Gao, Y.; Wang, Q.; Feng, Y.; Zheng, H.; Zheng, B.; Tan, J.
An Energy-Saving Optimization Method of Dynamic Scheduling for Disassembly Line. Energies 2018, 11, 1261.
https://doi.org/10.3390/en11051261
AMA Style
Gao Y, Wang Q, Feng Y, Zheng H, Zheng B, Tan J.
An Energy-Saving Optimization Method of Dynamic Scheduling for Disassembly Line. Energies. 2018; 11(5):1261.
https://doi.org/10.3390/en11051261
Chicago/Turabian Style
Gao, Yicong, Qirui Wang, Yixiong Feng, Hao Zheng, Bing Zheng, and Jianrong Tan.
2018. "An Energy-Saving Optimization Method of Dynamic Scheduling for Disassembly Line" Energies 11, no. 5: 1261.
https://doi.org/10.3390/en11051261
APA Style
Gao, Y., Wang, Q., Feng, Y., Zheng, H., Zheng, B., & Tan, J.
(2018). An Energy-Saving Optimization Method of Dynamic Scheduling for Disassembly Line. Energies, 11(5), 1261.
https://doi.org/10.3390/en11051261