Next Article in Journal
Impact of Polypropylene Fiber on the Mechanical and Physical Properties of Pervious Concrete: An Experimental Investigation
Next Article in Special Issue
Building Water Quality Commissioning in Healthcare Settings: Reducing Legionella and Water Contaminants Utilizing a Construction Scheduling Method
Previous Article in Journal
Mapping the Barriers of Big Data Process in Construction: The Perspective of Construction Professionals
Previous Article in Special Issue
Development of a BIM-Enabled Automated Cost Segregation System
 
 
Font Type:
Arial Georgia Verdana
Font Size:
Aa Aa Aa
Line Spacing:
Column Width:
Background:
Article

Determining the Factors Influencing Construction Project Management Performance Improvement through Earned Value-Based Value Engineering Strategy: A Delphi-Based Survey

1
Department of Civil Engineering, Science and Research Branch, Islamic Azad University, Tehran 14778-93855, Iran
2
Department of Civil Engineering, Isfahan (Khorasgan) Branch, Islamic Azad University, Isfahan 81551-39998, Iran
3
Department of Industrial Engineering, South Tehran Branch, Islamic Azad University, Tehran 15847-43311, Iran
*
Author to whom correspondence should be addressed.
Buildings 2023, 13(8), 1964; https://doi.org/10.3390/buildings13081964
Submission received: 5 June 2023 / Revised: 17 July 2023 / Accepted: 30 July 2023 / Published: 1 August 2023
(This article belongs to the Special Issue Advances in Project Management in Construction)

Abstract

Proper planning and management of construction projects have long been regarded as a necessity. The ability to make sound decisions and solve problems using appropriate performance reports related to the project implementation process are the two most key factors in controlling the performance of construction project management. Even though these factors considerably contribute to controlling precise project performance, previous research has failed to investigate them to their fullest potential. Therefore, this research seeks to fill the existing gap by determining the influential factors on construction project management performance through earned value-based value engineering strategy. In this line, a comprehensive literature analysis was undertaken to extract the influential factors on construction project management performance. Then, three rounds of a Delphi survey were conducted to consolidate the influential factors. There were a total of 39 factors that were grouped into four categories. The identified influential factors were then evaluated through the analysis of quantitative data. The findings showed that the dimension of “Engineering economics” was ranked first in terms of importance, followed by “Project management performance”, “Value engineering approach”, and “Earned value management” at the second to fourth ranks, respectively. The overall ranking of the factors placed “Project Stakeholder Management” in the first position and “Project Management Software” in the bottom place. It is anticipated that the key findings and effective recommendations of this study will considerably contribute to the improvement of decisions on project planning and improve the performance of construction project management while enhancing different stakeholders’ understanding of the most influential factors on the performance of construction project management.
Keywords: construction project; project management performance; value engineering; earned value; Delphi technique construction project; project management performance; value engineering; earned value; Delphi technique

Share and Cite

MDPI and ACS Style

Nejatyan, E.; Sarvari, H.; Hosseini, S.A.; Javanshir, H. Determining the Factors Influencing Construction Project Management Performance Improvement through Earned Value-Based Value Engineering Strategy: A Delphi-Based Survey. Buildings 2023, 13, 1964. https://doi.org/10.3390/buildings13081964

AMA Style

Nejatyan E, Sarvari H, Hosseini SA, Javanshir H. Determining the Factors Influencing Construction Project Management Performance Improvement through Earned Value-Based Value Engineering Strategy: A Delphi-Based Survey. Buildings. 2023; 13(8):1964. https://doi.org/10.3390/buildings13081964

Chicago/Turabian Style

Nejatyan, Esmaeil, Hadi Sarvari, Seyed Abbas Hosseini, and Hassan Javanshir. 2023. "Determining the Factors Influencing Construction Project Management Performance Improvement through Earned Value-Based Value Engineering Strategy: A Delphi-Based Survey" Buildings 13, no. 8: 1964. https://doi.org/10.3390/buildings13081964

APA Style

Nejatyan, E., Sarvari, H., Hosseini, S. A., & Javanshir, H. (2023). Determining the Factors Influencing Construction Project Management Performance Improvement through Earned Value-Based Value Engineering Strategy: A Delphi-Based Survey. Buildings, 13(8), 1964. https://doi.org/10.3390/buildings13081964

Note that from the first issue of 2016, this journal uses article numbers instead of page numbers. See further details here.

Article Metrics

Back to TopTop