Li, J.; Li, H.; He, P.; Xu, L.; He, K.; Liu, S.
Flexible Job Shop Scheduling Optimization for Green Manufacturing Based on Improved Multi-Objective Wolf Pack Algorithm. Appl. Sci. 2023, 13, 8535.
https://doi.org/10.3390/app13148535
AMA Style
Li J, Li H, He P, Xu L, He K, Liu S.
Flexible Job Shop Scheduling Optimization for Green Manufacturing Based on Improved Multi-Objective Wolf Pack Algorithm. Applied Sciences. 2023; 13(14):8535.
https://doi.org/10.3390/app13148535
Chicago/Turabian Style
Li, Jian, Huankun Li, Pengbo He, Liping Xu, Kui He, and Shanhui Liu.
2023. "Flexible Job Shop Scheduling Optimization for Green Manufacturing Based on Improved Multi-Objective Wolf Pack Algorithm" Applied Sciences 13, no. 14: 8535.
https://doi.org/10.3390/app13148535
APA Style
Li, J., Li, H., He, P., Xu, L., He, K., & Liu, S.
(2023). Flexible Job Shop Scheduling Optimization for Green Manufacturing Based on Improved Multi-Objective Wolf Pack Algorithm. Applied Sciences, 13(14), 8535.
https://doi.org/10.3390/app13148535