A Phase-Based Roadmap for Proliferating BIM within the Construction Sector Using DEMATEL Technique: Perspectives from Egyptian Practitioners
Abstract
:1. Introduction and Theoretical Background
2. Research Methodology
2.1. Defining the KSFs of BIM Implementation
2.1.1. Step 1: Setting a Definition of the KSFs of BIM Implementation
2.1.2. Step 2: Specifying the Utilized Keywords to Search the Databases
2.1.3. Step 3: Identifying the Databases
2.1.4. Step 4: Allocating the Screening Criteria of the Publications
2.1.5. Step 5: Surveying the Databases
2.1.6. Step 6: Validating the Initial List of the KSFs
2.2. DEMATEL Questionnaire-Based Survey
2.3. Implementation of DEMATEL Analysis
2.3.1. Step 1: Establishing the Average Matrix A
2.3.2. Step 2: Generating the Normalized Initial Direct-Relation Matrix N
2.3.3. Step 3: Defining the Total-Relation Matrix T
2.3.4. Step 4: Determining the Prominence and the Net Effect of the KSFs
3. Results and Analysis
- (1)
- Section 3.1. “Depicting the Causal Diagram of the KSFs of BIM Implementation”: this subsection shows how the causal diagram of the KSFs of BIM implementation has been depicted relying upon the outputs of the prior steps of DEMATEL analysis.
- (2)
- Section 3.2. “Analyzing the Causal Diagram of the KSFs of BIM Implementation”: this subsection illustrates the results of the causal diagram of the KSFs of BIM implementation.
3.1. Depicting the Causal Diagram of the KSFs of BIM Implementation
3.2. Analyzing the Causal Diagram of the KSFs of BIM Implementation
4. Discussion and Recommendations
4.1. Phase One of BIM Implementation Roadmap
4.2. Phase Two of BIM Implementation Roadmap
4.3. Phase Three of BIM Implementation Roadmap
4.4. Phase Four of BIM Implementation Roadmap
5. Theoretical and Practical Implications
6. Limitations and Future Directions
7. Conclusions
Author Contributions
Funding
Institutional Review Board Statement
Informed Consent Statement
Data Availability Statement
Conflicts of Interest
Appendix A
Study | Year | Country | Study Scope/Objectives | Key Analyzing Tools |
---|---|---|---|---|
[51] ** | 2011 | Hong Kong |
|
|
[32] ** | 2012 | United Kingdom |
|
|
[11] ** | 2013 | International survey |
|
|
[12] ** | 2014 | Nigeria |
|
|
[8] ** | 2014 | Hong Kong |
|
|
[37] *** | 2014 | Not specified |
|
|
[50] * | 2015 | Malaysia |
|
|
[24] ** | 2015 | Libya |
|
|
[38] * | 2016 | United States |
|
|
[39] *** | 2016 | Malaysia |
|
|
[40] ** | 2017 | United Kingdom |
|
|
[33] ** | 2017 | China |
|
|
[16] * | 2017 | Turkey |
|
|
[13] ** | 2018 | Syria |
|
|
[14] * | 2018 | Nigeria |
|
|
[25] ** | 2018 | Saudi Arabia |
|
|
[41] *** | 2018 | Not specified |
|
|
[26] * | 2018 | Surveying eight countries |
|
|
[42] **** | 2018 | Syria |
|
|
[10] ** | 2019 | Saudi Arabia |
|
|
[15] * | 2019 | Taiwan |
|
|
[27] * | 2019 | Hong Kong |
|
|
[43] **** | 2019 | Singapore |
|
|
[28] ** | 2019 | Singapore |
|
|
[18] * | 2019 | China |
|
|
[44] * | 2019 | Developing countries |
|
|
[17] * | 2020 | Malaysia |
|
|
[45] **** | 2019 | China |
|
|
[46] ** | 2019 | China |
|
|
[23] *** | 2020 | Not specified |
|
|
[52] **** | 2020 | Egypt |
|
|
[30] * | 2020 | United Kingdom |
|
|
[29] ** | 2020 | Nigeria |
|
|
[47] **** | 2020 | Pakistan |
|
|
[34] ** | 2020 | Nigeria |
|
|
[3] * | 2020 | China |
|
|
[48] * | 2020 | Malaysia |
|
|
[53] **** | 2020 | Lagos State- Nigeria |
|
|
[1] * | 2020 | Surveying Asian and European countries |
|
|
[19] * | 2020 | China |
|
|
[35] ** | 2020 | Australia |
|
|
[49] ** | 2020 | United Kingdom |
|
|
[36] * | 2020 | China |
|
|
[31] ** | 2021 | Nigeria |
|
|
KSF | KSF1 | KSF2 | KSF3 | KSF4 | KSF5 | KSF6 | KSF7 | KSF8 | KSF9 | KSF10 | KSF11 | KSF12 | KSF13 | KSF14 | KSF15 | KSF16 | KSF17 | KSF18 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
KSF1 | 0 | 3.3 | 3 | 3.2 | 3.2 | 2.6 | 2.4 | 2.7 | 2.7 | 3.2 | 3 | 2.1 | 3.5 | 2.7 | 2 | 3 | 2.6 | 2.5 |
KSF2 | 2.8 | 0 | 2.4 | 2 | 3.1 | 2.4 | 2.7 | 2.5 | 2.1 | 3 | 3.1 | 2.5 | 2.3 | 2.1 | 1.3 | 1.7 | 2.5 | 2.9 |
KSF3 | 2.5 | 2.2 | 0 | 2.8 | 2.9 | 3.3 | 2.8 | 3 | 3.2 | 3 | 2.4 | 2.1 | 2.7 | 2.5 | 2.4 | 2.2 | 2.9 | 2.8 |
KSF4 | 2.6 | 2.3 | 3.1 | 0 | 2.9 | 3.5 | 3.1 | 3.1 | 2.2 | 3.2 | 3 | 1.9 | 2.6 | 2.6 | 2.3 | 2.8 | 3.1 | 2.4 |
