Zhang, X.; Zhao, D.; Shi, X.; Gao, X.; Zhang, Y.; Wang, S.
Investigation into the Impacts of Cover-and-Cut Top-Down Metro Station Construction on Adjacent Buildings: A Case Study. Buildings 2025, 15, 4149.
https://doi.org/10.3390/buildings15224149
AMA Style
Zhang X, Zhao D, Shi X, Gao X, Zhang Y, Wang S.
Investigation into the Impacts of Cover-and-Cut Top-Down Metro Station Construction on Adjacent Buildings: A Case Study. Buildings. 2025; 15(22):4149.
https://doi.org/10.3390/buildings15224149
Chicago/Turabian Style
Zhang, Xiaojiao, Dajun Zhao, Xin Shi, Xikun Gao, Yi Zhang, and Shengda Wang.
2025. "Investigation into the Impacts of Cover-and-Cut Top-Down Metro Station Construction on Adjacent Buildings: A Case Study" Buildings 15, no. 22: 4149.
https://doi.org/10.3390/buildings15224149
APA Style
Zhang, X., Zhao, D., Shi, X., Gao, X., Zhang, Y., & Wang, S.
(2025). Investigation into the Impacts of Cover-and-Cut Top-Down Metro Station Construction on Adjacent Buildings: A Case Study. Buildings, 15(22), 4149.
https://doi.org/10.3390/buildings15224149