Next Article in Journal
A Model Based on Neural Network to Predict Surface Settlement During Subway Station Construction: A Case Study of the Dongba-Zhongjie Station in Beijing, China
Next Article in Special Issue
Vibration Characteristics of Double-Shield TBM Cutterhead Under Rock–Machine Interaction Excitation
Previous Article in Journal
SABO-Optimized VMD for Seismic Damage Assessment of Frame Structures Considering Soil–Structure Interaction
Previous Article in Special Issue
Numerical Analysis on the Effect of Geometric Parameters of Reverse Fault on Tunnel Mechanical Response
 
 
Article

Article Versions Notes

Buildings 2025, 15(11), 1820; https://doi.org/10.3390/buildings15111820
Action Date Notes Link
article xml file uploaded 26 May 2025 11:55 CEST Original file -
article xml uploaded. 26 May 2025 11:55 CEST Update https://www.mdpi.com/2075-5309/15/11/1820/xml
article pdf uploaded. 26 May 2025 11:55 CEST Version of Record https://www.mdpi.com/2075-5309/15/11/1820/pdf
article html file updated 26 May 2025 11:58 CEST Original file -
article html file updated 25 June 2025 06:06 CEST Update https://www.mdpi.com/2075-5309/15/11/1820/html
Back to TopTop