KSF5 | 3.1 | 2.8 | 3.6 | 3.5 | 0 | 2.7 | 3.1 | 3.2 | 2.6 | 2.8 | 2.9 | 2.6 | 3.2 | 2.3 | 1.7 | 2.8 | 2.8 | 2.8 |
KSF6 | 2.2 | 2.3 | 2.6 | 2.8 | 2.4 | 0 | 3.3 | 2.9 | 2.6 | 2.9 | 1.8 | 2.1 | 2 | 2.9 | 1.9 | 2.5 | 3.2 | 2.4 |
KSF7 | 2.7 | 2.2 | 2.7 | 3.1 | 2.8 | 2.9 | 0 | 3.2 | 2.4 | 2.8 | 2.5 | 2.2 | 2.8 | 2.9 | 1.9 | 2.4 | 2.8 | 2.5 |
KSF8 | 2.6 | 2.5 | 2.6 | 3.1 | 2.9 | 3 | 3.5 | 0 | 2.3 | 2.8 | 2.8 | 2.1 | 2.9 | 2.8 | 1.8 | 2.8 | 2.6 | 2.7 |
KSF9 | 2.4 | 2.3 | 2.8 | 2.7 | 3 | 3 | 2.9 | 2.9 | 0 | 2.8 | 3.1 | 2.6 | 2.7 | 2.4 | 2.9 | 2.5 | 3.1 | 2.7 |
KSF10 | 3 | 2.9 | 3 | 2.9 | 2.9 | 2.4 | 3.2 | 2.8 | 2.8 | 0 | 2.6 | 2.5 | 3.1 | 2.9 | 2.4 | 2.2 | 3.1 | 2.4 |
KSF11 | 3 | 3.1 | 2.8 | 2.4 | 2.5 | 2.5 | 2.5 | 3.2 | 2.9 | 3.1 | 0 | 2.5 | 3.2 | 2.8 | 1.6 | 2.5 | 2.4 | 2.3 |
KSF12 | 2.7 | 3 | 2.4 | 2.2 | 2.6 | 2.1 | 2.7 | 2.9 | 2.2 | 2.3 | 2.3 | 0 | 3.1 | 2.6 | 2.9 | 2.5 | 2.7 | 2.3 |
KSF13 | 3.3 | 3.1 | 2.6 | 3.1 | 3.3 | 2.6 | 2.7 | 2.8 | 3 | 3 | 3.4 | 2.3 | 0 | 2.4 | 2.1 | 3.4 | 3 | 2.5 |
KSF14 | 2.3 | 1.7 | 2.7 | 2.9 | 2.5 | 2.8 | 2.8 | 3.3 | 3 | 3 | 2.7 | 2.9 | 2.8 | 0 | 2.8 | 2.4 | 2.9 | 2.7 |
KSF15 | 1.8 | 2.5 | 2.5 | 2.2 | 2 | 2.3 | 2.5 | 2.2 | 2.2 | 2.5 | 2 | 2.5 | 2.5 | 3 | 0 | 2.1 | 2.8 | 2.5 |
KSF16 | 2.4 | 2.1 | 2.6 | 2.9 | 2.8 | 3.1 | 3.1 | 3.4 | 2.5 | 2.6 | 2.9 | 2.5 | 2.8 | 2.8 | 1.9 | 0 | 3.2 | 2.9 |
KSF17 | 2.9 | 2.6 | 3.1 | 3 | 2.7 | 2.9 | 3.2 | 3.2 | 2.8 | 3.1 | 2.9 | 2.8 | 2.7 | 2.8 | 2.1 | 2.5 | 0 | 3.2 |
KSF18 | 2.1 | 2.7 | 3.2 | 2.5 | 2.6 | 2.4 | 3.5 | 3.5 | 2.9 | 3.1 | 2.6 | 2.4 | 2.4 | 2.6 | 2.5 | 2.6 | 3.3 | 0 |
KSF | KSF1 | KSF2 | KSF3 | KSF4 | KSF5 | KSF6 | KSF7 | KSF8 | KSF9 | KSF10 | KSF11 | KSF12 | KSF13 | KSF14 | KSF15 | KSF16 | KSF17 | KSF18 |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
KSF1 | 0 | 0.065 | 0.059 | 0.063 | 0.063 | 0.051 | 0.047 | 0.053 | 0.053 | 0.063 | 0.059 | 0.041 | 0.069 | 0.053 | 0.039 | 0.059 | 0.051 | 0.049 |
KSF2 | 0.055 | 0 | 0.047 | 0.039 | 0.061 | 0.047 | 0.053 | 0.049 | 0.041 | 0.059 | 0.061 | 0.049 | 0.045 | 0.041 | 0.026 | 0.033 | 0.049 | 0.057 |
KSF3 | 0.049 | 0.043 | 0 | 0.055 | 0.057 | 0.065 | 0.055 | 0.059 | 0.063 | 0.059 | 0.047 | 0.041 | 0.053 | 0.049 | 0.047 | 0.043 | 0.057 | 0.055 |
KSF4 | 0.051 | 0.045 | 0.061 | 0 | 0.057 | 0.069 | 0.061 | 0.061 | 0.043 | 0.063 | 0.059 | 0.037 | 0.051 | 0.051 | 0.045 | 0.055 | 0.061 | 0.047 |
KSF5 | 0.061 | 0.055 | 0.071 | 0.069 | 0 | 0.053 | 0.061 | 0.063 | 0.051 | 0.055 | 0.057 | 0.051 | 0.063 | 0.045 | 0.033 | 0.055 | 0.055 | 0.055 |
KSF6 | 0.043 | 0.045 | 0.051 | 0.055 | 0.047 | 0 | 0.065 | 0.057 | 0.051 | 0.057 | 0.035 | 0.041 | 0.039 | 0.057 | 0.037 | 0.049 | 0.063 | 0.047 |
KSF7 | 0.053 | 0.043 | 0.053 | 0.061 | 0.055 | 0.057 | 0 | 0.063 | 0.047 | 0.055 | 0.049 | 0.043 | 0.055 | 0.057 | 0.037 | 0.047 | 0.055 | 0.049 |
KSF8 | 0.051 | 0.049 | 0.051 | 0.061 | 0.057 | 0.059 | 0.069 | 0 | 0.045 | 0.055 | 0.055 | 0.041 | 0.057 | 0.055 | 0.035 | 0.055 | 0.051 | 0.053 |
KSF9 | 0.047 | 0.045 | 0.055 | 0.053 | 0.059 | 0.059 | 0.057 | 0.057 | 0 | 0.055 | 0.061 | 0.051 | 0.053 | 0.047 | 0.057 | 0.049 | 0.061 | 0.053 |
KSF10 | 0.059 | 0.057 | 0.059 | 0.057 | 0.057 | 0.047 | 0.063 | 0.055 | 0.055 | 0 | 0.051 | 0.049 | 0.061 | 0.057 | 0.047 | 0.043 | 0.061 | 0.047 |
KSF11 | 0.059 | 0.061 | 0.055 | 0.047 | 0.049 | 0.049 | 0.049 | 0.063 | 0.057 | 0.061 | 0 | 0.049 | 0.063 | 0.055 | 0.031 | 0.049 | 0.047 | 0.045 |
KSF12 | 0.053 | 0.059 | 0.047 | 0.043 | 0.051 | 0.041 | 0.053 | 0.057 | 0.043 | 0.045 | 0.045 | 0 | 0.061 | 0.051 | 0.057 | 0.049 | 0.053 | 0.045 |
KSF13 | 0.065 | 0.061 | 0.051 | 0.061 | 0.065 | 0.051 | 0.053 | 0.055 | 0.059 | 0.059 | 0.067 | 0.045 | 0 | 0.047 | 0.041 | 0.067 | 0.059 | 0.049 |
KSF14 | 0.045 | 0.033 | 0.053 | 0.057 | 0.049 | 0.055 | 0.055 | 0.065 | 0.059 | 0.059 | 0.053 | 0.057 | 0.055 | 0 | 0.055 | 0.047 | 0.057 | 0.053 |
KSF15 | 0.035 | 0.049 | 0.049 | 0.043 | 0.039 | 0.045 | 0.049 | 0.043 | 0.043 | 0.049 | 0.039 | 0.049 | 0.049 | 0.059 | 0 | 0.041 | 0.055 | 0.049 |
KSF16 | 0.047 | 0.041 | 0.051 | 0.057 | 0.055 | 0.061 | 0.061 | 0.067 | 0.049 | 0.051 | 0.057 | 0.049 | 0.055 | 0.055 | 0.037 | 0 | 0.063 | 0.057 |
