Next Article in Journal
Integrated Bi-Objective Scheduling of an Assembly Job Shop with Synchronous Assembly, Blocking, and Restricted Material Handling Resources
Previous Article in Journal
RIS-Aided Path Loss Model Evaluation in Real-Life Scenarios
 
 
Article

Article Versions Notes

Appl. Sci. 2026, 16(11), 5342; https://doi.org/10.3390/app16115342
Action Date Notes Link
article pdf uploaded. 26 May 2026 15:00 CEST Version of Record https://www.mdpi.com/2076-3417/16/11/5342/pdf
Back to TopTop