects of snow accumulation platform width. The results showed the following: (1) Snow on embankments has a “U”-shaped distribution, with the lowest wind speed (<0.5 m/s) and maximum accumulation at the leeward slope’s foot. In excavations, snow forms an “M”-shaped distribution, with significantly reduced wind speeds (<1 m/s) on the accumulation platform. (2) Snow fences effectively manage snow placement by lowering wind speed (below 1 m/s). A single-row snow fence with a porosity of 50% and a height of 3 m performs best when placed at seven times its height (7 H) from the slope’s toe. (3) A 5 m snow accumulation platform in excavations reduces surface snow accumulation (distribution coefficient drops to 1.6), outperforming scenarios without a platform (coefficient of 2.0). These findings contribute to the prevention and control of snowdrift disasters along railway lines in cold regions. They offer practical guidance for optimizing snow fence configurations, while also laying a foundation for future improvements in experimental accuracy through advanced techniques such as PIV and real-snow testing. Full article
Show Figures

Figure 1

19 pages, 6050 KiB  
Article
Multiphysics Coupling Effects on Slope Deformation in Jiangte Xikeng Lithium Deposit Open-Pit Mining
by Yongming Yin, Zhengxing Yu, Jinglin Wen, Fangzhi Gan and Couxian Shu
Processes 2025, 13(6), 1686; https://doi.org/10.3390/pr13061686 - 27 May 2025
Viewed by 437
Abstract
Geotechnical slope failures—often precursors to catastrophic landslides and collapses—pose significant risks to mining operations and regional socioeconomic stability. Focusing on the Jiangte Xikeng lithium open-pit mine, this study integrates field reconnaissance, laboratory testing, and multi-physics numerical modeling to elucidate the mechanisms governing slope [...] Read more.
Geotechnical slope failures—often precursors to catastrophic landslides and collapses—pose significant risks to mining operations and regional socioeconomic stability. Focusing on the Jiangte Xikeng lithium open-pit mine, this study integrates field reconnaissance, laboratory testing, and multi-physics numerical modeling to elucidate the mechanisms governing slope stability. Geological surveys and core analyses reveal a predominantly granite lithostratigraphy, bisected by two principal fault systems: the NE-striking F01 and the NNE-oriented F02. Advanced three-dimensional finite element simulations—accounting for gravitational loading, hydrogeological processes, dynamic blasting stresses, and extreme rainfall events—demonstrate that strain localizes at slope crests, with maximum displacements reaching 195.7 mm under blasting conditions. They indicate that differentiated slope angles of 42° for intact granite versus 27° for fractured zones are required for optimal stability, and that the integration of fault-controlled instability criteria, a coupled hydro-mechanical-blasting interaction model, and zonal design protocols for heterogeneous rock masses provides both operational guidelines for hazard mitigation and theoretical insights into excavation-induced slope deformations in complex metallogenic environments. Full article
(This article belongs to the Topic Green Mining, 2nd Volume)
Show Figures

Figure 1

22 pages, 6061 KiB  
Article
Back-Silting Characteristics of Foundation Trench Excavation in an Ultra-Wide Inland Immersed Tunnel and Its Impacts on Slope Stability: A Case Study of the Tanzhou Waterway in Shunde
by Qixian Wu, Maojie Tang, Dan Chang, Jiankun Liu and Xingbang Lu
Buildings 2025, 15(11), 1810; https://doi.org/10.3390/buildings15111810 - 25 May 2025
Viewed by 445
Abstract
During the construction of a large immersed tunnel crossing an ultra-wide inland river, the long drying time after the excavation of the foundation trench and changes in river flow velocity result in the river carrying a large amount of sediment into the foundation [...] Read more.
During the construction of a large immersed tunnel crossing an ultra-wide inland river, the long drying time after the excavation of the foundation trench and changes in river flow velocity result in the river carrying a large amount of sediment into the foundation trench and the slope, increasing installation difficulties and threatening construction safety. This study investigates the back-silting characteristics and their impacts on foundation trench slope stability during an ultra-wide immersed tunnel excavation at LunGui Road in Foshan City, China. Numerical simulations reveal the spatiotemporal distribution patterns of deposited sediments at the trench bottom and side slopes, with distinct behaviors identified between the flood season and dry season. Siltation predominantly occurs at the trench bottom, with deposition thickness decreasing almost linearly from the bottom to the slope crest. Hydroperiod variations considerably influence the spatiotemporal distribution of back-silting. Then, the Morgenstern–Price method was employed to analyze slope stability under varying back-silting and dredging conditions, quantifying the relationship between safety factor and sediment thickness. Furthermore, the evolution of critical failure surfaces and the safety factor under different dredging strategies was systematically examined. The critical values of back-silting thickness corresponding to different dredging slope ratios are provided. The research findings provide valuable insights for formulating engineering strategies for trench excavation of extra-wide immersed tube tunnels in inland waterways. Full article
(This article belongs to the Special Issue Design, Construction and Maintenance of Underground Structures)
Show Figures

Figure 1

Back to TopTop