KSF17 | 0.057 | 0.051 | 0.061 | 0.059 | 0.053 | 0.057 | 0.063 | 0.063 | 0.055 | 0.061 | 0.057 | 0.055 | 0.053 | 0.055 | 0.041 | 0.049 | 0 | 0.063 |
KSF18 | 0.041 | 0.053 | 0.063 | 0.049 | 0.051 | 0.047 | 0.069 | 0.069 | 0.057 | 0.061 | 0.051 | 0.047 | 0.047 | 0.051 | 0.049 | 0.051 | 0.065 | 0 |
KSF | KSF1 | KSF2 | KSF3 | KSF4 | KSF5 | KSF6 | KSF7 | KSF8 | KSF9 | KSF10 | KSF11 | KSF12 | KSF13 | KSF14 | KSF15 | KSF16 | KSF17 | KSF18 | # |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
KSF1 | 0.47 | 0.52 | 0.558 | 0.559 | 0.556 | 0.539 | 0.57 | 0.583 | 0.519 | 0.576 | 0.541 | 0.468 | 0.562 | 0.525 | 0.424 | 0.51 | 0.562 | 0.516 | 8 |
KSF2 | 0.464 | 0.402 | 0.484 | 0.475 | 0.492 | 0.474 | 0.51 | 0.513 | 0.45 | 0.508 | 0.482 | 0.421 | 0.478 | 0.454 | 0.363 | 0.429 | 0.496 | 0.464 | 0 |
KSF3 | 0.497 | 0.482 | 0.481 | 0.531 | 0.53 | 0.532 | 0.556 | 0.567 | 0.509 | 0.551 | 0.51 | 0.451 | 0.527 | 0.502 | 0.416 | 0.477 | 0.547 | 0.502 | 2 |
KSF4 | 0.509 | 0.493 | 0.549 | 0.489 | 0.539 | 0.545 | 0.572 | 0.579 | 0.5 | 0.565 | 0.53 | 0.455 | 0.535 | 0.513 | 0.421 | 0.496 | 0.56 | 0.504 | 4 |
KSF5 | 0.535 | 0.519 | 0.576 | 0.572 | 0.505 | 0.549 | 0.591 | 0.601 | 0.525 | 0.577 | 0.547 | 0.484 | 0.564 | 0.525 | 0.425 | 0.514 | 0.574 | 0.529 | 7 |
KSF6 | 0.465 | 0.457 | 0.501 | 0.503 | 0.492 | 0.443 | 0.535 | 0.534 | 0.471 | 0.52 | 0.471 | 0.426 | 0.486 | 0.482 | 0.385 | 0.456 | 0.522 | 0.468 | 0 |
KSF7 | 0.493 | 0.474 | 0.523 | 0.529 | 0.52 | 0.517 | 0.495 | 0.561 | 0.487 | 0.539 | 0.504 | 0.445 | 0.521 | 0.501 | 0.4 | 0.473 | 0.536 | 0.489 | 1 |
KSF8 | 0.501 | 0.488 | 0.531 | 0.538 | 0.531 | 0.528 | 0.57 | 0.513 | 0.494 | 0.549 | 0.519 | 0.452 | 0.532 | 0.509 | 0.406 | 0.489 | 0.543 | 0.501 | 1 |
KSF9 | 0.505 | 0.493 | 0.544 | 0.54 | 0.541 | 0.536 | 0.568 | 0.576 | 0.459 | 0.558 | 0.532 | 0.468 | 0.537 | 0.51 | 0.433 | 0.491 | 0.56 | 0.51 | 4 |
KSF10 | 0.52 | 0.507 | 0.551 | 0.547 | 0.544 | 0.529 | 0.577 | 0.578 | 0.515 | 0.51 | 0.527 | 0.47 | 0.548 | 0.522 | 0.427 | 0.489 | 0.564 | 0.508 | 3 |
KSF11 | 0.503 | 0.495 | 0.53 | 0.521 | 0.52 | 0.514 | 0.547 | 0.566 | 0.5 | 0.549 | 0.462 | 0.455 | 0.532 | 0.504 | 0.398 | 0.479 | 0.534 | 0.49 | 1 |
KSF12 | 0.479 | 0.475 | 0.503 | 0.497 | 0.502 | 0.487 | 0.53 | 0.54 | 0.469 | 0.515 | 0.486 | 0.391 | 0.511 | 0.482 | 0.407 | 0.461 | 0.519 | 0.471 | 0 |
KSF13 | 0.54 | 0.525 | 0.56 | 0.566 | 0.566 | 0.548 | 0.585 | 0.595 | 0.533 | 0.582 | 0.557 | 0.479 | 0.506 | 0.528 | 0.433 | 0.525 | 0.578 | 0.524 | 8 |
KSF14 | 0.498 | 0.477 | 0.536 | 0.538 | 0.527 | 0.527 | 0.561 | 0.577 | 0.51 | 0.556 | 0.52 | 0.469 | 0.533 | 0.46 | 0.427 | 0.485 | 0.551 | 0.504 | 3 |
KSF15 | 0.431 | 0.434 | 0.471 | 0.463 | 0.457 | 0.458 | 0.49 | 0.492 | 0.438 | 0.483 | 0.447 | 0.409 | 0.466 | 0.457 | 0.327 | 0.423 | 0.486 | 0.443 | 0 |
KSF16 | 0.504 | 0.488 | 0.538 | 0.542 | 0.536 | 0.537 | 0.57 | 0.583 | 0.504 | 0.553 | 0.527 | 0.465 | 0.537 | 0.515 | 0.413 | 0.443 | 0.56 | 0.512 | 3 |
KSF17 | 0.531 | 0.515 | 0.567 | 0.562 | 0.554 | 0.552 | 0.592 | 0.6 | 0.528 | 0.582 | 0.546 | 0.487 | 0.555 | 0.534 | 0.432 | 0.507 | 0.521 | 0.535 | 5 |
KSF18 | 0.501 | 0.501 | 0.552 | 0.537 | 0.536 | 0.527 | 0.58 | 0.588 | 0.514 | 0.565 | 0.525 | 0.466 | 0.533 | 0.515 | 0.426 | 0.494 | 0.565 | 0.46 | 4 |
Total no. of the significant cause-effect relations | 54 |
References
- Phang, T.; Chen, C.; Tiong, R. New model for identifying critical success factors influencing BIM adoption from precast concrete manufacturers’ view. J. Constr. Eng. Manag. 2020, 146, 04020014. [Google Scholar] [CrossRef]
- Arshad, M.; Thaheem, M.; Nasir, A.; Malik, M. Contractual risks of Building Information Modeling: Toward a standardized legal framework for design-bid-build projects. J. Constr. Eng. Manag. 2019, 145, 04019010. [Google Scholar] [CrossRef]
- Ma, X.; Chan, A.; Li, Y.; Zhang, B.; Xiong, F. Critical strategies for enhancing BIM implementation in AEC projects: Perspectives from Chinese practitioners. J. Constr. Eng. Manag. 2020, 146, 05019019. [Google Scholar] [CrossRef]
- Eastman, C.; Teicholz, P.; Sacks, R.; Liston, K. BIM Handbook: A Guide to Building Information Modeling for Owners, Managers, Designers, Engineers and Contractors; John Wiley and Sons: Hoboken, NJ, USA, 2008. [Google Scholar]
