Ninpan, K.; Huang, S.; Vitillo, F.; Assaad, M.A.; Benmiloud Bechet, L.; Plana, R.
Mitigating Co-Activity Conflicts and Resource Overallocation in Construction Projects: A Modular Heuristic Scheduling Approach with Primavera P6 EPPM Integration. Algorithms 2024, 17, 230.
https://doi.org/10.3390/a17060230
AMA Style
Ninpan K, Huang S, Vitillo F, Assaad MA, Benmiloud Bechet L, Plana R.
Mitigating Co-Activity Conflicts and Resource Overallocation in Construction Projects: A Modular Heuristic Scheduling Approach with Primavera P6 EPPM Integration. Algorithms. 2024; 17(6):230.
https://doi.org/10.3390/a17060230
Chicago/Turabian Style
Ninpan, Khwansiri, Shuzhang Huang, Francesco Vitillo, Mohamad Ali Assaad, Lies Benmiloud Bechet, and Robert Plana.
2024. "Mitigating Co-Activity Conflicts and Resource Overallocation in Construction Projects: A Modular Heuristic Scheduling Approach with Primavera P6 EPPM Integration" Algorithms 17, no. 6: 230.
https://doi.org/10.3390/a17060230
APA Style
Ninpan, K., Huang, S., Vitillo, F., Assaad, M. A., Benmiloud Bechet, L., & Plana, R.
(2024). Mitigating Co-Activity Conflicts and Resource Overallocation in Construction Projects: A Modular Heuristic Scheduling Approach with Primavera P6 EPPM Integration. Algorithms, 17(6), 230.
https://doi.org/10.3390/a17060230