Shi, Z.; Chen, H.; Yan, F.; Deng, X.; Hao, H.; Zhang, J.; Yin, Q.
An Improved NSGA-II for Three-Stage Distributed Heterogeneous Hybrid Flowshop Scheduling with Flexible Assembly and Discrete Transportation. Symmetry 2025, 17, 1306.
https://doi.org/10.3390/sym17081306
AMA Style
Shi Z, Chen H, Yan F, Deng X, Hao H, Zhang J, Yin Q.
An Improved NSGA-II for Three-Stage Distributed Heterogeneous Hybrid Flowshop Scheduling with Flexible Assembly and Discrete Transportation. Symmetry. 2025; 17(8):1306.
https://doi.org/10.3390/sym17081306
Chicago/Turabian Style
Shi, Zhiyuan, Haojie Chen, Fuqian Yan, Xutao Deng, Haiqiang Hao, Jialei Zhang, and Qingwen Yin.
2025. "An Improved NSGA-II for Three-Stage Distributed Heterogeneous Hybrid Flowshop Scheduling with Flexible Assembly and Discrete Transportation" Symmetry 17, no. 8: 1306.
https://doi.org/10.3390/sym17081306
APA Style
Shi, Z., Chen, H., Yan, F., Deng, X., Hao, H., Zhang, J., & Yin, Q.
(2025). An Improved NSGA-II for Three-Stage Distributed Heterogeneous Hybrid Flowshop Scheduling with Flexible Assembly and Discrete Transportation. Symmetry, 17(8), 1306.
https://doi.org/10.3390/sym17081306