- Chien, K.; Wu, Z.; Huang, S. Identifying and assessing critical risk factors for BIM projects: Empirical study. Autom. Constr. 2014, 45, 1–15. [Google Scholar] [CrossRef]
- Mihindu, S.; Arayici, Y. Digital Construction through BIM Systems will Drive the Re-Engineering of Construction Business Practices. In Proceedings of the 12th International Conference Information Visualisation, London, UK, 9–11 July 2008. [Google Scholar]
- Azhar, S. Building Information Modeling (BIM): Trends, benefits, risks, and challenges for the AEC industry. Leader. Manag. Eng. 2011, 11, 241–252. [Google Scholar] [CrossRef]
- CIC (Construction Industry Council). Roadmap for Building Information Modelling Strategic in Hong Kong’s Construction Industry; Construction Industry Council: Hong Kong, China, 2014. [Google Scholar]
- Seyis, S. Pros and cons of using Building Information Modeling in the AEC industry. J. Constr. Eng. Manag. 2019, 145, 04019046. [Google Scholar] [CrossRef]
- Aljobaly, O.; Banawi, A. Evaluation of the Saudi Construction Industry for Adoption of Building Information Modelling. In Proceedings of the International Conference on Applied Human Factors and Ergonomics, Washington, DC, USA, 16–20 July 2019. [Google Scholar]
- Won, J.; Lee, J.; Dossick, C.; Messner, J. Where to focus for successful adoption of Building Information Modeling within organization. J. Constr. Eng. Manag. 2013, 139, 04013014. [Google Scholar] [CrossRef] [Green Version]
- Abubakar, M.; Ibrahim, Y.; Bala, K. Contractors’ Perception of the Factors Affecting Building Information Modelling (BIM) Adoption in the Nigerian Construction Industry. In Proceedings of the International Conference on Computing in Civil and Building Engineering, Orlando, FL, USA, 23–25 June 2014. [Google Scholar]
- Ahmed, S.; Dlask, P.; Selim, O.; Elhendawi, A. BIM performance improvement framework for Syrian AEC companies. Int. J. BIM Eng. Sci. 2018, 1, 21–41. [Google Scholar] [CrossRef]
- Amuda-Yusuf, G. Critical success factors for Building Information Modelling implementation. Constr. Econ. Build. 2018, 18, 55–74. [Google Scholar] [CrossRef]
- Badrinath, A.; Hsieh, S. Empirical approach to identify operational critical success factors for BIM projects. J. Constr. Eng. Manag. 2019, 145, 04018140. [Google Scholar] [CrossRef]
- Ozorhon, B.; Karahan, U. Critical success factors of Building Information Modeling implementation. J. Manag. Eng. 2017, 33, 04016054. [Google Scholar] [CrossRef]
- Sinoh, S.; Othman, F.; Ibrahim, Z. Critical success factors for BIM implementation: A Malaysian case study. Eng. Constr. Archit. Manag. 2020, 27, 2737–2765. [Google Scholar] [CrossRef]
- Ma, G.; Jia, J.; Ding, J.; Shang, S.; Jiang, S. Interpretive structural model based Factor Analysis of BIM adoption in Chinese construction organizations. Sustainability 2019, 11, 1982. [Google Scholar] [CrossRef] [Green Version]
- Qin, X.; Shi, Y.; Lyu, K.; Mo, Y. Using a TAM-TOE model to explore factors of Building Information Modeling (BIM) adoption in the construction industry. J. Civ. Eng. Manag. 2020, 26, 259–277. [Google Scholar] [CrossRef]
- Costa, F.; Granja, A.; Fregola, A.; Picchi, F.; Staudacher, A. Understanding relative importance of barriers to improving the customer–supplier relationship within construction supply chains using DEMATEL technique. J. Manag. Eng. 2019, 35, 04019002. [Google Scholar] [CrossRef]
- Liao, L.; Teo, E. Critical success factors for enhancing the Building Information Modeling implementation in building projects in Singapore. J. Civ. Eng. Manag. 2017, 23, 1029–1044. [Google Scholar] [CrossRef] [Green Version]
- Enshassi, M.; Al Hallaq, K.; Tayeh, B. Critical success factors for implementing building information modeling (BIM) in construction industry. Civ. Eng. Res. J. 2019, 8, 79–85. [Google Scholar]
- Abbasnejad, B.; Nepal, M.; Ahankoob, A.; Nasirian, A.; Drogemuller, R. Building Information Modelling (BIM) adoption and implementation enablers in AEC firms: A systematic literature review. Archit. Eng. Des. Manag. 2020, 17, 411–433. [Google Scholar] [CrossRef]
- Saleh, M. Barriers and Driving Factors for Implementing Building Information Modelling (BIM) in Libya. Master’s Thesis, Eastern Mediterranean University, Gazimağusa, North Cyprus, 2015. [Google Scholar]
- Elhendawi, A. Methodology for BIM Implementation in KSA in AEC Industry. Master’s Thesis, Edinburgh Napier University, Edinbourgh, UK, 2018. [Google Scholar]
- Olawumi, T.; Chan, D. Critical success factors for implementing Building Information Modeling and sustainability practices in construction projects: A Delphi survey. Sustain. Develop. 2018, 27, 587–602. [Google Scholar] [CrossRef]
- Chan, D.; Olawumi, T.; Ho, A. Critical success factors for Building Information Modelling (BIM) implementation in Hong Kong. Eng. Constr. Archit. Manag. 2019, 26, 1838–1854. [Google Scholar] [CrossRef]
- Liao, L.; Teo, E.; Chang, R. Reducing critical hindrances to Building Information Modeling implementation: The case of the Singapore construction industry. Appl. Sci. 2019, 9, 3833. [Google Scholar] [CrossRef]
- Aka, A.; Iji, J.; Isa, R.; Bamgbade, A. Assessing the relationships between underlying strategies for effective Building Information Modeling (BIM) implementation in Nigeria construction industry. Archit. Eng. Des. Manag. 2020, 17, 434–446. [Google Scholar] [CrossRef]
- Abu Awwad, K.; Shibani, A.; Ghostin, M. Exploring the critical success factors influencing BIM level 2 implementation in the UK construction industry: The case of SMEs. Int. J. Constr. Manag. 2020, 22, 1894–1901. [Google Scholar] [CrossRef]
- Babatunde, S.; Udeaja, C.; Adekunle, A. Barriers to BIM implementation and ways forward to improve its adoption in the Nigerian AEC firms. Int. J. Build. Pathol. Adapt. 2021, 39, 48–71. [Google Scholar] [CrossRef] [Green Version]
- Khosrowshahi, F.; Arayici, Y. Roadmap for implementation of BIM in the UK construction industry. Eng. Constr. Archit. Manag. 2012, 19, 610–635. [Google Scholar] [CrossRef] [Green Version]
- Jin, R.; Hancock, C.; Tang, L.; Wanatowski, D. BIM investment, returns, and risks in China’s AEC industries. J. Constr. Eng. Manag. 2017, 143, 04017089. [Google Scholar] [CrossRef]
- Hamma-adama, M.; Kouider, T.; Salman, H. Analysis of barriers and drivers for BIM adoption. Int. J. BIM Eng. Sci. 2020, 3, 18–41. [Google Scholar] [CrossRef]
- Stride, M.; Hon, C.; Liu, R.; Xia, B. The use of Building Information Modelling by quantity surveyors in facilities management Roles. Eng. Constr. Archit. Manag. 2020, 27, 1795–1812. [Google Scholar] [CrossRef]
- Zhang, R.; Tang, Y.; Wang, L.; Wang, Z. Factors influencing BIM adoption for construction enterprises in China. Adv. Civ. Eng. 2020, 2020, 8848965. [Google Scholar] [CrossRef]
- Shang, Z.; Shen, Z. Critical Success Factors (CSFs) of BIM Implementation for Collaboration based on System Analysis. In Proceedings of the International Conference on Computing in Civil and Building Engineering, Orlando, FL, USA, 23–25 June 2014. [Google Scholar]
- Haliburton, J. Building Information Modeling and Small Architectural Practice: An Analysis of Factors Affecting BIM Adoption. Ph.D. Thesis, Texas A&M University, College Station, TX, USA, 2016. [Google Scholar]
- Yaakob, M.; Ali, W.; Radzuan, K. Critical success factors to implementing Building Information Modeling in Malaysia construction industry. Int. Rev. Manag. Market. 2016, 6, 252–256. [Google Scholar]
- Habib, S. Critical Success and Contractual Risks for Private Finance 2 (PF2) Projects Implementing Building Information Modeling (BIM). Ph.D. Thesis, University of Salford, Salford, UK, 2017. [Google Scholar]
- Misron, S.; Abdullah, M. Critical success factors of information modeling implementation in facilities management—An overview. Int. J. Real Estate Stud. 2018, 12, 21–32. [Google Scholar]
- Shaban, M.; Elhendawi, A. Building Information Modeling in Syria: Obstacles and requirements for implementation. Int. J. BIM Eng. Sci. 2018, 1, 42–64. [Google Scholar] [CrossRef]
- Liao, L.; Teo, E. Managing critical drivers for Building Information Modelling implementation in the Singapore construction industry: An organizational change perspective. Int. J. Constr. Manag. 2019, 19, 240–256. [Google Scholar] [CrossRef]
- Olawumi, T.; Chan, D. Development of a benchmarking model for BIM implementation in developing countries. Bench. Int. J. 2019, 26, 1210–1232. [Google Scholar] [CrossRef]
- Tan, T.; Chen, K.; Xue, F.; Lu, W. Barriers to Building Information Modeling (BIM) implementation in China’s prefabricated construction: An Interpretive Structural Modeling (ISM) approach. J. Clean. Product. 2019, 219, 949–959. [Google Scholar] [CrossRef]
- Zhou, Y.; Yang, Y.; Yang, J. Barriers to BIM implementation strategies in China. Eng. Constr. Archit. Manag. 2019, 26, 554–574. [Google Scholar] [CrossRef]
- Farooq, U.; Rehman, S.; Javed, M.; Jameel, M.; Aslam, F.; Alyousef, R. Investigating BIM implementation barriers and issues in Pakistan using ISM approach. Appl. Sci. 2020, 10, 7250. [Google Scholar] [CrossRef]
- Muthusamy, K.; Chew, L. Critical Success Factors for the Implementation of Building Information Modeling (BIM) among Construction Industry Development Board (CIDB) G7 Contractors in the Klang Valley, Malaysia. In Proceedings of the IEEE European Technology and Engineering Management Summit (E-TEMS), Dortmund, Germany, 5–7 March 2020. [Google Scholar]
- Vidalakis, C.; Abanda, F.; Oti, A. BIM adoption and implementation: Focusing on SMEs. Constr. Innovat. 2020, 20, 128–147. [Google Scholar] [CrossRef]
- Hadzaman, N.; Takim, R.; Nawawi, A. BIM Roadmap Strategic Implementation Plan: Lesson Learnt from Australia, Singapore and Hong Kong. In Proceedings of the 31stAnnual ARCOM Conference, Lincoln, UK, 7–9 September 2015. [Google Scholar]
- Wong, A.; Wong, F.; Nadeem, A. Government roles in implementing Building Information Modelling systems comparison between Hong Kong and the United States. Constr. Innovat. 2011, 11, 61–76. [Google Scholar] [CrossRef]
- Abdallah, M.; Ahmed, A.; Abdalla, S. Towards a strategic roadmap for a successful BIM implementation in the Egyptian community. J. Eng. Appl. Sci. 2020, 67, 333–352. [Google Scholar]
- Olanrewaju, O.; Chileshe, N.; Babarinde, S.; Sandanayake, M. Investigating the barriers to Building Information Modeling (BIM) implementation within the Nigerian construction industry. Eng. Constr. Archit. Manag. 2020, 27, 2931–2958. [Google Scholar] [CrossRef]
- Umar, T. Challenges of BIM implementation in GCC construction industry. Eng. Constr. Archit. Manag. 2022, 29, 1139–1168. [Google Scholar] [CrossRef]
- Saka, A.; Chan, D. A Scientometric review and Metasynthesis of Building Information Modelling (BIM) research in Africa. Buildings 2019, 9, 85. [Google Scholar] [CrossRef] [Green Version]
- Kim, S.; Nguyen, M. Mapping the complexity of international development projects using DEMATEL technique. J. Manag. Eng. 2021, 37, 05020016. [Google Scholar] [CrossRef]
- Amin, K.; Abanda, F. Building Information Modelling plan of work for managing construction projects in Egypt. J. Constr. Develop. Ctries 2019, 24, 23–61. [Google Scholar] [CrossRef]
- Hiete, M.; Kuhlen, A.; Schultmann, F. Analysing the interdependencies between the criteria of sustainable building rating systems. Constr. Manag. Econ. 2011, 29, 323–328. [Google Scholar] [CrossRef]
- Cong, X.; Wang, L.; Ma, L.; Skibnewski, M. Exploring critical influencing factors for the site selection failure of waste-to-energy projects in China caused by the “not in my back yard” effect. Eng. Constr. Archit. Manag. 2021, 28, 1561–1592. [Google Scholar] [CrossRef]
- Umar, T. Keyfactorsinfluencingtheimplementationofthree-dimensionalprintinginconstruction. Proc. Instit. Civil Eng. Manag. Procur. Law 2021, 174, 104–117. [Google Scholar]
Code | Key Success Factor | Explanation | Supporting Literature |
---|---|---|---|
KSF1 | Firm’s fiscal support | Construction firm’s willingness to assign adequate financing for implementing BIM, including startup and continuous investments | [3,11,13,15,18,24,25,26,27,28,29] |
KSF2 | Adequate and suitable ICT infrastructure | Provision of efficient information and communication technology infrastructure within the firm implementing BIM | [3,10,13,15,16,27,29,30,31] |
KSF3 | Professional BIM staff | Existence of/hiring professional staff with sufficient knowledge of BIM implementation | [1,11,12,13,15,16,27,31,32,33,34,35,36] |
KSF4 | BIM training courses | Equipping the junior and senior BIM cross-field specialists with the necessary BIM training courses | [1,3,10,11,13,14,16,17,18,23,24,25,26,27,28,30,31,32,33,35,36,37,38,39,40,41,42,43,44,45,46,47,48,49] |
KSF5 | Senior management support | The firm’s senior management approach supportive for adopting BIM policy and facilitating its implementation | [1,11,14,15,16,18,19,23,24,25,26,30,41,43,48] |
KSF6 | Staff willingness for learning | Willingness and interest of the firm’s/industry’s staff for acquiring and learning BIM knowledge | [14,18,27] |
KSF7 | BIM awareness level | Sufficient awareness of the industry’s stakeholders with the benefits of BIM and its application areas | [8,12,14,16,18,24,25,26,29,30,31,32,34,42,47,50] |
KSF8 | Supporting the culture of changing and updating | The culture’s of the industry stakeholders supportive of the change and the implementation of the up-to-date technology | [12,13,14,16,17,18,24,25,27,34,37,38,47,48] |
KSF9 | Consulting and technical support | Existence of consulting firms with BIM experience as well as BIM software vendors in the local construction market | [1,3,11,14,16,23,25,26,33,44] |
KSF10 | BIM software functionality | Functionality of BIM software, including efficiency and simplicity in the application and interoperability and compatibility of exchanging data | [1,3,8,13,14,15,18,19,26,30,33,37,39,44,48] |
KSF11 | Maintenance and upgrading plan | Setting an executive plan for periodically maintaining and upgrading BIM software and hardware | [27,44] |
KSF12 | Governmental support | Government-led initiatives and supportive strategies for backing BIM implementation within the construction sector | [1,3,8,10,12,13,14,16,19,24,25,26,27,30,34,35,36,40,41,43,46,47,48,51,52,53] |
KSF13 | Research and development investments | Interesting of the government and industry stakeholder on allocating investments for BIM research and development (e.g., development of engineering software and hardware industry) | [10,36,42,44,45,46,50] |
KSF14 | Industry-academia cooperation | Existence of communication platforms among the academics and industry practitioners for sharing knowledge and expertise | [16,24,25,44] |
KSF15 | Standardization | Availability of appropriate guidelines and legislation (e.g., codes, standards, BEP forms) for standardizing the working procedures of BIM within the construction industry | [3,8,10,11,13,14,16,18,19,26,27,28,31,32,35,36,37,39,40,41,45,46,50,52] |
KSF16 | Encouraging and incentivizing culture | Encouraging and incentivizing the employees who are experts or willing to implement BIM in practice | [11,18,23,47] |
KSF17 | BIM education | Integrating BIM approach in the courses of engineering faculties | [8,13,24,25,29,31,42,44,47,52,53] |
KSF18 | Collaboration and communication environment | Existence of a cooperative project environment and effective communication conduits among project parties | [3,11,13,16,18,26,28,30,37,40,41,43] |
Expert | Working Organization | Position | Education Background | Years of Expertise | Comment on the Initial List of the KSFs | |
---|---|---|---|---|---|---|
Construction Field | BIM Field | |||||
A | Higher education institute for engineering + private consulting and engineering services firm | Associate professor + BIM coordinator | Ph.D. in structural engineering | 22 | 6 | The list of the KSFs is valid |
B | University + private consulting and engineering services firm | Demonstrator + BIM specialist | B.Sc. in architectural engineering | 3 | 3 | The list of the KSFs is valid |
C | Private contracting firm | Senior BIM engineer/modeler | B.Sc. in architectural engineering | 5 | 3 | The list of the KSFs is valid |
D | Private design and engineering services office | Junior BIM engineer/modeler | B.Sc. in mechanical engineering | 2 | 2 | The list of the KSFs is valid |
E | Private consulting and engineering services firm | Senior BIM engineer/modeler | B.Sc. in civil engineering | 7 | 4 | The list of the KSFs is valid |
F | Private consulting and engineering services firm | BIM coordinator | B.Sc. in civil engineering | 3 | 3 | The list of the KSFs is valid |
Expert | Working Organization | Position | Education Background | Years of Expertise | |
---|---|---|---|---|---|
Construction Field | BIM Field | ||||
A | Higher education institute for engineering + private consulting and engineering services firm | Associate professor + BIM coordinator | Ph.D. in structural engineering | 22 | 6 |
B | Private consulting and engineering services firm | BIM coordinator | B.Sc. in civil engineering | 4 | 3 |
C | Engineering software design firm | Technical sales specialist in BIM | B.Sc. in civil engineering | 6 | 6 |
D | University + private consulting and engineering services firm | Demonstrator + BIM specialist | B.Sc. in architectural engineering | 3 | 3 |
E | Private designing and manufacturing steel structure firm | Senior BIM engineer/modeler | B.Sc. in civil engineering | 4 | 4 |
F | Private consulting and engineering services firm | Junior BIM engineer/modeler | B.Sc. in civil engineering | 2 | 2 |
G | Higher education institute for engineering + private design and engineering services office | Demonstrator + junior BIM engineer/modeler | B.Sc. in architectural engineering | 2 | 2 |
H | Private contracting firm | Senior BIM engineer/modeler | B.Sc. in civil engineering | 8 | 4 |
I | Private consulting and engineering services firm | BIM coordinator | B.Sc. in mechanical engineering | 9 | 7 |
J | Private contracting firm | Senior BIM engineer/modeler | B.Sc. in architectural engineering | 5 | 3 |
KSF | Ri | Cj | Pi | NEi |
---|---|---|---|---|
KSF1 | 9.558 | 8.946 | 18.504 | 0.612 |
KSF2 | 8.357 | 8.745 | 17.102 | −0.388 |
KSF3 | 9.167 | 9.555 | 18.722 | −0.387 |
KSF4 | 9.355 | 9.508 | 18.863 | −0.154 |
KSF5 | 9.712 | 9.447 | 19.159 | 0.265 |
KSF6 | 8.616 | 9.341 | 17.957 | −0.725 |
KSF7 | 9.008 | 10 | 19.008 | −0.992 |
KSF8 | 9.193 | 10.14 | 19.333 | −0.952 |
KSF9 | 9.362 | 8.926 | 18.288 | 0.436 |
KSF10 | 9.433 | 9.839 | 19.272 | −0.406 |
KSF11 | 9.097 | 9.232 | 18.329 | −0.135 |
KSF12 | 8.725 | 8.16 | 16.885 | 0.565 |
KSF13 | 9.729 | 9.463 | 19.192 | 0.265 |
KSF14 | 9.255 | 9.036 | 18.291 | 0.219 |
KSF15 | 8.074 | 7.362 | 15.436 | 0.712 |
KSF16 | 9.329 | 8.639 | 17.968 | 0.689 |
KSF17 | 9.698 | 9.778 | 19.476 | −0.08 |
KSF18 | 9.384 | 8.929 | 18.313 | 0.456 |
Phase No. | Location of the Phase on the Causal Diagram | KSF of the Phase | Prominence Index (Pi) | Priority of the KSF in its Phase |
---|---|---|---|---|
Phase one | The upper right-hand quarter of the causal diagram | KSF13 | 19.192 | 1st |
KSF5 | 19.159 | 2nd | ||
KSF1 | 18.504 | 3rd | ||
Phase Two | The upper left-hand quarter of the causal diagram | KSF18 | 18.313 | 1st |
KSF14 | 18.291 | 2nd | ||
KSF9 | 18.288 | 3rd | ||
KSF16 | 17.968 | 4th | ||
KSF12 | 16.885 | 5th | ||
KSF15 | 15.436 | 6th | ||
Phase Three | The lower left-hand quarter of the causal diagram | KSF11 | 18.329 | 1st |
KSF6 | 17.957 | 2nd | ||
KSF2 | 17.102 | 3rd | ||
Phase Four | The lower right-hand quarter of the causal diagram | KSF17 | 19.476 | 1st |
KSF8 | 19.333 | 2nd | ||
KSF10 | 19.272 | 3rd | ||
KSF7 | 19.008 | 4th | ||
KSF4 | 18.863 | 5th | ||
KSF3 | 18.722 | 6th |
Publisher’s Note: MDPI stays neutral with regard to jurisdictional claims in published maps and institutional affiliations. |
© 2022 by the authors. Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/).
Share and Cite
Akal, A.Y.; Kineber, A.F.; Mohandes, S.R. A Phase-Based Roadmap for Proliferating BIM within the Construction Sector Using DEMATEL Technique: Perspectives from Egyptian Practitioners. Buildings 2022, 12, 1805. https://doi.org/10.3390/buildings12111805
Akal AY, Kineber AF, Mohandes SR. A Phase-Based Roadmap for Proliferating BIM within the Construction Sector Using DEMATEL Technique: Perspectives from Egyptian Practitioners. Buildings. 2022; 12(11):1805. https://doi.org/10.3390/buildings12111805
Chicago/Turabian StyleAkal, Ahmed Yousry, Ahmed Farouk Kineber, and Saeed Reza Mohandes. 2022. "A Phase-Based Roadmap for Proliferating BIM within the Construction Sector Using DEMATEL Technique: Perspectives from Egyptian Practitioners" Buildings 12, no. 11: 1805. https://doi.org/10.3390/buildings12111805
APA StyleAkal, A. Y., Kineber, A. F., & Mohandes, S. R. (2022). A Phase-Based Roadmap for Proliferating BIM within the Construction Sector Using DEMATEL Technique: Perspectives from Egyptian Practitioners. Buildings, 12(11), 1805. https://doi.org/10.3390/buildings12111805